{"title":"Unlocking the full potential of reality capture for construction project cost monitoring: a mixed review","authors":"Godfred Fobiri, I. Musonda, Franco Muleya","doi":"10.1108/jedt-05-2022-0231","DOIUrl":"https://doi.org/10.1108/jedt-05-2022-0231","url":null,"abstract":"\u0000Purpose\u0000Digital data acquisition is crucial for operations in the digital transformation era. Reality capture (RC) has made an immeasurable contribution to various fields, especially in the built environment. This paper aims to review RC applications, potentials, limitations and the extent to which RC can be adopted for cost monitoring of construction projects.\u0000\u0000\u0000Design/methodology/approach\u0000A mixed-method approach, using Bibliometric analysis and the PRISMA framework, was used to review and analyse 112 peer-reviewed journal articles from the Scopus and Web of Science databases.\u0000\u0000\u0000Findings\u0000The study reveals RC has been applied in various areas in the built environment, but health and safety, cost and labour productivity monitoring have received little or no attention. It is proposed that RC can significantly support cost monitoring owing to its ability to acquire accurate and quick digital as-built 3D point cloud data, which contains rich measurement points for the valuation of work done.\u0000\u0000\u0000Research limitations/implications\u0000The study’s conclusions are based only on the Scopus and Web of Science data sets. Only English language documents were approved, whereas others may be in other languages. The research is a non-validation of findings using empirical data to confirm the data obtained from RC literature.\u0000\u0000\u0000Practical implications\u0000This paper highlights the importance of RC for cost monitoring in construction projects, filling knowledge gaps and enhancing project outcomes.\u0000\u0000\u0000Social implications\u0000The implementation of RC in the era of the digital revolution has the potential to improve project delivery around the world today. Every project’s success is largely determined by the availability of precise and detailed digital data. RC applications have pushed for more sustainable design, construction and operations in the built environment.\u0000\u0000\u0000Originality/value\u0000The study has given research trends on the extent of RC applications, potentials, limitations and future directions.\u0000","PeriodicalId":514531,"journal":{"name":"Journal of Engineering, Design and Technology","volume":"32 2","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139529725","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Overlapping sustainable construction indicators for construction organisations in Zimbabwe","authors":"Tirivavi Moyo, Mazen Omer, Benviolent Chigara","doi":"10.1108/jedt-04-2023-0168","DOIUrl":"https://doi.org/10.1108/jedt-04-2023-0168","url":null,"abstract":"\u0000Purpose\u0000Sustainable construction deficits are common in developing economies, and resolutions are constrained by the failure to prioritise the plethora of available indicators. This study aims to report on overlapping indicators for benchmarking sustainable construction for construction organisations.\u0000\u0000\u0000Design/methodology/approach\u0000Online survey data were collected from construction professionals, academics and senior managers in government bodies. Pearson chi-squared tests and overlapping analysis were used to determine significant indicators. Kruskal–Wallis tests were used to determine statistically significant differences among the dimensions.\u0000\u0000\u0000Findings\u0000Overlapping analysis determined indicators significant for economic, environmental and social performance. Environmental protection and reporting (pollution and emissions) were significant for all three performance dimensions. The most significant indicators are economic performance (adequate competence of key project staff), environmental performance (environmental protection and reporting – pollution and emissions) and social performance (adequate sustainability expenditure by construction organisations). Significant differences due to dimensions existed for adequate competence of key project staff, sustainable construction and eco-design, adequate governance and organisational excellence of construction projects and satisfactory workers’ morale.\u0000\u0000\u0000Research limitations/implications\u0000Determining overlapping indicators enables prioritised implementation that ensures sustainable construction. Excluding construction workers was a significant limitation for a holistic interrogation.\u0000\u0000\u0000Originality/value\u0000To the best of the authors’ knowledge, this is the first study to determine overlapping indicators for sustainable construction performance in Zimbabwe.\u0000","PeriodicalId":514531,"journal":{"name":"Journal of Engineering, Design and Technology","volume":"39 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139379996","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Assessing project complexity factors for railway megaprojects: a Delphi-BWM approach","authors":"Kavita Bhangale, Kanchan Joshi, Ruchita Gupta, Bhaskar Gardas","doi":"10.1108/jedt-07-2022-0398","DOIUrl":"https://doi.org/10.1108/jedt-07-2022-0398","url":null,"abstract":"\u0000Purpose\u0000Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors, especially for megaprojects. This paper aims to determine the most significant complexity factors for the railway megaprojects in India.\u0000\u0000\u0000Design/methodology/approach\u0000A mixed approach using the Delphi and best–worst method (BWM) helped to identify, validate and determine the most critical factors that require intervention to diminish variance from project performance.\u0000\u0000\u0000Findings\u0000The BWM resulted in stakeholder management, followed by organizational and technological complexity as significant complexity factors, and the varied interests of the stakeholder as the most important among the 40 subfactors.\u0000\u0000\u0000Practical implications\u0000The finding indicates the necessity for strategic, tactical and operational-level interventions to effectively manage the complexity affecting project efficiency because of the varied stakeholders. This paper will guide the project and general managers to prioritize their resources to handle complexity for effective project performance measured in terms of time, cost and quality and help them make strategic decisions. The research findings of this study are expected to help researchers and practitioners in better planning and smoother execution of projects. In addition, this study would help the researchers formulate policies and strategies for better handling of the projects.\u0000\u0000\u0000Originality/value\u0000This study adds significant value to the body of knowledge related to PC in megaprojects in developing countries. The result of the investigation underlined that nine complexity factors and seven unique subfactors, namely, the sustainable environment, timely availability of information, communication in both directions, interdepartmental dependency and coordination, design, statutory norms, site challenges, socioeconomic conditions, the tendency of staff to accept new technology and the frequent changes in the requirements of stakeholders are significant in railway megaprojects. The BWM is applied to rank the complexity factors and subfactors in the case area.\u0000","PeriodicalId":514531,"journal":{"name":"Journal of Engineering, Design and Technology","volume":"21 12","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139380114","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
C. Tantasavasdi, Senatanit Arttamart, Natthaumporn Inprom
{"title":"Combined wind catchers and side windows for cross ventilation in row houses","authors":"C. Tantasavasdi, Senatanit Arttamart, Natthaumporn Inprom","doi":"10.1108/jedt-02-2023-0079","DOIUrl":"https://doi.org/10.1108/jedt-02-2023-0079","url":null,"abstract":"\u0000Purpose\u0000This paper aims to explore the efficiency of natural ventilation in the bedrooms of typical two-storeyed row houses with newly reconfigured design that incorporate rooftop wind catchers and side windows to create cross ventilation.\u0000\u0000\u0000Design/methodology/approach\u0000A CFD program was used to assess average air velocity coefficient (Cv) in 32 airflow cases. Parameters include location of openings with respect to wind direction, inlet-to-outlet area ratio (IOR) and opening-to-floor area ratio (OFR).\u0000\u0000\u0000Findings\u0000The results reveal that indoor air velocities in the cases of air entering wind catchers are generally higher than those in the cases of air entering side windows while air velocities at the openings are the opposite. The IOR of 1:2 provides best results in terms of both velocities of the indoor air and velocities at the openings. Increasing the OFR from 20% to 50% generally improves indoor air velocities and airflow rates.\u0000\u0000\u0000Originality/value\u0000This study proved that the new solution of combining one-sided wind catchers and side windows can effectively solve the problem of ventilation uniquely existing in the conditions of typical row houses by catching prevailing wind from two opposite directions into multiple rooms. The results are given as non-dimensional air velocities, which can be interpreted with any climatic data, and therefore can be applied to row houses in any locations and climatic conditions. The findings can create a new and efficient design of row houses that benefits building industry.\u0000","PeriodicalId":514531,"journal":{"name":"Journal of Engineering, Design and Technology","volume":"129 16","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139453330","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}