Day 2 Tue, November 13, 2018最新文献

筛选
英文 中文
Enhancing NGL Recovery Through Utilized Design Margins 利用设计余量提高天然气水合物回收率
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/193340-ms
Mariam Al Ali, Mohamed Salem Al Matroushi
{"title":"Enhancing NGL Recovery Through Utilized Design Margins","authors":"Mariam Al Ali, Mohamed Salem Al Matroushi","doi":"10.2118/193340-ms","DOIUrl":"https://doi.org/10.2118/193340-ms","url":null,"abstract":"\u0000 In line with our quest to improve performance, optimize efficiency, and increase profitability, ADNOC Gas Processing is committed to ensure process design optimization by following best practices that add significant value to its gas business and industry. This report will outline how we were able to increase our C3+ recovery and thus the NGL production of BuHasa Train 2 by safely utilizing the existing design envelope and available design margins.\u0000 Although, operating a plant beyond its design capacity is not a new concept, process and HSE assessments are a must before proceeding. These efficiency enhancements can be implemented without any capital investment and also strengthen a plant's readiness to deal with any future challenges in plant performance. In gas processing plant such as NGL extraction, process fluid pressure is an important factor which can affect the plant characteristics. The influence of different values of pressure drop in various equipment needs to be realized as it can affect the quality and quantity of the process outputs.\u0000 An in-house feasibility study has been conducted to evaluate the possibility of increasing the HP compressor discharge pressure by 1 bar over its current operating pressure. The study indicated that it was possible to enhance the train's efficiency by increasing C3+ recovery, leading to an increase in NGL production and therefore a profitability increase.\u0000 The study was completed after the plant facilities were comprehensively evaluated for process safety and operability, as well as analyzed improvements in terms of C3+ recovery and NGL production.\u0000 A successful \"Field Test Run\" for 10 days were conducted to validate the predictions of the study to operate the HP compressors at 1 bar higher.\u0000 The product specification, quantity and plant operating costs are important parameters and balancing them will determine the optimum pressure distribution in the process and consequently realize our benefits. Hence, during the test run, the revised operating conditions were implemented and achieved safely without any major modification or upset to the facilities. As a result, the following cost benefits were realized: C3 + Recovery increased by around ≈ 0.2 wt.%NGL production increased by around ≈ 35 Ton/dayRevenues increased by around ≈ 2.8 MM US$/YearOperating cost increased by around≈ 220000 US$/Year","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"13 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87242977","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Value of Integrated Borehole Image Analysis to Refine Geological Models: An Example From the Greater Burgan Field, Kuwait 综合钻孔图像分析在改进地质模型中的价值——以科威特Greater Burgan油田为例
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/193222-MS
B. Al-Enezi, B. Kostic, Nicola Foote, J. Filak, F. Al-Mahmeed, O. Al-Shammari, M. Bertouche
{"title":"The Value of Integrated Borehole Image Analysis to Refine Geological Models: An Example From the Greater Burgan Field, Kuwait","authors":"B. Al-Enezi, B. Kostic, Nicola Foote, J. Filak, F. Al-Mahmeed, O. Al-Shammari, M. Bertouche","doi":"10.2118/193222-MS","DOIUrl":"https://doi.org/10.2118/193222-MS","url":null,"abstract":"\u0000 Resistivity image logs are high-resolution tools that can help to unravel the depositional and structural organisation in a wellbore. They provide a particularly powerful dataset when calibrated against core, maximising their benefit for reservoir characterisation. This paper shows examples how very detailed image assessment from selected wells in the Greater Burgan Field has helped to constrain the stratigraphic model and depositional interpretations of the Cretaceous Burgan and Wara reservoirs.\u0000 A multidisciplinary study of 123 cored wells, integrating core sedimentology, petrography, bio- and chemostratigraphy, wireline well and resistivity image logs, has delivered a robust stratigraphic and depositional framework for one of the most important reservoirs in the world's largest siliciclastic oil field. A descriptive image facies scheme that has been calibrated against core and conventional well logs captures the lithological variation, sedimentary features and surfaces of the reservoir, providing a detailed proxy for the sedimentological evaluation of uncored intervals and wells.\u0000 The sand-rich lower Burgan (4S) comprises fine to very coarse-grained fluvial channel sandbodies that are locally separated by laterally restricted mudrock baffles. Image and core analyses suggest that the majority of the sandstones are high-angle cross-stratified and form stacked barforms within amalgamated channel sandbodies. Their consistent orientation towards the NE-E supports a low-sinuosity (braided) fluvial system resulting in a relatively simple, sheet-like depositional architecture across the field. Although slightly finer grained, the cored middle Burgan channel sandbodies (3SM) are similar to those in the lower Burgan. However, palaeoflow data from the imaged wells show a higher directional spread in the order of c.60-90° with a dominantly N to E orientation of the sandy barforms. Careful analysis of the orientation of the bounding surfaces between the sandstone packages indicates nearly equal proportions of obliquely and roughly parallel dip orientations in some wells. This suggests the formation of at least some lateral (point) bars and possibly the presence of higher sinuosity channels implying that sandbody architecture and fluid flow pathways could be more complex in the middle Burgan relative to the lower Burgan.\u0000 The examples from the Burgan and Wara Formations highlight the value of integrated image analysis for reservoir characterisation by delivering a consistent descriptive framework, embedding different datasets.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"28 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86692315","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Optimizing the Drilling Completion Brine Design in the Presence of Martensitic Stainless Steel Equipment 马氏体不锈钢设备下完井盐水优化设计
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/192941-MS
G. Pimenta, D. Abdullah, Mohamed Awadh Alhammami, A. ElBarbary, T. Waheed, M. Q. Hussain, F. Abdulsallam
{"title":"Optimizing the Drilling Completion Brine Design in the Presence of Martensitic Stainless Steel Equipment","authors":"G. Pimenta, D. Abdullah, Mohamed Awadh Alhammami, A. ElBarbary, T. Waheed, M. Q. Hussain, F. Abdulsallam","doi":"10.2118/192941-MS","DOIUrl":"https://doi.org/10.2118/192941-MS","url":null,"abstract":"\u0000 Completion fluids, typically chloride or bromide brines, based on density requirements are used to control the well during some operations and remain either in the tubing until well is put on production or in the annulus above the packer for the duration of well life.\u0000 Under normal conditions, the well casing is a closed system where the brine is protected from ingress of H2S/CO2 and oxygen. However, brines may be exposed to oxygen ingress from the surface through a leak at the wellhead, and /or to H2S / CO2 ingress through a potential leak through the packer, their dissolution in the brine, affecting significantly the corrosion resistance of the steel.\u0000 In spite of its proven efficiency with martensitic stainless steels, sodium bromide based completion brines are quite expensive. To explore possible less expensive alternatives, without compromising corrosion resistance of the tubing, ADNOC Onshore conducted a comprehensive testing program to identify suitable, less expensive alternative brine systems with the same or improved corrosion behavior in well conditions.\u0000 In the study, the general and pitting corrosion, and the Sulphide Stress Cracking (SSC) resistance of 13Cr and S13Cr samples in NaCl, NaBr and CaCl2 brines were assessed.\u0000 Samples were tested for a period of 30 days in three brine systems, under inert conditions, under 1.6psi (6.5psi) H2S / 165psi CO2, at 120°C and under oxygen ingress conditions at 49°C, in an autoclave. Pitting and general corrosion were assessed using weight loss coupons, whereas the susceptibility to SSC was tested using C-ring specimens in accordance with NACE TM0177 - Method C, at stress levels of 0,2% of the material proof stresses.\u0000 Relative pitting susceptibility of the steels under oxygen contamination of the different brine systems was also assessed by electrochemical polarisation tests, at 49°C.\u0000 The most significant results obtained is that none of the steels presented SSC under all conditions and brine systems. For both alloys, in all test conditions, the general corrosion rates decreased in the order CaCl2 > NaBr > NaCl brines, the exposure to H2S/CO2 presenting 2 to 5 times higher corrosion rates as compared to the inert gas conditions, with the 13Cr alloy presenting higher rates in all conditions, as expected.\u0000 Pitting was inexistent / negligible in all testing conditions for S13Cr. In sour environment and in oxygen ingress conditions, 13Cr showed relevant pitting in all brines. Under oxygen contamination, deeper and broader pits were observed in the NaCl as compared to the CaCl2 brine, while no pitting was found on NaBr brine specimens. Electrochemical polarisation tests showed that the pitting onset and the repassivation potentials were shifting towards the cathodic direction in the order NaCl, NaBr and CaCl2.\u0000 The conclusions of the study is that chloride brine systems are a technically viable option for application with S13Cr, without introducing additional corrosion or HSE risks, leading to cos","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"19 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89462216","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Full Field Scale Hydrocarbon Gas Enhanced Oil Recovery Project in Offshore Vietnam -Response Analysis and Optimization Practice in Early Stage 越南海上全油田规模烃类气提高采收率项目——早期响应分析与优化实践
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/193214-ms
Yohei Kawahara, Yukiya Sako, Zhenjie Chai, Chuyen Nguyen Chu, Takahiro Murakami, Aiko Nishizaki, Thien Dao Cong
{"title":"Full Field Scale Hydrocarbon Gas Enhanced Oil Recovery Project in Offshore Vietnam -Response Analysis and Optimization Practice in Early Stage","authors":"Yohei Kawahara, Yukiya Sako, Zhenjie Chai, Chuyen Nguyen Chu, Takahiro Murakami, Aiko Nishizaki, Thien Dao Cong","doi":"10.2118/193214-ms","DOIUrl":"https://doi.org/10.2118/193214-ms","url":null,"abstract":"\u0000 Rang Dong field in offshore Vietnam has been producing oil since 1998 from a Lower Miocene sandstone reservoir. Upon the achievement of peak oil production in 2002, gaslift and water injection have been applied to maintain oil production. With primary and secondary oil recovery applications underway, a tertiary recovery technique by immiscible hydrocarbon gas enhanced oil recovery (\"HCG-EOR\") had been studied since 2009. Subsequent to a successful Pilot Test in 2011, a full field scale HCG-EOR with water-alternating-gas (\"WAG\") scheme has been implemented since 2014. This HCG-EOR application was the first commercial EOR project in offshore Vietnam and attracted attentions in the region. The project has been successfully executed to effectively minimize the decline and contribute approximately 30 percent of oil production rate as of the date of this paper. Numerous efforts for WAG pattern optimization and accurate incremental oil evaluation were attempted.\u0000 This paper introduces coupled approach of well performance analysis and reservoir simulation study applied to the WAG optimization and incremental oil evaluation. In line with the theoretical reservoir responses of immiscible gas flooding, all the producers were classified into 3 groups by different types of performances following the WAG injection. By coloring the different groups on the well location map, reservoir engineers were able to understand the regional characteristics of response and managed to optimize WAG by allocating more gas to the regions where incremental production were dominated by tertiary recovery mechanism. For incremental oil evaluation, either decline curve analysis (\"DCA\") or compositional reservoir simulation is common practice, however, both techniques have its strengths and weaknesses. In this study, reservoir simulations for \"past\" incremental oil evaluation are always double-checked by DCA, and then prediction runs are performed. Such exercise could deliver the incremental oil evaluation of high confidence.\u0000 In addition to discussion related to such subsurface evaluations, this paper also introduces lessons leant and mitigations on actual field operation with focus on intensified sand production, injectivity deterioration and back pressure surge after gas breakthrough.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"68 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89817839","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
SCCO2 Flushing Technology: The Supercritical Revolution SCCO2冲洗技术:超临界革命
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/192830-MS
E. Amundsen, M. Juul
{"title":"SCCO2 Flushing Technology: The Supercritical Revolution","authors":"E. Amundsen, M. Juul","doi":"10.2118/192830-MS","DOIUrl":"https://doi.org/10.2118/192830-MS","url":null,"abstract":"\u0000 \u0000 \u0000 Research indicate that 80% of all failures in fluid transfer systems are caused by contamination.\u0000 Contamination causes huge gaps in both safety and reliability and shortening the lifespan of, systems. Subsea systems are often controlled by very long umbilical's/control-lines (>6 km) with no efficient cleaning option. It is necessary to clean these lines with turbulent flow, which can be difficult to obtain with conventional cleaning fluids\u0000 \u0000 \u0000 \u0000 With the Super Critical CO2 (SCCO2) technology, it is now possible to clean very long narrow pipes with turbulent flow, not possible with conventional flushing methods. Due to the very low viscosity, diffusivity, and no surface tension of the CO2, it possible to reach a level of cleanness never seen before. Using the pressure & temperature it is possible to manipulate the density needed to carry the particles. When the particles are carried out of the system, the liquid CO2 is converted into gas in the separator, and the contamination suspended in the CO2 drops out.\u0000 \u0000 \u0000 \u0000 This technology has been proven on a proof of concept test (onshore) with two 3rd party participance, flushing a 6,5km ¼\" dual control-line. This line was cleaned with laminar flow (Reynolds No. under 3000) and had a certificate that said it was cleaned to NAS1638 grade 6. It was proved, using SCCO2 with a Reynolds No. of 42.000, that the line was not clean, [and was NAS1638 grade 12]. It was then cleaned to NAS1638 grade 3, best we have ever seen. Also, the SCCO2 technology was proved offshore, by cleaning a 38km ½\"ID Umbilical for Wintershall Noordzee, from NAS1638 grade 12 to Grade 3 with a Reynolds No. of over 30.000. This umbilical had the same issue as in the proof of concept test. The line was claimed to be clean, but the operator experienced that the chemical injection line was blocked by contamination. This caused a lot of shutdowns and was very costly. After the umbilical was cleaned with the SCCO2 technology, the operator has not had any shutdowns due to contamination or blockages for over 9 months now.\u0000 \u0000 \u0000 \u0000 With the SCCO2 technology, it is possible to clean or unblock very long tubes/lines, to a cleanness never seen before. The cleanliness and unblocking possibilities are a result of the unique characteristics of the CO2, and the high Reynolds No. possible by using CO2. This opens more possibilities that previously was not possible and lacking in the industry. It will make the systems more safe, reliable and reduce cost and increase the production up-time.\u0000","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"42 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89517191","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Acid-Soluble Thixotropic Cement System for Lost Circulation Challenges 酸溶触变水泥体系用于漏失挑战
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/193168-MS
Rahul Jadhav, Sandip P Patil
{"title":"Acid-Soluble Thixotropic Cement System for Lost Circulation Challenges","authors":"Rahul Jadhav, Sandip P Patil","doi":"10.2118/193168-MS","DOIUrl":"https://doi.org/10.2118/193168-MS","url":null,"abstract":"\u0000 Lost circulation is a recurring and costly challenge for the oil and gas industry. Losses range from seepage to total and financial effects, including nonproductive time and remedial operational expenses, which can increase potential risks to the operator. To address this issue, a tunable cement-based lost circulation treatment solution has been developed that is most suitable for partial to total losses, particularly when particulate-based solutions are not effective; the solution is primarily intended to cure losses while drilling. Unlike conventional lost circulation materials (LCMs) that cure losses by mechanical bridging of particles, the thixotropic cement solution's effectiveness arises from its unique chemical composition, which is ideal when flow paths are too large to be plugged by particles.\u0000 The new lost circulation treatment solution is thixotropic with a density range of 10 to 15 lbm/gal working in temperatures up to 250°F. The formulation can be mixed with fresh water, seawater, or seawater with up to 14% NaCl. It is designed and tested in accordance with API RP 10B2 (2013) procedures for thickening time (TT), compressive strength, static gel strength, fluid loss, and rheology. During the TT on-off-on test, the formulation builds gel strength when shear is reduced and regains fluidity when shear is reapplied.\u0000 The formulation developed rapid static gel strength and an early compressive strength up to 500 psi. The reversible gelation behavior is demonstrated through multiple shear on-off cycles. This solution is operationally convenient to apply because it can be pumped through the bottomhole assembly (BHA), thus reducing trip times. Because of its acid solubility, it can be used across production zones.\u0000 The unique properties of gaining rapid gel strength reversibly and a good compressive strength render this solution effective for treating a wide range of lost circulation events during drilling. A wider density window might minimize the potential risk of inflow when treating losses.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"36 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78398957","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 14
Northern Sea Route as the Main Driver for the Arctic Development: Challenges with Infrastructure and Opportunities for International Cooperation 北方航道是北极开发的主动力:基础设施的挑战与国际合作的机遇
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/192980-MS
I. Akimova
{"title":"Northern Sea Route as the Main Driver for the Arctic Development: Challenges with Infrastructure and Opportunities for International Cooperation","authors":"I. Akimova","doi":"10.2118/192980-MS","DOIUrl":"https://doi.org/10.2118/192980-MS","url":null,"abstract":"\u0000 Arctic's huge reserves potential development was blocked for many years by the lack of accessible and all-year open for navigation transport routes. In spite of the fact that the Northern Sea Route is the shortest way from Europe to Asia, currently about 75% of the total cargo turnover delivers through the south corridor via the Suez Canal and the Mediterrenian sea, but the turnover via the Northern Sea Route is growing rapidly over the past years. Due to the strategic allocation of the Northern Sea Route it attracts enormous attention of the international companies now. This paper highlights challenges with the development of the Northern Sea Route nowadays along with the opportunities for international cooperation.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"20 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75765567","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Clay Free Invert Emulsion Drilling Fluid System- An Innovative Rheology Modifier Which Provides Flat Rheology for Deep Water Drilling and Viscosifier for Clay Free System 无粘土反相乳化钻井液体系——一种创新的流变改性剂,为深水钻井提供平坦的流变特性,为无粘土体系提供增粘剂
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/192618-MS
Arvind D. Patel, Sakshi Indulkar, Vikas Chavan, Pradeep Maddheshiya, Megha Asrani, S. Thakur, Ashutosh Kumar Singh, V. Gupta
{"title":"Clay Free Invert Emulsion Drilling Fluid System- An Innovative Rheology Modifier Which Provides Flat Rheology for Deep Water Drilling and Viscosifier for Clay Free System","authors":"Arvind D. Patel, Sakshi Indulkar, Vikas Chavan, Pradeep Maddheshiya, Megha Asrani, S. Thakur, Ashutosh Kumar Singh, V. Gupta","doi":"10.2118/192618-MS","DOIUrl":"https://doi.org/10.2118/192618-MS","url":null,"abstract":"\u0000 Exploration and Production Operators prefer a non-damaging non-aqueous fluid (NAF) for drilling Reservoir. One of the requirements of non-damaging system is a clay free system and it should perform as good as any NAF Fluid. For drilling in deep water environment, it is necessary to have flat rheology of NAF over a wide range of temperatures. An innovative polymeric rheology modifier was used to develop Clay Free Invert Drilling Fluid (CFIDF) which provides dual function to achieve a clay free system as well as flat rheology when measured over a wide range of temperatures from 40 to 150 °F.\u0000 The flat rheology is required in offshore deep water drilling due to varying temperature profile from 4 °C at the bottom of sea to as high as 100 °C or even higher at bottom of hole. Lower temperatures increase the rheology leading to higher ECD and at higher temperatures the rheology is lowered leading to hole cleaning issues. Flat rheology profile minimizes or eliminates such adverse effects on ECD or hole cleaning activity.\u0000 The newly developed clay free system utilizes a single rheology modifier component to provide dual functions of providing true clay free system and offers flat rheological profile without sacrificing the vital mud parameters such as emulsion stability, fluid loss control and rheology. In addition, the system uses a new rheology modifier that provides a temperature-independent rheology profile for hole cleaning, barite suspension, ECD management. The system can be formulated for deep-water applications with mud weights up to 18.0 lb/gal and bottom hole temperatures up to 350°F.\u0000 Recent successful field trials as a clay free system for drilling reservoir indicated that the new system is easy to maintain and provides good fluid performance in terms of drilling rate, ECD management, lost circulation control and hole cleaning. The product provides an excellent rheological profile and was used in the field at a low dosage of 1 ppb. Even at this low dosage LSRV was above 10 in 8 ½″ Hole with yield point of greater than 15 lbs/100 sq.ft. When the system was contaminated with a severe saltwater flow, there were no fluid-related problems before the synthetic/water ratio was restored. The new fluid system exhibits flat rheology profiles and non-progressive gel structures. The system showed excellent hole cleaning with excellent thixotropic properties. This resulted in a noticeable reduction of lost circulation potential in lost circulation prone areas due to manageable ECD.\u0000 An innovative rheology modifier which provides clay free system and offering flat rheology profile has been developed and successfully used in field. The rheology modifier can minimize or totally eliminate the organophilic clay to improve the quality of non-damaging reservoir drilling fluid.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"49 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72870172","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Investigation of Smart Water Flooding in Sandstone Reservoirs: Experimental and Simulation Study Part2 砂岩油藏智能水驱研究:实验与模拟研究(二
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/193238-MS
Hasan N. Al-Saedi, R. Flori, Alsaba Mortadha
{"title":"Investigation of Smart Water Flooding in Sandstone Reservoirs: Experimental and Simulation Study Part2","authors":"Hasan N. Al-Saedi, R. Flori, Alsaba Mortadha","doi":"10.2118/193238-MS","DOIUrl":"https://doi.org/10.2118/193238-MS","url":null,"abstract":"\u0000 In this paper, we considered the effect of water chemistry on water-rock interactions during seawater and smart water flooding of reservoir sandstone cores containing heavy oil. Oil recovery, surface reactivity tests, and multicomponent reactive transport simulation using CrunchFlow were conducted to better understand smart water flooding.\u0000 Secondary water flooding with FW at 25°C resulted in an ultimate oil recovery (UOR) of ~50% OOIP for all reservoir cores in this study. Formation water salinity was 104,550 ppm. FW was diluted twice to obtain SMW1. SMW2 was similar to SMW1 but depleted in divalent cations (Ca2+ and Mg2+). SMW3 was also similar to SMW1 but depleted in Mg2+ and SO42-, while SMW4 was the same as SMW1 but Ca2+ was diluted 100 times. Seawater salinity was 48300 ppm, which is close to the smart waters salinity (52275 ppm). No oil recovery was observed during SMW1 flooding, while softening SMW1 (SMW2) resulted in a significant additional oil recovery OOIP. Depleting Mg2+ and SO42- resulted in additional oil recovery but smaller than in SMW2. Diluting Ca2+ 100 times was the second best scenario coming after depleted Ca2+ in SMW2. The results of this study showed that the more diluted Ca2+ is in the injected brine, the more additional oil recovery that can be obtained, even though the other divalent/monovalent cations/anions were increased or decreased or even depleted.\u0000 Other reservoir cores were allocated for surface reactivity test. The absence of an oil phase allows us to isolate the important water-rock reactions. The Ca2+, Mg2+, and SO42- effluents for all cores were matched using CrunchFlow, and then further investigations of the water-rock interactions were conducted. The reactive transport model showed that decreasing the Mg2+ concentration will decrease the number of the most effective kaolinite edges Si-O- and Al-O-, but was not as pronounced as that in present of Ca2+, which explains why lowering Mg2+ concentration gives lower additional oil recovery, and why lowering Ca2+ concentration gives higher additional oil recovery.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"3 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73228189","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Maximising Production of Lowest-Cost Oil and Gas from Existing Integrated Production Systems Using the Sweating the Asset Change Management Process 利用资产变更管理流程,从现有的集成生产系统中实现最低成本油气产量的最大化
Day 2 Tue, November 13, 2018 Pub Date : 2018-11-12 DOI: 10.2118/192848-MS
Kamran Awan, Mohammed Al Aufi, Hilal Al Salti, Hussain Al Noumani, Bijan Nabavi, Ali Al Ghaithy, K. Busaidi, Ali Al Harrasi, Ali Al Lamki, Rahima Al Mujaini, Mohammed Al Salhi, Seif Al Nadabi, A. Abri, Yousef Al Zaabi, S. Busaidi
{"title":"Maximising Production of Lowest-Cost Oil and Gas from Existing Integrated Production Systems Using the Sweating the Asset Change Management Process","authors":"Kamran Awan, Mohammed Al Aufi, Hilal Al Salti, Hussain Al Noumani, Bijan Nabavi, Ali Al Ghaithy, K. Busaidi, Ali Al Harrasi, Ali Al Lamki, Rahima Al Mujaini, Mohammed Al Salhi, Seif Al Nadabi, A. Abri, Yousef Al Zaabi, S. Busaidi","doi":"10.2118/192848-MS","DOIUrl":"https://doi.org/10.2118/192848-MS","url":null,"abstract":"\u0000 'Sweating the Asset’ is an integrated change management approach for maximizing cheap oil production from existing fields and facilities, without capital expenditure. ‘Sweating the Asset’ utilizes a Theory of Constraints approach to identify and focus on a production system's limiting factor on a daily, mid-term and long term basis.\u0000 The ‘Sweating the Asset’ goal was introduced as an organisational initiative in Q1 2017 with the aim of helping producing assets close their ‘gap to potential’ and operate as closely as possible to technical limit. The approach enables team leaders managing different components of the integrated production system to focus on a common goal and make aligned decisions.\u0000 The structured ‘Sweat the Asset’ process integrates components of the company's Lean Management System (LMS), including:Goal deployment: a process used to identify a SMART top-level goal, establish ‘line of sight’ to & from front-line teams within an asset, and align all involved to close their specific performance gaps via improvement metrics, visual management, Leader Standard Work (ensuring continuous engagement and support), and the use of Continuous Improvement tools (Lean projects, Kaizen events etc as appropriate).Horizon 1: the ‘Daily Production Huddle’ is an efficient process which brings together key stakeholders in the integrated production system, identifies the daily production constraint using relevant tools (incl. live limit diagrams & creaming curves) and helps them make decisions which optimise daily production and minimise deferment.Production System Optimisation (Horizon 2): is a process used to identify mid-term improvement opportunities via an integrated team approach using Lean, allowing it to be led by asset teams on a monthly and quarterly basis.\u0000 'Sweating the Asset’ has been deployed in 13 production systems within the organisation and currently at different levels of maturity. As an example of goal deployment, an EOR polymer injection facility with suboptimal performance, poor compliance with injection and viscosity requirements had resulted in a severe decline in oil production. In order to safeguard production and close an estimated production gap of 4000 barrels/day, a goal was set to improve polymer flood compliance from 40 % to 95 %. The goal was deployed via a ‘catch-ball’ exercise with field (operations) and office-based (subsurface) teams to agree gaps, metrics and commitment at the front line. The goal is owned jointly by the subsurface and operations asset leaders, who provide focused support for gap closure via regular, dedicated engagements built into their Leader Standard Work routines.\u0000 The plan for 2018 is to ensure that ‘Sweating the Asset’ is fully embedded and sustainable in all assets across the organisation. This may be seen as step change in, and the next level of Wells, Reservoir and Facilities Management (WRFM) maturity. This paper will primarily focus on the Goal Deployment process and strategy.","PeriodicalId":11208,"journal":{"name":"Day 2 Tue, November 13, 2018","volume":"17 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73660593","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信