使用组合工具高效安置减压井

A. Pedro, D. Feltracco, A. Pasquale, E. Gravante
{"title":"使用组合工具高效安置减压井","authors":"A. Pedro, D. Feltracco, A. Pasquale, E. Gravante","doi":"10.2118/198760-MS","DOIUrl":null,"url":null,"abstract":"\n A Well with plug set in both tubing was sabotaged and even after initially capping the well, it was observed that attempting to kill the Target Well via surface pumping was abortive.\n Therefore, in order to achieve well control, drilling a relief well became imperative and required some critical decision to be taken. This include location selection, type fluid to be used in drilling, the casing setting depth, downhole measuring tools for use, as well as contractors needed in achieving success in a suitation of incomplete well survey data.\n This paper presents how this keys needs were met in drilling the Relief Well planned for 97days trouble free and performed in 107days from spud to hitting Target Well. The success was on single attempt in spite of it having an incomplete survey record acquired 49 years earlier.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"78 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Efficient Placement of Relief Well Using Combination of Tools\",\"authors\":\"A. Pedro, D. Feltracco, A. Pasquale, E. Gravante\",\"doi\":\"10.2118/198760-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A Well with plug set in both tubing was sabotaged and even after initially capping the well, it was observed that attempting to kill the Target Well via surface pumping was abortive.\\n Therefore, in order to achieve well control, drilling a relief well became imperative and required some critical decision to be taken. This include location selection, type fluid to be used in drilling, the casing setting depth, downhole measuring tools for use, as well as contractors needed in achieving success in a suitation of incomplete well survey data.\\n This paper presents how this keys needs were met in drilling the Relief Well planned for 97days trouble free and performed in 107days from spud to hitting Target Well. The success was on single attempt in spite of it having an incomplete survey record acquired 49 years earlier.\",\"PeriodicalId\":11250,\"journal\":{\"name\":\"Day 3 Wed, August 07, 2019\",\"volume\":\"78 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, August 07, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/198760-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, August 07, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198760-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一口两根油管都装有桥塞的井被破坏了,即使在最初封顶之后,通过地面泵送封死目标井的尝试也失败了。因此,为了实现井控,钻井减压井势在必行,需要做出一些关键的决定。这包括位置选择、钻井中使用的流体类型、套管下入深度、使用的井下测量工具,以及在井测数据不完整的情况下取得成功所需的承包商。本文介绍了减压井是如何满足这些关键需求的,从开钻到击中目标井,减压井计划在97天内无故障,在107天内完成。尽管它在49年前就有了不完整的调查记录,但这是一次成功的尝试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Efficient Placement of Relief Well Using Combination of Tools
A Well with plug set in both tubing was sabotaged and even after initially capping the well, it was observed that attempting to kill the Target Well via surface pumping was abortive. Therefore, in order to achieve well control, drilling a relief well became imperative and required some critical decision to be taken. This include location selection, type fluid to be used in drilling, the casing setting depth, downhole measuring tools for use, as well as contractors needed in achieving success in a suitation of incomplete well survey data. This paper presents how this keys needs were met in drilling the Relief Well planned for 97days trouble free and performed in 107days from spud to hitting Target Well. The success was on single attempt in spite of it having an incomplete survey record acquired 49 years earlier.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信