{"title":"An Innovative Solution to Counteract Convergence of Shaft Lining in Rock Salt Strata","authors":"P. Kamiński, P. Czaja, Metoda Przeciwdziałania","doi":"10.24425/AMS.2019.128693","DOIUrl":"https://doi.org/10.24425/AMS.2019.128693","url":null,"abstract":"This work presents an innovative shaft-lining solution which, in accordance with a patent of the Republic of Poland, allows successive, periodic leaching of excess rock salt migrating to the shaft opening. As is commonly known, all workings in rock salt strata are exposed to an increased convergence of sidewalls, making it very difficult to use shafts properly. Rocks migrating towards the shaft opening cause very high stress on the shaft liner. As a result, if the lining does not show substantial deformability, it fails. Lining failure due to insufficient deformability has been extensively described in the literature. Also, throughout the history of mining construction, a number of solutions have been proposed for different types of lining-deformability enhancement. For instance, the KGHM mining corporation applied a deformable steel lining – a solution used in the mining construction of galleries – along a 155-m-long section of the SW-4 shaft with diameters of 7,5 m that passes through a rock salt strata. At KGHM, the SW-4 shaft passes through a rock salt strata along a section of 155 m, in which a deformable enclosed steel lining was made. After several years, the convergence of shaft sidewalls stabilised at a rate of 0.5 mm/day. This enormous activity of the rock mass made it necessary to reconstruct the entire shaft section after only four years. According to further predictions, it will be necessary to reconstruct this section at least four times by 2045. This paper discusses in short form the underlying weaknesses of the technology in question. As a solution to the problems mentioned above, the authors of this work present a very simple design of a shaft lining, called the tubing-aggregate lining, which utilises the leachability of salt rock massifs. The essential part of the lining is a layer of coarse aggregate set between the salt rock sidewall and the inner column of the tubing lining. One the one hand, coarse aggregate supports the salt rock sidewall and is highly deformable due to its compressibility, but on the other hand it allows water or low saturated brine to migrate and dissolve salt rock sidewalls. This paper presents the first stage of works on this subject. Patent No. PL 223831 B had been granted before these works commenced.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43489855","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
D. Saramak, T. Gawenda, A. Saramak, D. Foszcz, Z. Naziemiec
{"title":"Effectiveness of Copper Minerals Liberation from the Gangue through Application of HRC Press in Copper Ore Processing Circuits","authors":"D. Saramak, T. Gawenda, A. Saramak, D. Foszcz, Z. Naziemiec","doi":"10.24425/122459","DOIUrl":"https://doi.org/10.24425/122459","url":null,"abstract":"The article concerns investigations over benefits of application of HRC devices into sulphide copper ore processing plant. High pressure comminution appears to be very effective technology in hard ore processing circuits, especially in terms of energy consumption. This can be particularly observed in downstream grinding and beneficiation operations. A series of pilot-scale crushing tests in HRC roller press for various levels of operating pressure, were performed. HRC crushing effectiveness along with downstream grinding process course for each crushing product were also under analysis. The investigations were supplemented by analysis of flotation process effectiveness and impact of the process of high-pressure comminution on environment (dust emission). The results of investigation show that operating pressure level influences the obtained comminution results (comminution degree, yield of finest particle size fractions). The grinding effectiveness, measured through production of the finest particle size fractions was significantly influenced by the operating pressure. The results show that higher values of operating pressure (4.0 and 4.5 N/mm 2 ) are not as efficient within this scope as the pressure 3.5 N/mm2. Dust emission is also correlated with the operating pressure value.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41613975","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
H. M. Rashid, MuHAMMAd GHAzzAli, U. Waqas, A. A. Malik, M. Abubakar
{"title":"Artificial Intelligence-Based Modeling for the Estimation of Q-Factor and Elastic Young’s Modulus of Sandstones Deteriorated by a Wetting-Drying Cyclic Process","authors":"H. M. Rashid, MuHAMMAd GHAzzAli, U. Waqas, A. A. Malik, M. Abubakar","doi":"10.24425/ams.2021.138944","DOIUrl":"https://doi.org/10.24425/ams.2021.138944","url":null,"abstract":"the","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41637190","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"The Technology of Drilling Wells for Capturing Methane from Abandoned Coal Mines","authors":"J. Siemek, J. Macuda, Łukasz Łukańko, J. Hendel","doi":"10.24425/ams.2020.132708","DOIUrl":"https://doi.org/10.24425/ams.2020.132708","url":null,"abstract":"The longwall mining system with fall of the roof is still the most common hard coal extraction system in Polish mining. Its utilization for selective coal seams’ mining results in the development of post-extraction gobs at different depths. Methane desorption phenomena from the coal seams in the stress release zones and migration of gas towards the area of operations, result in methane accumulating also after completion of coal exploitation. Methane which is not exploited from the gobs can migrate directly to the atmosphere e.g. through overlying layers, faults, workings or directly via an operated ventilation grid of an adjacent coal mine – contributing to the Greenhouse Gas effect. One of the methods to capture methane (Abandoned Maine Methane) from abandoned coal mines is to drill vertical wells through several post-extraction gobs from the surface. This paper presents the results of drilling operations at the AGH-Wieczorek-1 well, where first time in Poland, down-the-hole-hammer (DTH) with casing-while-drilling (CwD) technology were used to drill through several post-extraction gobs. The AGH-Wieczorek-1 well with 440.0 m MD was successfully drilled without any complications. Finally, three post-extraction gobs and two coal seams were drilled. Additionally, results from drillability tests, which were performed during drilling operations, are presented.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41662132","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"An Approach to Detect Local Tectonic Dislocations in Coal Seams Based on Roughness Analysis","authors":"M. Młynarczuk, M. Skiba","doi":"10.24425/ams.2022.143685","DOIUrl":"https://doi.org/10.24425/ams.2022.143685","url":null,"abstract":"The occurrence of faults in coal seams has an impact on the possibility of methane hazard. There are several methods for identifying tectonic faults, but they cannot be applied directly to solve dynamic hazard problems in coal mine. Thus, searching for appropriate methods, that can detect faults in regional and local scales is needed. In order to meet this need, the paper proposes a new measurement method of estimating changes to the coal structure, based on profilometry measurements (roughness analysis) and application of madogram functions. based on examining coal samples from near fault zones it was shown that the proposed approach allows us to detect changes of the coal surface that appear as the distance to a tectonic fault gets shorter. The proposed method, due to its simplicity and speed of measurement, implies a potential for practical application in the process of detecting local tectonic dislocations in coal mines.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41894750","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Ewa Janson, M. Markowska, Paweł P. Łabaj, Aleksander Wrana, Paweł Zawartka
{"title":"A Preliminary Assessment of Climate Change Impacts – Implications for Mining Activity in Polish Coal Regions","authors":"Ewa Janson, M. Markowska, Paweł P. Łabaj, Aleksander Wrana, Paweł Zawartka","doi":"10.24425/ams.2020.134142","DOIUrl":"https://doi.org/10.24425/ams.2020.134142","url":null,"abstract":"It is widely known and accepted that the global climate is changing with unprecedented speed. Climate models project increasing temperatures and changes in precipitation regimes which will alter the frequency, magnitude, and geographic distribution of climate-related hazards including flood, drought and heat waves. In the mining industry, climate change impacts are an area of research around the world, mostly in relation to the mining industry in Australia and Canada, where mining policies and mitigation actions based on the results of this research were adopted and applied. In Poland, there is still a lack of research on how climate change, and especially extreme weather events, impacts mining activity. This impact may be of particular importance in Poland, where the mining industry is in the process of intensive transition. The paper presents an overview of hazardous events in mining in Poland that were related to extreme weather phenomena. The needs and recommended actions in the scope of mitigating the impact of future climate change on mining in all stages of its functioning were also indicated. The presented analyses and conclusions are the results of the first activities in the TEXMIN project: The impact of extreme weather events on mining activities, identifying the most important factors resulting from climate change impact on mining.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41956481","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Jianwei Cheng, W. Song, Yi Jing, Xixi Zhang, M. Korzec, M. Borowski, Yue Wang
{"title":"Research on Mine Seal Stability Under Explosion Load and Ground Pressure In Underground Coal Mines","authors":"Jianwei Cheng, W. Song, Yi Jing, Xixi Zhang, M. Korzec, M. Borowski, Yue Wang","doi":"10.24425/ams.2020.132707","DOIUrl":"https://doi.org/10.24425/ams.2020.132707","url":null,"abstract":"The mine seals in coal mines with a good impact resistance and air tightness are mainly used to isolate abandoned mining areas from active workings. For one thing, it can prevent the leakage of harmful gases, such as toxic gas from abandoned areas. For another, once an underground mine explosion happens, it can effectively block the spread of the explosion between the abandoned mining areas and the active workings. Hence, it is of great significance to study the explosion-proof performance and mechanical properties of the mine seals. First of all, the effect of slotting on the stability of the seals in coal mines under explosion load was explored in this study. By numerical simulations, the mechanical response characteristics of the seals with or without cutting a slot under the explosion load were compared in detail. The results show that slotting improved the stress concentration at the contact surface of surrounding rock by transferring partial impact received by mine seals to the surrounding rocks, thus, to achieve the effect of buffering explosion impact. Besides, such effect will be enhanced with increasing cutting depth into rock, and will stabilize when the depth is 20 cm. On this basis, the mechanical properties and damage of the seals constructed by different materials (standard brick and #C40 concrete) under the explosion load were compared. It was found that once a slot was set, the maximum deformation of the concrete seal was reduced, while the maximum deformation of the brick seal increased. Since the non-deformability of the concrete seal is obviously stronger than that of the brick seal, with the impact resistance stronger than that of the brick seal, the concrete seal is more suitable for slotting. Moreover, the damage of the seals in underground coal mines under the strata ground pressure was studied; the results of which show that the damage state under the ground pressure can be divided into 3 levels, i.e. no damage, minor damage and rapid development of damage. Meanwhile, it was found that the prestressed structure formed by the ground pressure at the level of no damage can enhance the protective effect of the seals in coal mines. However, when the ground pressure was further developed, the seal itself was destroyed and the","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41460709","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Jarosław Tokarczyk, M. Rotkegel, A. Pytlik, A. Niedworok
{"title":"Research on the Impact of Forces and Acceleration During the Riding and Braking of a Suspended Monorail","authors":"Jarosław Tokarczyk, M. Rotkegel, A. Pytlik, A. Niedworok","doi":"10.24425/ams.2020.133199","DOIUrl":"https://doi.org/10.24425/ams.2020.133199","url":null,"abstract":"This article presents the results of experimental studies aimed at identifying the forces and acceleration during the riding and braking action of a suspended monorail. The tests were conducted under in situ conditions, in a dip-heading “B” ZG SILTECH in Zabrze. The paper also discusses a test stand, a mete- ring system, and presents the impact of changes in speed on forces in slings of the suspended route. The measurements of selected parameters were performed for three variants: the route, the emergency haulage braking and the braking trolley set braking. The results include waveforms of forces in route slings, and acceleration values acting on the operator and transported load.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46284633","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
T. Bhatkar, A. Usmani, A. Mandal, A. Nanda, Analiza Pęknięcia, Klina W Dużej, Nieobudowanej Komorze Skalnej, Oraz Podjęte, Kroki Naprawcze, Studium Przypadku
{"title":"Wedge Failure Analysis and Remedial Measures in Large Unlined Rock Cavern: a Case Study","authors":"T. Bhatkar, A. Usmani, A. Mandal, A. Nanda, Analiza Pęknięcia, Klina W Dużej, Nieobudowanej Komorze Skalnej, Oraz Podjęte, Kroki Naprawcze, Studium Przypadku","doi":"10.24425/AMS.2018.124987","DOIUrl":"https://doi.org/10.24425/AMS.2018.124987","url":null,"abstract":"This article presents a case study of a large wedge failure. It took place during excavation of the last bench of storage cavern with an approximate dimension of 80 m long having a depth of 8 m. The adopted intervention followed a structured approach, which included immediate rock support, geotechnical and geological investigations in the failure zone and design modifications. Back analyses of the failure zone were also carried out to assess design parameters with observed geological conditions. Re assessment in the failure zone was carried out using modified design parameters, which included shorter benches, rock support installation schemes such as longer rock bolts, reinforced ribs of shotcrete and reduced construction advances. Geotechnical monitoring in and around failure zone were carried out for recording any alarming movements in the rock mass. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least one week, the frequency of subsequent monitoring can be decided. In most cases the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes. The paper discusses the failure, investigation, cause, assessment and remedial measures to complete the construction of cavern.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47854699","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Analysis of the Applicability of the Convergence Control Method for Gateroad Design Based on Conducted Underground Investigations","authors":"A. Walentek, Badania Dołowe","doi":"10.24425/ams.2019.131065","DOIUrl":"https://doi.org/10.24425/ams.2019.131065","url":null,"abstract":"The stability of gateroads is one of the key factors for the mining process of hard coal by a longwall system. Wrong designed and applied the gateroad support at the stage of drilling, may adversely affect the functionality of the gateroad and the safety of the crew throughout its existence. The article presents the results of the underground tests and observations such as: convergence of the gateroad, stratification and the fractured zone range in the roof rocks, carried out in four longwall gateroads at the stage of their drilling. The obtained test results were the basis for the assessment of the possibility of using a convergence control method in the design of the gateroad support. The method is based on three interdependent relation-ships, such as: Ground Reaction Curve (GRC), Longitudinal Displacement Profile (LDP), and a Support Characteristic Curve (SCC). All calculations were performed using numerical modeling in the Phase2 program, based on the finite element method (FEM).","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49545275","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}