{"title":"长输油气管道山区自动焊陡坡施工技术探讨","authors":"郝 振乾, 赵 章勇, 郝 琦, 杜 冲","doi":"10.26789/szgc.v7i4.929","DOIUrl":"https://doi.org/10.26789/szgc.v7i4.929","url":null,"abstract":"广西LNG配套外输管道桂林支线工程(三标段)项目,主要工作量有55.44km长的管线,管径DN800,焊接工艺为组合自动焊,其中标段内有8km的山地施工,其中有三处爬坡角度均大于30°,垂直高差100m左右,属于山地陡坡的特殊施工。陡坡施工中管沟开挖、运布管、焊接、防塌棚的架设等施工工序难度较大,安全风险高,陡坡施工也受到阴雨天气等因素的制约。","PeriodicalId":58331,"journal":{"name":"城乡建设","volume":"25 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81729742","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}