Journal Industrial Servicess最新文献

筛选
英文 中文
Usulan pemilihan green supplier dengan metode fuzzy AHP dan fuzzy TOPSIS 拟议中的绿色供应商采用模糊的AHP和模糊的TOPSIS方法
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/12823
Putro Ferro Ferdinant, A. Bahauddin, Fadhela Ara Salma, Hadi Setiawan, Bobby Kurniawan
{"title":"Usulan pemilihan green supplier dengan metode fuzzy AHP dan fuzzy TOPSIS","authors":"Putro Ferro Ferdinant, A. Bahauddin, Fadhela Ara Salma, Hadi Setiawan, Bobby Kurniawan","doi":"10.36055/12823","DOIUrl":"https://doi.org/10.36055/12823","url":null,"abstract":"Received: 27 Oktober 2021 Revision: 29 Oktober 2021 Accepted: 1 November 2021 Permasalahan pemilihan supplier dalam pengambilan keputuasan yang melibatkan multi kriteria masih menjadi topik yang banyak dilakukan. Dalam kajian green supply chain management, kajian pemilihan green supplier menjadi salah satu topik kajian terbaru. Universitas Sultan Ageng Tirtayasa memiliki visi menjadi integrated smart and green campus. Untuk mendukung visi tersebut, unit UPPBJ perlu pertimbangan dalam melakukan pemilihan green supplier. Penelitian ini mengusulkan metode Fuzzy AHP untuk penilaian kriteria prioritas dalam pemilihan green supplier. Selain penentuan kriteria, penelitian ini juga mengusulkan metode Fuzzy TOPSIS dalam pemilihan alternatif supplier terbaik. Hasil penelitian diperoleh kriteria prioritas dalam green supplier adalah kriteria Fundamental dengan sub kriteria pengalaman projek. Sedangkan untuk pemilihan alternative supplier terbaik diperoleh hasil supplier A yang terpilih. Hasil pembobotan kriteria dan sub kriteria dapat dijadikan rekomendasi untuk melakukan pemilihan green supplier.","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129712116","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Variabel yang mempengaruhi kinerja pegawai Bapenda Kabupaten Serang pada masa pandemi
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.11573
Nuraida Wahyuni, Evi Febianti, Roy Satriadi
{"title":"Variabel yang mempengaruhi kinerja pegawai Bapenda Kabupaten Serang pada masa pandemi","authors":"Nuraida Wahyuni, Evi Febianti, Roy Satriadi","doi":"10.36055/jiss.v7i1.11573","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.11573","url":null,"abstract":"","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116386926","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Optimalisasi kapasitas produksi produk PDS Fender pada PT Arkha Jayanti Persada dengan theory of constraints menggunakan Lindo dan PomQm 优化PDS Fender产品生产能力的PT Arkha Jayanti方程与constraints理论使用Lindo和PomQm
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12049
Rivaldi Fajar Adhiputra
{"title":"Optimalisasi kapasitas produksi produk PDS Fender pada PT Arkha Jayanti Persada dengan theory of constraints menggunakan Lindo dan PomQm","authors":"Rivaldi Fajar Adhiputra","doi":"10.36055/jiss.v7i1.12049","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12049","url":null,"abstract":"","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"51 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128173611","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Penerapan lean manufacturing untuk mereduksi waste pada produksi spare part screw spindle set 日本精益制造公司merduksi废铁产品备件螺杆主轴组
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12338
Evi Febianti, Yusraini Muharni, K. Kulsum
{"title":"Penerapan lean manufacturing untuk mereduksi waste pada produksi spare part screw spindle set","authors":"Evi Febianti, Yusraini Muharni, K. Kulsum","doi":"10.36055/jiss.v7i1.12338","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12338","url":null,"abstract":"Received: 8 September 2021 Revision: 25 Oktober 2021 Accepted: 27 Oktober 2021 Aktifitas pada perusahaan yang tidak memiliki nilai tambah akan menimbulkan kerugian bagi perusahaan. Berdasarkan hasil wawancara dengan ketua produksi di PT.XYZ diketahui bahwa perusahaan ini mengalami keterlambatan waktu penyelesaian produk 1-2 hari setelah due date pesanan pelanggan. Pemborosan yang terjadi diidentifikasi menggunakan metode Waste Assessment Model dan Failure Mode Effect Analysis untuk selanjutnya diberikan usulan perbaikan. Tujuan penelitian ini adalah mengetahui waste yang paling dominan menggunakan metode WAM, mengetahui penyebab utama masalah dari waste yang paling dominan, mengetahui usulan perbaikan untuk meminimasi waste terbesar dan menghitung banyaknya waktu produksi yang dapat diminimalisasi ketika usulan perbaikan dilakukan. Hasil penelitian menunjukkan bahwa waste yang paling dominan menggunakan metode WAM adalah waiting (22%) dan defect (20%). Penyebab utama masalah dari waste yang paling dominan tersebut adalah pengulangan proses kerja dan kesalahan operator dalam membaca gambar. Usulan perbaikan yang dapat dilakukan adalah membuat SOP klasifikasi untuk produk cacat dan memberikan training pada operator khususnya dalam membaca gambar. Waktu yang dapat diminimalisasi setelah perbaikan memiliki selisih sebanyak 379,799 detik.","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"63 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116295399","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Pengukuran dan analisa efektivitas mesin pencetak paving menggunakan metode overall equipment effectiveness (OEE) 勘探和分析铺路机的有效性
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12336
Indira Kusuma Wardani, Fransiskus Tatas Dwi Atmaji, Judi Alhilman
{"title":"Pengukuran dan analisa efektivitas mesin pencetak paving menggunakan metode overall equipment effectiveness (OEE)","authors":"Indira Kusuma Wardani, Fransiskus Tatas Dwi Atmaji, Judi Alhilman","doi":"10.36055/jiss.v7i1.12336","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12336","url":null,"abstract":"Machine effectiveness is one of the important factors in the production process in a manufacturing company to produce goods. The paving molding machine is one of the machines used to produce black paving at PT XYZ. Based on historical data from the Engineering Maintenance Department, this machine has the highest breakdown frequency which has an impact on the low effectiveness and productivity of the machine. To overcome this problem, an analysis of the effectiveness of the paving molding machine was carried out using the Overall Equipment Effectiveness (OEE) method. OEE aims to analyze machine indicators, which consist of machine availability, performance efficiency, and the quality level of the machine's production. The results of the OEE analysis show that the value of the paving molding machine is 68.18% and is still below the Japan Institute of Plant Maintenance standard of 85%. Six Big Losses is used to determine the low OEE value arising from the production process, on the paving molding machine. From the results of the analysis, two dominant loss factors have the most influence on the effectiveness of the paving molding machine, namely the high value of reduced speed loss (51.92%) and idling and minor stoppages loss (23.69%). These two dominant loss factors are then analyzed using a fishbone diagram to obtain the root causes and proposed solutions.","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"552 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123265399","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Penentuan jumlah tenaga kerja dan perbaikan layout untuk meningkatkan service level dan mengurangi waktu antrian dengan menggunakan metode simulasi (studi kasus di apotek Cipta Farma, Bandung) 使用模拟方法(万隆版权药库个案研究)确定劳动力数量和布局,改善服务水平,减少工作时间
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12535
Tomy Jeremy, Vivi Arisandhy, David Try Liputra
{"title":"Penentuan jumlah tenaga kerja dan perbaikan layout untuk meningkatkan service level dan mengurangi waktu antrian dengan menggunakan metode simulasi (studi kasus di apotek Cipta Farma, Bandung)","authors":"Tomy Jeremy, Vivi Arisandhy, David Try Liputra","doi":"10.36055/jiss.v7i1.12535","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12535","url":null,"abstract":"","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133029367","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Mitigasi risiko rantai pasok industri furniture dengan menggunakan metode house of risk di IKM Sinar Muda 在新款气候中使用风险房屋的方法,降低家具行业供应链的风险
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12745
M. Ulfah
{"title":"Mitigasi risiko rantai pasok industri furniture dengan menggunakan metode house of risk di IKM Sinar Muda","authors":"M. Ulfah","doi":"10.36055/jiss.v7i1.12745","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12745","url":null,"abstract":"","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123950862","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Perancangan sistem informasi kependudukan Desa Sukamaju Kecamatan Labuan Kabupaten Pandeglang Provinsi Banten
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12771
Akbar Gunawan, Ani Umyati, K. Kulsum, Ade Irman Mutakin
{"title":"Perancangan sistem informasi kependudukan Desa Sukamaju Kecamatan Labuan Kabupaten Pandeglang Provinsi Banten","authors":"Akbar Gunawan, Ani Umyati, K. Kulsum, Ade Irman Mutakin","doi":"10.36055/jiss.v7i1.12771","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12771","url":null,"abstract":"","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125161154","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Optimasi biaya transportasi penentuan lokasi baru gudang distribusi menggunakan metode center of gravity di UMKM Batik Banten XYZ 使用Banten XYZ蜡染中心重力方法确定新配送仓库的优化成本
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12382
D. L. Trenggonowati, Asep Ridwan, Akbar Gunawan
{"title":"Optimasi biaya transportasi penentuan lokasi baru gudang distribusi menggunakan metode center of gravity di UMKM Batik Banten XYZ","authors":"D. L. Trenggonowati, Asep Ridwan, Akbar Gunawan","doi":"10.36055/jiss.v7i1.12382","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12382","url":null,"abstract":"","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125965687","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Information system improvement (Case Study: Noodle Factory X, Purwokerto, Central Java, Indonesia) 信息系统改进(案例研究:印度尼西亚中爪哇普沃克尔托X面馆)
Journal Industrial Servicess Pub Date : 2021-11-09 DOI: 10.36055/jiss.v7i1.12604
Raden Roro Christina, Vivi Arisandhy, Indah Victoria Sandroto, Khaterine Santika Wijaya
{"title":"Information system improvement (Case Study: Noodle Factory X, Purwokerto, Central Java, Indonesia)","authors":"Raden Roro Christina, Vivi Arisandhy, Indah Victoria Sandroto, Khaterine Santika Wijaya","doi":"10.36055/jiss.v7i1.12604","DOIUrl":"https://doi.org/10.36055/jiss.v7i1.12604","url":null,"abstract":"Received: 4 Oktober 2021 Revision: 30 Oktober 2021 Accepted: 2 november 2021 A good information system would increase the company’s productivity. One of the most important thing that to be concerned was the procedures. Good and organized procedures would create company standards. Through the research data collection through interview and observation, there were 6 (six) big procedures of Noodle Factory X, Purwokerto, Central Java, Indonesia, which were Material Purchasing Procedure, Material Arrival Procedure, Material Stock Recording Procedure, Finished Good Stock Recording Procedure, Finished Good Shipping Procedure, and Finished Good Selling Procedure. PIECES Analysis were used in this research to analyze the system, including Performance, Information, Economics, Control and Security, Efficiency, and Service. The overall results were material stock counting still used manual system and it could cause human error in doing it, and it was also not real-time count. If the material stock was already real-time count, the material stock recording procedure would not interfere the production process, so it could produce on time. The receipt was still manual, without the company’s identity such as logo and name of the company. Information was not realtime produced. Report service for the management was also a bit slow. Some recommendations were given, such as giving the signature/stamp on the receipt as a proof that it was the receipt that was issued by company, try to implement a simple computerized system, improve the Big Book (for writing the stock), separate the book for material stock and finished good stock at office and at the factory.","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121771290","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信