Construction Management and Economics最新文献

筛选
英文 中文
Incentive-based coordination for scheduled delivery in prefab construction 以激励为基础,协调预制装配式建筑的按期交付
IF 3.4
Construction Management and Economics Pub Date : 2024-01-24 DOI: 10.1080/01446193.2024.2305763
Yong-Woo Kim, Byong-Duk Rhee
{"title":"Incentive-based coordination for scheduled delivery in prefab construction","authors":"Yong-Woo Kim, Byong-Duk Rhee","doi":"10.1080/01446193.2024.2305763","DOIUrl":"https://doi.org/10.1080/01446193.2024.2305763","url":null,"abstract":"An increasing number of projects are adopting prefabrication to economize on time, labor, and materials in fixed-position layout operations, such as construction, ship building, and aircraft manufa...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"36 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2024-01-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139584494","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An advanced decision-support system for ranking unbalanced bids 对不平衡投标进行排序的高级决策支持系统
IF 3.4
Construction Management and Economics Pub Date : 2024-01-18 DOI: 10.1080/01446193.2024.2303158
Firat Dogu Akin, Atilla Damci, David Arditi, Sevilay Demirkesen Cakir
{"title":"An advanced decision-support system for ranking unbalanced bids","authors":"Firat Dogu Akin, Atilla Damci, David Arditi, Sevilay Demirkesen Cakir","doi":"10.1080/01446193.2024.2303158","DOIUrl":"https://doi.org/10.1080/01446193.2024.2303158","url":null,"abstract":"Awarding a contract to a bidder who has unbalanced the bid may cost more money to the owner. An owner who determines that a bid has been unbalanced has the legal right to reject the bid. Although s...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"26 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2024-01-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139509570","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Navigating paradoxes of identity and leadership in the age of digital transformation of construction industry: architects’ experiences and perceptions 建筑业数字化转型时代的身份与领导力悖论:建筑师的经验与感悟
IF 3.4
Construction Management and Economics Pub Date : 2024-01-08 DOI: 10.1080/01446193.2023.2293901
Syafizal Shahruddin, Siti Hamidah Husain
{"title":"Navigating paradoxes of identity and leadership in the age of digital transformation of construction industry: architects’ experiences and perceptions","authors":"Syafizal Shahruddin, Siti Hamidah Husain","doi":"10.1080/01446193.2023.2293901","DOIUrl":"https://doi.org/10.1080/01446193.2023.2293901","url":null,"abstract":"The ability of architects to adapt to diverse identities and effectively manage the paradoxical challenges posed by digital transformation is critical to their role as innovative leaders in the dyn...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"251 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2024-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139408291","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
House prices and labour productivity growth: Evidence from OECD countries 房价与劳动生产率增长:经合组织国家的证据
IF 3.4
Construction Management and Economics Pub Date : 2023-12-21 DOI: 10.1080/01446193.2023.2291082
Hassan F. Gholipour, M. Farzanegan, Mohammed N. Abu Al-Foul
{"title":"House prices and labour productivity growth: Evidence from OECD countries","authors":"Hassan F. Gholipour, M. Farzanegan, Mohammed N. Abu Al-Foul","doi":"10.1080/01446193.2023.2291082","DOIUrl":"https://doi.org/10.1080/01446193.2023.2291082","url":null,"abstract":"","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"17 2","pages":""},"PeriodicalIF":3.4,"publicationDate":"2023-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138948230","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Detecting bid rigging in public auctions for procuring infrastructure projects: formulating the reference scenario for decision-making 发现基础设施项目采购公开拍卖中的操纵投标行为:制定决策参考方案
IF 3.4
Construction Management and Economics Pub Date : 2023-12-14 DOI: 10.1080/01446193.2023.2287475
Regis Signor, Peter E. D. Love, Pablo Ballesteros-Pérez
{"title":"Detecting bid rigging in public auctions for procuring infrastructure projects: formulating the reference scenario for decision-making","authors":"Regis Signor, Peter E. D. Love, Pablo Ballesteros-Pérez","doi":"10.1080/01446193.2023.2287475","DOIUrl":"https://doi.org/10.1080/01446193.2023.2287475","url":null,"abstract":"Bid rigging is a fraudulent scheme in procurement auctions resulting in non-competitive bids awarded at prices above the competitive market. Bid rigging is a global problem that wastes public agenc...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"34 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2023-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138686566","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Exploring pathways to project success through project delivery team integration: a qualitative comparative analysis 通过项目交付团队整合探索项目成功之路:定性比较分析
IF 3.4
Construction Management and Economics Pub Date : 2023-12-11 DOI: 10.1080/01446193.2023.2289040
Bryan W. Franz, Joseph Olopade
{"title":"Exploring pathways to project success through project delivery team integration: a qualitative comparative analysis","authors":"Bryan W. Franz, Joseph Olopade","doi":"10.1080/01446193.2023.2289040","DOIUrl":"https://doi.org/10.1080/01446193.2023.2289040","url":null,"abstract":"Integration within project delivery teams can improve project outcomes in the building construction industry. However, integration across multiple firms and disciplines can be more challenging to m...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"250 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2023-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138565909","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Innovation ambidexterity in construction firms: external knowledge antecedents and performance consequences 建筑企业的创新双元性:外部知识前因与绩效后果
IF 3.4
Construction Management and Economics Pub Date : 2023-11-24 DOI: 10.1080/01446193.2023.2279195
Bismark Duodu, Damithri Gayashini Melagoda, Steve Rowlinson
{"title":"Innovation ambidexterity in construction firms: external knowledge antecedents and performance consequences","authors":"Bismark Duodu, Damithri Gayashini Melagoda, Steve Rowlinson","doi":"10.1080/01446193.2023.2279195","DOIUrl":"https://doi.org/10.1080/01446193.2023.2279195","url":null,"abstract":"Empirical evidence on the external knowledge search behaviour of construction firms and its effects on innovation ambidexterity (IA) and performance is limited. The purpose of this study is to exam...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"1 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2023-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138538488","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The lifecycle impact and value capture of circular business models in the built environment 在建筑环境中循环商业模式的生命周期影响和价值获取
IF 3.4
Construction Management and Economics Pub Date : 2023-11-16 DOI: 10.1080/01446193.2023.2279743
Rebecka Lundgren, Riikka Kyrö, Stefan Olander
{"title":"The lifecycle impact and value capture of circular business models in the built environment","authors":"Rebecka Lundgren, Riikka Kyrö, Stefan Olander","doi":"10.1080/01446193.2023.2279743","DOIUrl":"https://doi.org/10.1080/01446193.2023.2279743","url":null,"abstract":"Circular economy (CE) has been of utmost interest in the industry and research community in the preceding years. However, CE is still a nascent research field in the built environment context. As t...","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"65 1","pages":""},"PeriodicalIF":3.4,"publicationDate":"2023-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138538487","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Decoding the dynamics of BIM use practice in construction projects 解读建筑项目中BIM应用实践的动态
Construction Management and Economics Pub Date : 2023-11-03 DOI: 10.1080/01446193.2023.2277925
Yuqing Hu, Carrie S. Dossick
{"title":"Decoding the dynamics of BIM use practice in construction projects","authors":"Yuqing Hu, Carrie S. Dossick","doi":"10.1080/01446193.2023.2277925","DOIUrl":"https://doi.org/10.1080/01446193.2023.2277925","url":null,"abstract":"AbstractOver the past two decades, thought leaders positioned Building Information Modeling (BIM) as a driver to change the Architecture, Engineering, and Construction (AEC) industry. However, instances of unexpected BIM use have surfaced, with projects often shifting from BIM to hybrid or even solely 2D practices midway. What technology use conditions cause these practice-based rejections of BIM use and how these happen have not been fully explored and make BIM cannot fully play its role in a project. To fill this gap, we use structuration theory as a theoretical lens to analyze the interactions between BIM and project teams and explore how three technology use conditions, (interpretive, technological, and institutional), impact the interactions, which finally shape technology use practices. Specifically, a case study method has been selected. The research team attended a project for two years, collected meeting observations, and conducted surveys and interviews to track the emergent and situated BIM use practice in an integrated project setting with technology use conditions that changed over the course of the project. We analyzed how the three technology use conditions impacted the interactions between BIM and project teams in different ways and how these impacted change in different project phases. We conclude that the sustained use of BIM requires the alignment of project organizations with BIM features and alignment with both top-down and bottom-up investment in practice change, which includes motivation for senior management investment in a sustained project team, in individual capability training, and in early planning.Keywords: Building information modelingstructuration theorytechnology-in-practicepractice lens Disclosure statementThere are no relevant financial or non-financial competing interests to report.Data availability statementThe data that support the findings of this study are available on request from the corresponding author, YH. The data are not publicly available due to its containing information that could compromise the privacy of research participants.","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"14 6","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-11-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"135873898","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The ugly side of construction: modern slavery in the 2022 FIFA World Cup program 建筑丑陋的一面:2022年世界杯项目中的现代奴役
Construction Management and Economics Pub Date : 2023-10-29 DOI: 10.1080/01446193.2023.2269434
Yazan Alzoubi, Giorgio Locatelli, Tristano Sainati
{"title":"The ugly side of construction: modern slavery in the 2022 FIFA World Cup program","authors":"Yazan Alzoubi, Giorgio Locatelli, Tristano Sainati","doi":"10.1080/01446193.2023.2269434","DOIUrl":"https://doi.org/10.1080/01446193.2023.2269434","url":null,"abstract":"","PeriodicalId":51389,"journal":{"name":"Construction Management and Economics","volume":"16 2-3","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"136157504","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信