Engineering Management Journal最新文献

筛选
英文 中文
Multi-Criteria Decision Making for Medical Device Development 医疗器械开发的多准则决策
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-04-03 DOI: 10.1080/10429247.2022.2040267
H. Barkaoui, Helmi Ben Rejeb, A. Barkaoui, J. Tavares
{"title":"Multi-Criteria Decision Making for Medical Device Development","authors":"H. Barkaoui, Helmi Ben Rejeb, A. Barkaoui, J. Tavares","doi":"10.1080/10429247.2022.2040267","DOIUrl":"https://doi.org/10.1080/10429247.2022.2040267","url":null,"abstract":"Abstract The development of a new product is a complicated multi-stakeholder process with a significant risk of failure. This is particularly true in the medical device sector, where there are strict therapeutic, psychological, and normative constraints. This article presents a multi-criteria decision making process called “Define, Prioritize, Measure, and Aggregate” (DPMA). DPMA is designed to help engineering managers in decision making during the development process of new medical devices. The model is based on two sets of criteria linked to business and customer satisfaction. These criteria are weighted using the analytic hierarchy process (AHP) and group decision making (GDM) process. The performance of a medical device is measured according to each criterion. Furthermore, the final score of GO/NO GO alternatives are calculated with the simple additive weighting (SAW) method. A case study for the development of a new kind of femoral implant is presented to demonstrate the implementation of the DPMA process. This study shows that the application of the DPMA process during the design of a 3D printed femoral prosthesis provided engineering managers the key elements and green light to go ahead with the development of this medical device.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"35 1","pages":"102 - 119"},"PeriodicalIF":2.5,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47327356","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Critical Risk Factors that Influence Production-oriented Projects in the United Arab Emirates: A ‘Best-worst Method’ (BWM) Analysis 影响阿联酋以生产为导向项目的关键风险因素:“最佳-最差方法”(BWM)分析
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-04-03 DOI: 10.1080/10429247.2022.2041963
S. Khan, U. Ojiako, Alasdair Marshall, D. Dalalah, Serkan Ceylan, Naser Nader Ali Shabani, Salama Imad Al Sharqawi
{"title":"The Critical Risk Factors that Influence Production-oriented Projects in the United Arab Emirates: A ‘Best-worst Method’ (BWM) Analysis","authors":"S. Khan, U. Ojiako, Alasdair Marshall, D. Dalalah, Serkan Ceylan, Naser Nader Ali Shabani, Salama Imad Al Sharqawi","doi":"10.1080/10429247.2022.2041963","DOIUrl":"https://doi.org/10.1080/10429247.2022.2041963","url":null,"abstract":"Abstract The aim of this paper is to categorize and prioritize the critical risk factors that influence production-oriented projects. Utilizing data obtained from the metal production (manufacturing) and fabrication industry in United Arab Emirates, we employ multicriteria decision analysis encompassing the ‘Best-Worst Method’ (BWM) for factor ranking and categorization. The outcome of this exercise being the development of substantial proficiency in risk management that will have a significant impact on the overall success of projects commissioned within the production space. Findings drawn against an integrated ‘Technology–Organization–Environment’ and ‘Four levels of uncertainty’ framework suggests that ‘Automation,’ ‘Cycle time,’ and ‘Feed rate’ (technological factors), ‘Manpower utilization’ and ‘Agility’ (organizational factors), and ‘Occupational health and safety’ (environmental factors), ranked highest in terms of critical risk factors likely to impact upon the outcome of projects. This paper makes a specific contribution to the literature in that our use of an integrated ‘Technology–Organization–Environment’ – ‘Four levels of uncertainty’ framework as a risk intelligence focused typology allows us to focus on proactive as against reactive management of risk. This forms the core element of our theorization of risk knowledge as risk intelligence.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"35 1","pages":"144 - 160"},"PeriodicalIF":2.5,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43183099","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Exploring Lean Practices’ Importance in Sustainable Supply Chain Management Trends: An Empirical Study in Canadian Construction Industry 精益实践在可持续供应链管理趋势中的重要性探讨——基于加拿大建筑业的实证研究
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-03-29 DOI: 10.1080/10429247.2023.2187608
P. Le, D. Nguyen
{"title":"Exploring Lean Practices’ Importance in Sustainable Supply Chain Management Trends: An Empirical Study in Canadian Construction Industry","authors":"P. Le, D. Nguyen","doi":"10.1080/10429247.2023.2187608","DOIUrl":"https://doi.org/10.1080/10429247.2023.2187608","url":null,"abstract":"","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2023-03-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46381456","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Investigating the Impact of Task-Oriented, Relationship-Oriented, and Innovation-Oriented Leadership Competencies on Project Success in Pakistan: A Moderated Model of Multi-Dimensional Senior Management Support 调查任务导向、关系导向和创新导向的领导能力对巴基斯坦项目成功的影响:多维高级管理支持的适度模型
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-03-28 DOI: 10.1080/10429247.2023.2186681
Riaz Ahmed, Simon P. Philbin, O. S. Paracha
{"title":"Investigating the Impact of Task-Oriented, Relationship-Oriented, and Innovation-Oriented Leadership Competencies on Project Success in Pakistan: A Moderated Model of Multi-Dimensional Senior Management Support","authors":"Riaz Ahmed, Simon P. Philbin, O. S. Paracha","doi":"10.1080/10429247.2023.2186681","DOIUrl":"https://doi.org/10.1080/10429247.2023.2186681","url":null,"abstract":"","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2023-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43987965","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Forecasting the Investors’ Escalation of Commitment in PPP Project at Different Project Stages: A Regression Model Based on the Influence of Social Factors PPP项目不同阶段投资者承诺升级预测——基于社会因素影响的回归模型
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-03-13 DOI: 10.1080/10429247.2023.2185053
Jiaqi Liu, Jicai Liu, Jun Hu
{"title":"Forecasting the Investors’ Escalation of Commitment in PPP Project at Different Project Stages: A Regression Model Based on the Influence of Social Factors","authors":"Jiaqi Liu, Jicai Liu, Jun Hu","doi":"10.1080/10429247.2023.2185053","DOIUrl":"https://doi.org/10.1080/10429247.2023.2185053","url":null,"abstract":"","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2023-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42155919","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Examining the Relationship Between Supply Chain Integration, Innovation Speed and Supply Chain Performance Under Demand Uncertainty 需求不确定性下供应链整合、创新速度与供应链绩效关系研究
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-02-21 DOI: 10.1080/10429247.2023.2174766
Vu Dinh Khoa, Nguyen Thi Mai Anh
{"title":"Examining the Relationship Between Supply Chain Integration, Innovation Speed and Supply Chain Performance Under Demand Uncertainty","authors":"Vu Dinh Khoa, Nguyen Thi Mai Anh","doi":"10.1080/10429247.2023.2174766","DOIUrl":"https://doi.org/10.1080/10429247.2023.2174766","url":null,"abstract":"","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2023-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45706291","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A Weighted Fuzzy Social Network Analysis-Based Approach for Modeling and Analyzing Relationships Among Risk Factors Affecting Project Delays 基于加权模糊社会网络分析的项目延误风险因素关系建模与分析方法
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-01-26 DOI: 10.1080/10429247.2022.2162305
Hamdi A. Bashir, Sadeque Hamdan, U. Ojiako, S. Haridy, M. Shamsuzzaman, Hassan Ahmed Al Zarooni
{"title":"A Weighted Fuzzy Social Network Analysis-Based Approach for Modeling and Analyzing Relationships Among Risk Factors Affecting Project Delays","authors":"Hamdi A. Bashir, Sadeque Hamdan, U. Ojiako, S. Haridy, M. Shamsuzzaman, Hassan Ahmed Al Zarooni","doi":"10.1080/10429247.2022.2162305","DOIUrl":"https://doi.org/10.1080/10429247.2022.2162305","url":null,"abstract":"","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2023-01-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45328067","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Using the Six Sigma DMAIC Method to Improve Procurement: A Case Study 运用六西格玛DMAIC方法改进采购:一个案例研究
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2023-01-02 DOI: 10.1080/10429247.2022.2036067
Ping-Shun Chen, J. Chen, Wen-Tso Huang, Huanxi Chen
{"title":"Using the Six Sigma DMAIC Method to Improve Procurement: A Case Study","authors":"Ping-Shun Chen, J. Chen, Wen-Tso Huang, Huanxi Chen","doi":"10.1080/10429247.2022.2036067","DOIUrl":"https://doi.org/10.1080/10429247.2022.2036067","url":null,"abstract":"Abstract When a management reserve occurs due to a design change in a company’s outsourcing project, the additional cost is customarily only 2% to 10% of the original contract amount. If the management reserve exceeds the original contract amount by 20% to 50%, it reveals the imprudence of running the outsourcing project. Based on the company’s policy requirements, an outsourcing project must finish the tender process by following the timeline of every work stage determined by the characteristics and environment of the project. This research studied the factors causing management reserve in an outsourcing project of the case company using the Six Sigma define, measure, analyze, improve, and control (DMAIC) method. The root cause was the lack of defining the specific responsibility in charge of unit, leading to insufficient communication between demand and executive departments as well as between project engineering and procurement departments in the preceding process. The preceding process must have a specific management procedure by redefining each unit’s responsibility to avoid frequent design changes later. In addition, the procurement department estimated the reserve prices by analyzing the supplier’s quotes using quantitative cost analysis. In the ultimate efficiency evaluation, this study verified that the improved procurement cases dramatically reduced circumstances of design change and management reserve and met the case company’s due date.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"35 1","pages":"70 - 83"},"PeriodicalIF":2.5,"publicationDate":"2023-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47710865","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Editor’s Introduction 编辑器的介绍
4区 管理学
Engineering Management Journal Pub Date : 2023-01-02 DOI: 10.1080/10429247.2023.2167775
Brian Smith, Jennifer Cross, Simon Philbin
{"title":"Editor’s Introduction","authors":"Brian Smith, Jennifer Cross, Simon Philbin","doi":"10.1080/10429247.2023.2167775","DOIUrl":"https://doi.org/10.1080/10429247.2023.2167775","url":null,"abstract":"","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"135755222","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An Exploratory Study on Two-Dimensional Project Management Maturity Model 二维项目管理成熟度模型的探索性研究
IF 2.5 4区 管理学
Engineering Management Journal Pub Date : 2022-12-20 DOI: 10.1080/10429247.2022.2154093
Ruihua Liao, Hong Chen, Changqing Sun, Yiming Sun
{"title":"An Exploratory Study on Two-Dimensional Project Management Maturity Model","authors":"Ruihua Liao, Hong Chen, Changqing Sun, Yiming Sun","doi":"10.1080/10429247.2022.2154093","DOIUrl":"https://doi.org/10.1080/10429247.2022.2154093","url":null,"abstract":"Abstract Based on the analysis of the existing project management maturity models and software capability maturity models, this study proposes a novel two-dimensional project management maturity (TPMM) model, which emphasizes the project business management (PBM) and information technology application (ITA) simultaneously. It is the first to present the TPMM concept with PBM maturity and ITA maturity, and the first to evaluate ITA maturity based on the 49 processes of PMBOK. After the PBM and ITA maturities of 49 management processes are obtained using an expert evaluation method, the two-dimensional maturity of the knowledge area and enterprise layers can be calculated by statistical method. The comparison of maturities at three layers and two dimensions is helpful for enterprises to find problems in PBM and ITA, and to find the right direction for advancement. It is also helpful for enterprises to take corresponding improvement measures. The integrated framework provides a new perspective on improving the efficiency and capability of project management through positive cycle development between PBM and ITA. The application case sets an example for other enterprises to improve their project management capability and efficiency along a maturity ladder.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2022-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49353493","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书