Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil最新文献

筛选
英文 中文
Pengaruh Pemanfaatan Limbah Kulit Kerang Bambu Sebagai Pengganti Sebagian Semen Terhadap Kuat Tekan Beton dengan Penggunaan Agregat Kasar Madura 使用竹子壳废料代替部分水泥的影响,用马杜拉粗骨料用力敲打混凝土
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2021-03-30 DOI: 10.25139/JPRS.V4I1.3360
Taurina Jemmy Irwanto, Agus Irmawan
{"title":"Pengaruh Pemanfaatan Limbah Kulit Kerang Bambu Sebagai Pengganti Sebagian Semen Terhadap Kuat Tekan Beton dengan Penggunaan Agregat Kasar Madura","authors":"Taurina Jemmy Irwanto, Agus Irmawan","doi":"10.25139/JPRS.V4I1.3360","DOIUrl":"https://doi.org/10.25139/JPRS.V4I1.3360","url":null,"abstract":"Concrete is a mixture of Portland cement, fine aggregate, coarse aggregate and water, the author tries to use local Madura crushed stone and bamboo shells as a partial substitute for cement to determine whether the effect of utilizing local waste and materials on the planned compressive strength of concrete. In addition to the use of local materials, it is used shellfish waste which is expected to be able to provide the latest innovations in the world of construction in the future. In this test, concrete is planned in the form of a cube of size 15x15x15 cm, and tested at the age of 7 days and 28 days for each variation of the mixture, the research was carried out using several variations of the concrete mixture, namely, 0%, 2%, 4% and 6% replacement of cement with shells. bamboo shells, where later the 0% variation will be the benchmark for each variation. From the results of testing the chemical content of bamboo clam shells, it was found that the content of lime (CaO) was 98.23%. The results of the compressive test for each variation resulted in an increase in compressive strength from each variation. The greatest increase in compressive strength is at 6% variation with the resulting compressive strength of 21.94 MPa.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"42 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121526754","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Studi Perbandingan Kadar Ni dan Fe Berdasarkan Sampel Cek Pit dan Sampel Cek Stock Pile Mining Nikel pada PT. Bintangdelapan Mineral Sulawesi Tengah Ni和Fe比较研究是根据PT中苏拉威西矿物第8颗二氧化铁矿的坑样和股票矿样开采样本进行的
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2021-02-05 DOI: 10.25139/JPRS.V4I1.3163
Villa Evadelvia Ginal Sambari
{"title":"Studi Perbandingan Kadar Ni dan Fe Berdasarkan Sampel Cek Pit dan Sampel Cek Stock Pile Mining Nikel pada PT. Bintangdelapan Mineral Sulawesi Tengah","authors":"Villa Evadelvia Ginal Sambari","doi":"10.25139/JPRS.V4I1.3163","DOIUrl":"https://doi.org/10.25139/JPRS.V4I1.3163","url":null,"abstract":"Nickel mining in PT. Bintangdelapan Mineral District located in the village Fatufia Bahodopi Morowali, Central Sulawesi. The purpose of this research study sampling techniques and sample checks pit stock pile, and aimed to compare the levels of Ni, Fe. The authors limit the issues on comparative levels of Ni, Fe, based on sampling and sample checks pit mining production and production sample port stock pile, using the analysis tool Minipal. Field research methods consisting of the preparation stage, the stage of data collection, data processing stage and phase of Thesis. Results in getting the checks on the sampling pit, mining samples, and sample port is an increase in levels, this is because the mining PT. Bintangdelapan Minerals has applied to both selective mining mining methods. In this sample, the researcher applied sampling method and sample check stock pile pit nickel laterite operations in accordance with standard PT. Bintangdelapan Minerals, the data obtained is processed using Microsoft Excel and then presented in the form of reading SPSS (Statistical Product And Service Solution).","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"124 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123199340","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Studi Perancangan Ruang Henti Khusus (RHK) Sepeda Motor Di Simpang Bersinyal (Studi Kasus Simpang Tugu Pecel, Simpang Ruang Terbuka Hijau (RTH) Kartini Dan Simpang Diponegoro Di Kota Madiun) 特殊停机空间设计研究(RHK)信号池的新案例研究(RTH) Kartini的绿色开放空间(RTH)和马迪市的ponegoro挺进)
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1967
Titik Nur Wahana Lestari, Abdiyah Amudi, Ayu Roesdyning Tyas Dyah Anggraeni
{"title":"Studi Perancangan Ruang Henti Khusus (RHK) Sepeda Motor Di Simpang Bersinyal (Studi Kasus Simpang Tugu Pecel, Simpang Ruang Terbuka Hijau (RTH) Kartini Dan Simpang Diponegoro Di Kota Madiun)","authors":"Titik Nur Wahana Lestari, Abdiyah Amudi, Ayu Roesdyning Tyas Dyah Anggraeni","doi":"10.25139/jprs.v2i2.1967","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1967","url":null,"abstract":"The growth of motorcycle in Indonesia increased rapidly and is the most common vehicle on the highway, especially at a crossroads in the city of Madiun. As a result, there is often an accumulation of irregular motorcycle and breaking traffic at the junction in the red phase. This is indicated by motorcycle reaching more than 30 motorcycle at the junction in the red phase. That inflic the a conflicts that affect the movement of other vehicle. Related with this problem, to reduce the occurrence of conflict, needed traffic engineering by providing facility Advance Stop Lines (ASLs) at the Signed Intersection which is intended so that vehicle can exit from Intersection regularly and reduce the accidents at the Signed Intersection. The purpose of this research is knowing the Level Of Service (LOS) and determine the desain of Advance Stop Lines (ASLs) at Signed Intersection with research area is the Tugu Pecel Intersection, Ruang Terbuka Hijau Intersetion and Diponegoro Intersection in Madiun City. The method used in this research is the Indonesian Road Capacity Manual (MKJI,1997). The Level of Service (LOS) in existing condition is at Tugu Pecel Intersection is A (very good), at the RTH Kartini Intersection is E (bad) and Diponegoro Intersection is F (very bad). Design of Advance Stop Lines at the north approaching Tugu Pecel Intersection is 2 lanes with approach lanes (10,00 m × 1,00 m) and with an area of 6,75 m × 4,66 m, at the east approach of RTH Kartini Intersection is 2 lane with approach lanes (7,00 m × 1,00 m) and the area of 5,25 m ×4,66 m and the north Diponegoro Intersection are 2 aprroaching lanes with aprroac lanes (10,00 m ×1,00 m) and area 4,50 m ×4,66 m, south approach 2 lanes with approach lanes (7,00 m ×1,00 m) and area 4,50 m ×4,66 m, east approach is 2 lanes with approach lanes (9,50 m × 1,00m) and an area of 5,50 m ×4,66 m, the western approach is 2 lanes with approach lanes (7,00 m ×1,00 m) and an area 5,50 m ×4,66 m.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"59 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115278025","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Studi Pengaruh Temperature dan Pembuatan Beton Massa dengan Ketebalan 4 Meter (Studi Kasus : Proyek Gunawangsa Tidar Apartement Surabaya) 温度和4米厚度的质量混凝土塑造影响研究(案例研究:
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1867
Fitria Wardhani, K. Koespiadi
{"title":"Studi Pengaruh Temperature dan Pembuatan Beton Massa dengan Ketebalan 4 Meter (Studi Kasus : Proyek Gunawangsa Tidar Apartement Surabaya)","authors":"Fitria Wardhani, K. Koespiadi","doi":"10.25139/jprs.v2i2.1867","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1867","url":null,"abstract":"Building a building with a large and large number of foundations requires a mass casting method. In mass casting work requires observation and analysis of temperature in order to find out the peak temperature and no thermal cracks occur. In this Final Project aims to determine the effect of mass concrete temperature on the raft foundation of the Surabaya Gunawangsa Tidar Aparment Project. The project has 25 types of raft foundations, but the ones with large dimensions and mass casting are pile cap 114 and pile cap 119. Mass casting is carried out in a full day so after casting it is necessary to observe the effect of concrete temperature. The effect of temperature observed was peak temperature, temperature difference, and statistical hypothesis testing. In general, the peak temperature at ijinkam is 78.20˚ C with a difference in temperature of 20˚C. Observations on pile cap 114 and pile cap 119 are safe and have no thermal cracks.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"61 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132660725","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Perencanaan Perkerasan Kaku (Rigid Pavement) Dengan Menggunakan Wiremesh Pada Ruas Jalan HOS. Cokroaminoto Dan Jalan Moch. Yamin (Tuban) Kaku计划在居屋路使用Wiremesh。koroaminoto和Moch街。雅(Tuban)
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1868
Kristedy Permana Sulaiman, Sapto Budy Wasono
{"title":"Perencanaan Perkerasan Kaku (Rigid Pavement) Dengan Menggunakan Wiremesh Pada Ruas Jalan HOS. Cokroaminoto Dan Jalan Moch. Yamin (Tuban)","authors":"Kristedy Permana Sulaiman, Sapto Budy Wasono","doi":"10.25139/jprs.v2i2.1868","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1868","url":null,"abstract":"Highway is one of the land transportation infrastructure which plays an important role in human life in the field of transportation. Jalan Hos. Cokroaminoto and Jalan Moch. Yamin is a national road that fights important to support the economic flow of the surrounding region and also other cities.The author will compare the calculations using two methods, namely the Bina Marga Method 2002 and the AASHTO 1993 method in order to obtain the value of pavement, besides that it also wants to see which method is more efficient and economical in terms of pavement thickness and cost.From the results of the road pavement planning used, the thickness of the pavement is according to the planned 20-year age from 2017 to the end of the year plan for 2037. Economic factors also taken into account in this analysis include the 1993 AASHTO Method.The input parameters of pavement thickness planning for the 1993 AASHTO method are traffic parameters, subgrade reaction modulus, pavement construction material, reliability, and drainage coefficient. For the Jalan Hos section. Cokroaminoto and Jalan Moch. Yamin concrete plate thickness based on the calculation of the 2002 Bina Marga method is 20 cm, while based on the 1993 AASHTO method it is 29 cm. The difference obtained is quite large, namely 9 cm. This is due to differences in the input parameters of each method. Based on the survey that has been done, the thickness of the existing concrete slab is 29 cm, the thickness is the same as the results of calculations using the AASHTO 1993 method.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124268624","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Kajian Desain Struktur Beton Bertulang Dengan Struktur Baja (Studi Kasus Pada Pembangunan Gedung H Unitomo) 钢筋混凝土结构设计研究(H Unitomo建筑案例研究)
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1962
Inggrid Loiza Batak, Safrin Zuraidah, Budi Hastono
{"title":"Kajian Desain Struktur Beton Bertulang Dengan Struktur Baja (Studi Kasus Pada Pembangunan Gedung H Unitomo)","authors":"Inggrid Loiza Batak, Safrin Zuraidah, Budi Hastono","doi":"10.25139/jprs.v2i2.1962","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1962","url":null,"abstract":"Recently, a structure that is generally applied to the construction of multi-storey buildings is reinforced concrete structure. Structural steel is rarely used nowadays, yet in fact, the steel structures are still able to compete with reinforced concrete structures. Therefore, this study aims to determine the exact profile dimensions and the comparison of material prices between steel structures and reinforced concrete structures for columns and beams in redesigning H Building of Dr. Soetomo University, Surabaya. The WF profile steel will be used in this redesigning project. The structure is modeled using AutoCAD, and then imported into SAP2000 software. Modeling structure consists of columns, primary beams and secondary beams. The loads reviewed from the design are dead load, live load, wind load and seismic load. From the results of design review obtained, the overall strength of structure rearrangement is safe and it is obtained the beam profile dimensions of B1 WF 600x200x12x20, B2 WF 400x300x9x14 profile, B3 WF 400x300x9x14 profile, B4 WF 350x200x8x12 profile, and B5 WF 175x125x 5.5x8 profile, K1 WF 400x400x18x28 column profile, and K2 WF 400x400x21x21 column profile. The use of steel structures as a substitute for reinforced concrete structures for columns and beams in the building is a way more expensive with the percentage of steel structure 149.13% more expensive than reinforced concrete structure.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"55 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116271587","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Perencanaan Tebal Perkerasan Jalan Sergang – Jembatan Jengkong (No. 243) KM 8 Batu Putih Kabupaten Sumenep
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1963
Muhammad Baitur Rakhman, Ahmad Suwandi
{"title":"Perencanaan Tebal Perkerasan Jalan Sergang – Jembatan Jengkong (No. 243) KM 8 Batu Putih Kabupaten Sumenep","authors":"Muhammad Baitur Rakhman, Ahmad Suwandi","doi":"10.25139/jprs.v2i2.1963","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1963","url":null,"abstract":"The white stone mine in Batu Putih Village is one of the natural resources located in Sumenep Regency, precisely on Sergang Street - Jengkong Bridge No. 243 Km 8. This road is the only access road to the white stone mining. The current condition of the road is damaged and interferes with the distribution process of white stones, so good thick pavement planning is needed. Planning of flexible pavement thickness and the cost of flexible pavement construction on Sergang - Jengkong Bridge No. 243 Km 8 Batu Putih, Sumenep Regency uses quantitative research. The data collection process uses two types of data, the first is primary data which includes LHR data and the second is secondary data which includes literature and literature studies. In this research the data analysis technique uses Microsoft Office Excel which is to calculate the budget plan and Autocad for drawing. For calculation procedures adjusted to SNI -1732-1989. The results of the Average Daily Traffic Survey (LHR) obtained the total number of vehicles passing through by 21164 smp. The road to be planned is 3 Km long and 4 m wide. Calculation of pavement thickness using the laston AC-WC is 2.50 cm thick and will be planned to be 4 cm thick. The planned budget (RAB) for the road planning is Rp. 2,613,171,000.00 (two billion six hundred thirteen million one hundred seventy-one thousand rupiah).","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129716997","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Kajian Pengetahuan Dan Sikap Pekerja Terhadap Keselamatan Dan Kesehatan Kerja (Studi Kasus Pada Proyek Avian Tower Surabaya) 工人对工作安全和健康的知识和态度研究(Avian Tower泗水项目的案例研究)
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1931
Rezha Mahendra, Kusnul Yakin, Maulidya Octaviani Bustamin
{"title":"Kajian Pengetahuan Dan Sikap Pekerja Terhadap Keselamatan Dan Kesehatan Kerja (Studi Kasus Pada Proyek Avian Tower Surabaya)","authors":"Rezha Mahendra, Kusnul Yakin, Maulidya Octaviani Bustamin","doi":"10.25139/jprs.v2i2.1931","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1931","url":null,"abstract":"Along with the rapid pace of development of multi-storey building construction in indonesia, the role of eork accident risk control is felt to be increasingly important. Instead in reality, the application of the occupational safety and health management system (SMK3)  is still often overlooked. This is indicated by the high number of work accidents. The purpose of this study was to determine the effect of K3 knowledge and worker attitudes on awareness of K3 behavior in the Avian Tower project partially or jointly. This study focuses on the finishing process of the construction of the Avian Tower project. The research method uses qualitative data collection techniques by distributing questionnaires to get responses about potensial hazards or the risk of workplace accidents. Data is processed usng the SPSS 21 computer appication program to obtain validity and reliability. The results of the research obtained from the validity test suggest that all variables are valid because the value of the relationship (r count) is greater tha the significance level (r table). For the reliability test of all variables, the alpha cronbach’s value is > 0.6, then it is declared reliable and based on the F test, the T test and coefficient o determination show if there is a significant influence between knowledge (X1), atttude (X2), K3 (Y). There is a positive effect of K3 knowledge on awareness of K3 behavior with evidence of t count > t table (3,765>2,032). there is positive influence on attitudes toward awareness of K3 behavior with evidence of t count > t table (2,134>2,032). there is a positive influence of knowledge and attitude towards awareness of K3 behavior with evidence of F count > F table (23,093>3,28).","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123957713","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Kajian Pengaruh Percepatan Waktu Pekerjaan Konstruksi Terhadap Biaya Proyek Bess Mansion Apartement Surabaya 研究建筑时间加速对贝丝公寓公寓项目成本的影响
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1930
A. Jaya, Kusnul Yakin, Maulidya Octaviani Bustamin
{"title":"Kajian Pengaruh Percepatan Waktu Pekerjaan Konstruksi Terhadap Biaya Proyek Bess Mansion Apartement Surabaya","authors":"A. Jaya, Kusnul Yakin, Maulidya Octaviani Bustamin","doi":"10.25139/jprs.v2i2.1930","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1930","url":null,"abstract":"In the implementation of construction project activities there are thre things that influence the success and failure of the project: time, cost and quality. The success of a project is usually seen from the timing of completion which is relatively short but without neglecting the quality of the project work. Appropriate and targeted project management and management are required to ensure the time, cost, and quality of the project. This is certainly to avoid a variety of undesirable things such as late settlement, swelling costs, quality failures, and so on that could have an impact on project failure and the emergence of the cost of fines. The purpose of this study is to calculate changes in cost and time of project implementation with alternatives to additional working hours (overtime) comparing the results between normal and cost changes after the addition of working hours (overtime). The data used in this research is secondary data obtained from contractor implementing. Arrow diagram The results program are critical paths and cost increases due to the addition of working hours (overtime) while the result of the time cost trade off method is the acceleration of duration and the increased cost due to the acceleration of duration in any accelerated activity. The results of this study indicate that the total project time and cost under normal conditions is 508 days at a cost of Rp 22.240.655.701  with the addition of 3 hours of overtime work in the duration of crashing 485 days and at a cost of Rp 23.252.220.373,34","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"59 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129266742","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analisis Kinerja Simpang Tak Bersinyal di Simpang Mengkreng Untuk Perencanaan Jalan Tol Kertosono – Kediri 对于Kertosono - Kediri高速公路的规划,你有什么建议
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Pub Date : 2019-09-30 DOI: 10.25139/jprs.v2i2.1866
M. S. D. Cahyono, Adhi Muhtadi, R. Wibisono
{"title":"Analisis Kinerja Simpang Tak Bersinyal di Simpang Mengkreng Untuk Perencanaan Jalan Tol Kertosono – Kediri","authors":"M. S. D. Cahyono, Adhi Muhtadi, R. Wibisono","doi":"10.25139/jprs.v2i2.1866","DOIUrl":"https://doi.org/10.25139/jprs.v2i2.1866","url":null,"abstract":"The mengkreng intersection is a very congested route because its location is near Nganjuk, Kediri and Jombang Regencies for the economic distribution of the West and East Java Provinces. Traffic engineering management is needed so that the intersection is not increasingly saturated. As a benchmark, traffic performance forecasting is carried out for 3 years from 2019 to 2022. Based on forecasting results, the Mengkreng intersection will decrease its DS value by carrying out the Kertosono - Kediri toll road development plan so that the DS value is below 1 (one). In 2019 the lowest DS was 0.79, while the highest DS was 1.61. While in 2022 the lowest DS is 0.45, while the highest DS is 2.72. The solution to deal with traffic congestion in 2045 is through traffic engineering and vehicle restrictions.","PeriodicalId":111362,"journal":{"name":"Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124655281","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信