Engineering and Process Economics最新文献

筛选
英文 中文
EPE Plant cost indices international EPE工厂成本指数国际
Engineering and Process Economics Pub Date : 1978-05-01 DOI: 10.1016/0377-841X(78)90061-X
John Cran
{"title":"EPE Plant cost indices international","authors":"John Cran","doi":"10.1016/0377-841X(78)90061-X","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90061-X","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 163-164"},"PeriodicalIF":0.0,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90061-X","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137229486","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Some uses of S-shaped curves in economic appraisal s形曲线在经济评价中的一些应用
Engineering and Process Economics Pub Date : 1978-05-01 DOI: 10.1016/0377-841X(78)90066-9
F.A. Watson ∗, F.A. Holland
{"title":"Some uses of S-shaped curves in economic appraisal","authors":"F.A. Watson ∗,&nbsp;F.A. Holland","doi":"10.1016/0377-841X(78)90066-9","DOIUrl":"10.1016/0377-841X(78)90066-9","url":null,"abstract":"<div><p>The importance of S-shaped curves in business decision making is discussed and simple methods of fitting equations to such curves are presented. Original adaptations of the well known logistics and Gompertz curves are presented and it is shown by worked examples that the former can be used as an approximation to the cumulative normal distribution curve while the latter is suited to the cumulative probability curve of triangular distributions. The use of such curves in analysing a proposed business strategy and estimating the probability of achieving given values of net present value and discounted cash flow rate of return are illustrated by a major example. This shows that expensive computational equipment is not necessary in order to make numerate assessments of such business factors as profitability, working capital required, project life, risk assessment, etc.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 195-211"},"PeriodicalIF":0.0,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90066-9","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87139305","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Books for engineering economics education 用于工程经济学教育的书籍
Engineering and Process Economics Pub Date : 1978-05-01 DOI: 10.1016/0377-841X(78)90067-0
R.F. de la Mare
{"title":"Books for engineering economics education","authors":"R.F. de la Mare","doi":"10.1016/0377-841X(78)90067-0","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90067-0","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 213-217"},"PeriodicalIF":0.0,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90067-0","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137229485","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Fundamentals of financial management 财务管理基础
Engineering and Process Economics Pub Date : 1978-05-01 DOI: 10.1016/0377-841X(78)90069-4
W.G. Fenner
{"title":"Fundamentals of financial management","authors":"W.G. Fenner","doi":"10.1016/0377-841X(78)90069-4","DOIUrl":"10.1016/0377-841X(78)90069-4","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 221-222"},"PeriodicalIF":0.0,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90069-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"111809177","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Diary of events 事件日记
Engineering and Process Economics Pub Date : 1978-05-01 DOI: 10.1016/0377-841X(78)90070-0
{"title":"Diary of events","authors":"","doi":"10.1016/0377-841X(78)90070-0","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90070-0","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 223-225"},"PeriodicalIF":0.0,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90070-0","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"136696586","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Long term forecasting: A novel time-trend analysis technique 长期预测:一种新的时间趋势分析技术
Engineering and Process Economics Pub Date : 1978-03-01 DOI: 10.1016/0377-841X(78)90038-4
R.F. de la Mare
{"title":"Long term forecasting: A novel time-trend analysis technique","authors":"R.F. de la Mare","doi":"10.1016/0377-841X(78)90038-4","DOIUrl":"10.1016/0377-841X(78)90038-4","url":null,"abstract":"<div><p>Most business decisions of a strategic nature require the forecasting of future events before any concerted plans can be formulated. The likely future levels of product sales, as depicted by the product life cycle, is of special interest in this regard. This paper develops and validates a particular time trend analysis model which the author hopes will be useful and which is believed to be novel. This model is based upon the equation: <span><span><span><math><mtext>S</mtext><msub><mi></mi><mn>t</mn></msub><mtext>= S</mtext><msup><mi></mi><mn>*</mn></msup><mtext>1-exp[-(</mtext><mtext>t</mtext><mtext>A</mtext><msup><mi></mi><mn>B</mn></msup><mtext>]</mtext></math></span></span></span></p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 129-140"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90038-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84094821","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
The economics of modern process technology in low-wage countries 低工资国家现代工艺技术的经济学
Engineering and Process Economics Pub Date : 1978-03-01 DOI: 10.1016/0377-841X(78)90037-2
David J.C. Forsyth
{"title":"The economics of modern process technology in low-wage countries","authors":"David J.C. Forsyth","doi":"10.1016/0377-841X(78)90037-2","DOIUrl":"10.1016/0377-841X(78)90037-2","url":null,"abstract":"<div><p>In recent years the assumption that conventional, capital-intensive process equipment is necessarily the optimal choice in developing countries has been under ever-increasing attack. This paper presents the results of an economic evaluation, carried out at the sub-process level, of a number of alternative technologies for sugar production. The disaggregated analysis suggests that for this industry, and, probably, for cognate industries also, the contention that labour-intensive technologies should be preferred in low-wage countries cannot be sustained.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 123-127"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90037-2","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91512955","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Fluctuating currency rate effects on an international project 汇率波动对国际项目的影响
Engineering and Process Economics Pub Date : 1978-03-01 DOI: 10.1016/0377-841X(78)90036-0
Parmanand Kumar
{"title":"Fluctuating currency rate effects on an international project","authors":"Parmanand Kumar","doi":"10.1016/0377-841X(78)90036-0","DOIUrl":"10.1016/0377-841X(78)90036-0","url":null,"abstract":"<div><p>More or less every international project faces risks and uncertainties due to fluctuations of currencies of different nations involved with the project. This paper analyzes this difficult problem, which many times is very complicated; An example is presented in a simple form to help visualize and evaluate the risks due to the fluctuating of different countries' currencies on a project of international involvement.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 115-121"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90036-0","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75063059","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
The cost of electricity, cheap power versus a clean environment 电力的成本,廉价的电力和清洁的环境
Engineering and Process Economics Pub Date : 1978-03-01 DOI: 10.1016/0377-841X(78)90042-6
L.G. Brookes
{"title":"The cost of electricity, cheap power versus a clean environment","authors":"L.G. Brookes","doi":"10.1016/0377-841X(78)90042-6","DOIUrl":"10.1016/0377-841X(78)90042-6","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 152-153"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90042-6","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"99352050","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Working capital and its estimation for project evaluation 项目评估中的营运资金及其估算
Engineering and Process Economics Pub Date : 1978-03-01 DOI: 10.1016/0377-841X(78)90035-9
R. Scott
{"title":"Working capital and its estimation for project evaluation","authors":"R. Scott","doi":"10.1016/0377-841X(78)90035-9","DOIUrl":"10.1016/0377-841X(78)90035-9","url":null,"abstract":"<div><p>Recent increases in costs and continuing inflation have increased working capital requirements beyond the levels commonly referred to in engineering literature. Estimating working capital by reference to fixed capital is no longer tenable. This paper describes an improved estimating method based on categorising the hold-up at six stages during manufacture, distribution and sale using approximate costs. The result is expressed in terms of annual sales value.</p><p>For products made and sold in U.K., minimum working capital requirements vary between £ 12 and £ 35 for £ 100 of annual sales according to the nature of the product and process. Values may exceed £ 60 for other markets. Results agree well with company published balance sheets.</p><p>The method improves the accuracy of project evaluation where errors in estimating working capital can be as significant as those in fixed capital costs. Some design aspects are listed where engineers may be able to reduce working capital or to optimise it against overall cost.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 105-114"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90035-9","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81824280","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信