Engineering, Construction and Architectural Management最新文献

筛选
英文 中文
Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management 同步 BIM 成本模型和工程量清单,实现生命周期审计跟踪成本管理
Engineering, Construction and Architectural Management Pub Date : 2024-08-09 DOI: 10.1108/ecam-04-2024-0440
H. Chong, Yufan Zhang, Cen-Yin Lee, Fei Wang, Yubin Zhang
{"title":"Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management","authors":"H. Chong, Yufan Zhang, Cen-Yin Lee, Fei Wang, Yubin Zhang","doi":"10.1108/ecam-04-2024-0440","DOIUrl":"https://doi.org/10.1108/ecam-04-2024-0440","url":null,"abstract":"PurposeAudit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail management from a cost perspective; this study developed a lifecycle-based audit trail cost management framework. It used synchronized Building Information Modeling (BIM) cost models and Bills of Quantities (BoQs) to address the existing gap.Design/methodology/approachThis study employed a descriptive case study approach of a real-life hospital project in China. Data triangulation was achieved through interviews, observations, documents, and relevant artifacts.FindingsThe study identified three key factors contributing to cost variances between BIM cost models and BoQs: differences in measurement rules, model precision, and professional errors, particularly evident during the preliminary estimate stage. Notably, significant cost savings of approximately RMB 5.811 million were achieved during the detailed estimate stage. During the construction phase, a synchronized approach was deployed to improve precise payment verification and modifications to the BIM model. In the post-construction phase, the synchronized as-built BIM models and BoQs served as primary references to facilitate the resolution of operational discrepancies.Practical implicationsThe research contributes to the literature by proposing a synchronized approach of BIM cost models and BoQs. This approach enhances traceability and accountability of project information, catering to the digitalization needs of the construction industry.Originality/valueThis study unveils a pragmatic approach to enhancing transparency and accountability in audit-trail cost management by synchronizing BIM cost models and BoQs at various project stages. The synchronized approach offers a promising direction for future research and implementation of audit trail frameworks to enhance cost management in construction.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141923209","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Hybrid MCDM approach for analyzing barriers and formulating strategies for the adoption of modular construction in developing countries 分析发展中国家采用模块化建筑的障碍并制定相关战略的混合式 MCDM 方法
Engineering, Construction and Architectural Management Pub Date : 2024-08-09 DOI: 10.1108/ecam-01-2024-0082
O. N. Oyefusi, V. Arowoiya, Melissa Chan
{"title":"Hybrid MCDM approach for analyzing barriers and formulating strategies for the adoption of modular construction in developing countries","authors":"O. N. Oyefusi, V. Arowoiya, Melissa Chan","doi":"10.1108/ecam-01-2024-0082","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0082","url":null,"abstract":"PurposeThe construction industry in developed countries is witnessing a paradigm shift towards modular construction methods, driven by the need for efficiency, sustainability, and cost-effectiveness. However, the realization of these benefits in the context of developing countries is hindered by numerous barriers. Against this backdrop, this study seeks to contribute insights into the barriers hindering the adoption of modular construction in developing countries, specifically Nigeria, and further formulate effective strategies.Design/methodology/approachA thorough review of existing literature was conducted to identify the multifaceted barriers hindering the adoption of modular construction and the corresponding strategies. Subsequently, a panel of 13 experts were invited to utilize the Fuzzy Analytic Hierarchy Process (FAHP) approach to systematically evaluate these barriers based on their impact. Furthermore, the experts implored the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) approach to select and prioritize the most suitable strategies to mitigate these barriers.FindingsThe study revealed that the most critical barriers to modular construction are Client resistance to change and innovation, Limited experience in module installation, and Transportation constraints. Additionally, the study prioritizes 13 strategies, with the Development of effective guidelines, standards, and policies ranked highest. The insights from the ranking using the FAHP and TOPSIS approach were adopted to develop a framework for modular implementation in developing countries.Research limitations/implicationsThis study is limited to Nigeria due to its status as the country with the highest Gross Domestic Product (GDP) in Africa, and it is considered a suitable representation of the region as most of the countries in Africa are categorized as developing nations.Practical implicationsBy highlighting the most critical barriers and prioritizing effective strategies, the study provides actionable insights for overcoming obstacles to modular construction adoption. Decision-makers can use this information to develop targeted policies and training programs to promote the adoption of modular construction in developing countries.Originality/valueThe research provides valuable insights by not only identifying critical barriers but also presenting prioritized strategies, distinguishing itself from previous studies, and establishing itself as a novel resource for developing countries. This adopt a novel hybrid MCDM approach for modular construction in developing countries such as Nigeria which can serve as reference point to other developing countries seeking to adopt modular construction and leverage its numerous benefits.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141921872","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Sustainable development goals under threat: the impact of inflation on construction projects 受到威胁的可持续发展目标:通货膨胀对建筑项目的影响
Engineering, Construction and Architectural Management Pub Date : 2024-07-15 DOI: 10.1108/ecam-03-2024-0357
Andrew Ebekozien, C. Aigbavboa, W. Thwala, Mohamed Ahmed Hafez, M. Samsurijan
{"title":"Sustainable development goals under threat: the impact of inflation on construction projects","authors":"Andrew Ebekozien, C. Aigbavboa, W. Thwala, Mohamed Ahmed Hafez, M. Samsurijan","doi":"10.1108/ecam-03-2024-0357","DOIUrl":"https://doi.org/10.1108/ecam-03-2024-0357","url":null,"abstract":"PurposeDespite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is increasing, especially in developing countries, and is critical in cost overrun matters. It can deviate construction built-up rate components. This may thwart improving construction-related Sustainable Development Goals (SDGs). Studies concerning the impact of the inflation rate on construction-related SDGs are scarce in developing countries, including Nigeria. The study investigated the impact of inflation on Nigeria’s construction projects and their outcome on SDGs and suggested possible ways to improve achievement of construction-related SDGs and their targets.Design/methodology/approachThe researchers employed a qualitative research design. This is because of the study’s unexplored dimension. The researchers engaged 35 participants across major cities in Nigeria via semi-structured virtual and face-to-face interviews. The research utilised a thematic method for collated data and accomplished saturation.FindingsFindings reveal that the impact of inflation on construction projects, if not checked, could hinder achieving construction-related SDGs in Nigeria. This is because of the past three years of hyperinflation that cut across major construction components. It shows that the upward inflation rate threatens achieving construction-related SDGs and proffered measures to mitigate inflation and, by extension, enhance achieving construction-related SDGs. This includes a downward review of the Monetary Policy Rate, control of exchange rate volatility and addressing insecurity to restore FDIs and FPIs confidence.Originality/valueBesides suggesting possible solutions to mitigate hyperinflation on construction components to improve achieving construction-related SDGs, findings will stipulate government policymakers put measures in place through favourable fiscal and monetary policy implementation and encourage moving from a consumption to a production nation.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141833161","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Public perceived efficacy of emergency infrastructure project: antecedents in a triadic reciprocal determinism 公众对应急基础设施项目的效能感知:三元互惠决定论中的前因后果
Engineering, Construction and Architectural Management Pub Date : 2024-06-04 DOI: 10.1108/ecam-05-2023-0453
Caiyun Cui, Tingyu Xie, Yong Liu, Meng Liu, Huan Cao, Huilian Li
{"title":"Public perceived efficacy of emergency infrastructure project: antecedents in a triadic reciprocal determinism","authors":"Caiyun Cui, Tingyu Xie, Yong Liu, Meng Liu, Huan Cao, Huilian Li","doi":"10.1108/ecam-05-2023-0453","DOIUrl":"https://doi.org/10.1108/ecam-05-2023-0453","url":null,"abstract":"PurposeThis paper aims to explore the influencing factors of public perceived efficacy of emergency infrastructure projects based on the triadic interactive determinism, and analyze the relationship among these factors.Design/methodology/approachBased on the triadic interactive determinism, we explored the factors influencing public perceived efficacy of emergency infrastructure project and empirically verified the relationship among these factors and perceived efficacy by using data drawn from a questionnaire survey of 491 residents near Leishenshan Hospital, Jiangxia District, Wuhan, China.FindingsPrior experience, emotional response, personal expectation, public trust, context message and interactivity level, namely behavior, individual and environment, affect the perceived efficacy of public emergency infrastructure projects.Practical implicationsThe results offer an insight into public perceived efficacy of emergency infrastructure project from the perspective of antecedents in a triadic reciprocal determinism, which provides a reference basis for the sustainable development of the emergency infrastructure projects. This study also suggests valuable practical implications to government departments to improve the quality of administrative decision-making effectively.Originality/valueAlthough existing studies have found some influencing factors of public perceived efficacy in general infrastructure, there is still a lack of systematic carding and quantitative description of influencing factors of public perceived efficacy of emergency infrastructure projects. This study bridges this gap by exploring the determinants and their influencing relationship of public perceived efficacy especially for emergency infrastructure projects.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141268001","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrated measurement of public safety risks in international construction projects in the belt and road initiative 对 "一带一路 "国际建设项目中的公共安全风险进行综合衡量
Engineering, Construction and Architectural Management Pub Date : 2024-06-03 DOI: 10.1108/ecam-11-2023-1102
Pengcheng Xiang, Simai Yang, Yongqi Yuan, Ranyang Li
{"title":"Integrated measurement of public safety risks in international construction projects in the belt and road initiative","authors":"Pengcheng Xiang, Simai Yang, Yongqi Yuan, Ranyang Li","doi":"10.1108/ecam-11-2023-1102","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1102","url":null,"abstract":"PurposeThe purpose of this paper is to develop a comprehensive understanding of the public safety risks of international construction projects (ICPs) from the perspective of threat and vulnerability. A novel and comprehensive risk assessment approach is developed from a systemic perspective and applied to the Belt and Road Initiative (BRI) to improve the public safety risk management strategy for ICPs in BRI.Design/methodology/approachFirst, a public safety risk indicator system was constructed from the two dimensions, namely threat and vulnerability. Next, an integrated measurement model was constructed by combining the Genetic Algorithm-Backpropagation (GA-BP) neural network, fuzzy comprehensive evaluation method and matter-element extension (MME) method. Data from 49 countries involved in the BRI, as well as five typical projects, were used to validate the model. Finally, targeted risk prevention measures were identified for use at the national, enterprise and project levels.FindingsThe findings indicate that while the vulnerability risks of typical projects in each region of the BRI were generally low, threat risks were high in West Asia and North Africa, Commonwealth of Independent States (CIS) countries and South Asia.Originality/valueFirst, the structure of the public safety risk system of ICPs was analyzed using vulnerability and system theories. The connotation of public safety risk was defined based on two dimensions, namely threat and vulnerability. The idea of measuring threat risk with public data and measuring vulnerability risk with project data was clarified, and the risk measurement was integrated into the measurement results to help researchers and managers understand and systematically consider the public safety risks of ICPs. Second, a public safety risk indicator system was constructed, including 18 threat risk indicators and 14 vulnerability risk indicators to address the gaps in the existing research. The MEE model was employed to overcome the problem of incompatible indicator systems and provide stable and credible integrated measurement results. Finally, the whole-process public safety risk management scheme designed in this study can help to both provide a reference point for the Chinese enterprises and oversea contractors in market selection as well as improve ICP public safety risk management.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141272571","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Key barriers and mitigation strategies towards sustainable prefabricated construction – a case of developing economies 实现可持续预制建筑的主要障碍和缓解战略--以发展中经济体为例
Engineering, Construction and Architectural Management Pub Date : 2024-05-20 DOI: 10.1108/ecam-09-2023-0978
J. Jayawardana, M. Sandanayake, Supun Jayasinghe, Asela Kulatunga, Guomin Zhang
{"title":"Key barriers and mitigation strategies towards sustainable prefabricated construction – a case of developing economies","authors":"J. Jayawardana, M. Sandanayake, Supun Jayasinghe, Asela Kulatunga, Guomin Zhang","doi":"10.1108/ecam-09-2023-0978","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0978","url":null,"abstract":"PurposeThe present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated strategy framework to mitigate and overcome the obstacles.Design/methodology/approachThe research process included a comprehensive literature review, a pilot study, a questionnaire survey for data collection, statistical analysis and a qualitative content analysis.FindingsRanking method revealed that all 23 barriers were significant. Top significant barriers include challenges in prefabricated component transportation, high capital investment costs and lack of awareness of the benefits of PFC among owners/developers. Factor analysis clustered six barrier categories (BCs) that fit the barrier factors, explaining 71.22% of the cumulative variance. Fuzzy synthetic evaluation revealed that all BCs significantly influence PFC adoption in Sri Lanka. Finally, the proposed mitigation strategies were mapped with barriers to complete the integrated framework.Practical implicationsThe study outcomes are relevant to construction industry stakeholders of Sri Lanka, who are keen to enhance construction efficiencies. The implications can also benefit construction industry stakeholders and policymakers to formulate policies and regulations and identify mitigation solutions.Originality/valueThe study provides deeper insights into the challenges to adopting prefabrication in South Asian countries such as Sri Lanka. Furthermore, the integrated framework is a novel contribution that can be used to derive actions to mitigate barriers in developing economies.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140961877","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Impact of construction workers informal safety communication (CWISC) on safety performance on construction sites 建筑工人非正式安全交流(CWISC)对建筑工地安全绩效的影响
Engineering, Construction and Architectural Management Pub Date : 2024-05-17 DOI: 10.1108/ecam-09-2023-0906
Alex Acheampong, Elvis Konadu Adjei, A. Adade-Boateng, V. K. Acheamfour, A. Afful, Evans Boateng
{"title":"Impact of construction workers informal safety communication (CWISC) on safety performance on construction sites","authors":"Alex Acheampong, Elvis Konadu Adjei, A. Adade-Boateng, V. K. Acheamfour, A. Afful, Evans Boateng","doi":"10.1108/ecam-09-2023-0906","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0906","url":null,"abstract":"PurposeAn understanding of the impact of construction workers informal safety communication (CWISC), a form of parallel safety communication between workers, on safety performance among construction workers is crucial in order to develop effective strategies for improving safety performance in the construction industry. However, research remains scant on the impact of CWISC on safety performance. This study empirically aims to test the relationship between these important constructs.Design/methodology/approachStatistical analysis was used to examine the relationship in a hypothetical model with two latent variables; the exogenous variables represented by two groups of informal safety communication: friends and crew members and the endogenous variables represented by two groups of Safety performance metrics: safety compliance and safety participation, was tested.FindingsThe emergent findings revealed that there is a significant relationship between informal safety communication among crew members and safety compliance, and also between informal safety communication among friends on construction sites and safety participation. These findings emphasize the importance of fostering effective safety communication and collaboration within construction crews, as well as recognizing the influence friendships on safety performance. Stakeholders can leverage on these findings to implement policies to improve safety performance.Originality/valueThe study presents insightful practical knowledge on how CWISC impacts safety performance on construction sites. Practical recommendations for organizations are also proposed, e.g., development of team-building activities, platforms for sharing safety-related information and experiences, mentorship programs and initiatives that encourage social interaction among workers.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140964799","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Evolutionary game of incentive strategy for Chinese prefabricated buildings based on system dynamics from the perspective of prospect theory 前景理论视角下基于系统动力学的中国预制装配式建筑激励战略进化博弈
Engineering, Construction and Architectural Management Pub Date : 2024-05-15 DOI: 10.1108/ecam-10-2023-1031
Haize Pan, Bingfeng Yang, Yongwei Pan, Zhenhua Luo
{"title":"Evolutionary game of incentive strategy for Chinese prefabricated buildings based on system dynamics from the perspective of prospect theory","authors":"Haize Pan, Bingfeng Yang, Yongwei Pan, Zhenhua Luo","doi":"10.1108/ecam-10-2023-1031","DOIUrl":"https://doi.org/10.1108/ecam-10-2023-1031","url":null,"abstract":"PurposeAs an effective measure for reducing energy consumption and achieving carbon neutrality, prefabricated building projects (PBPs) have attracted considerable attention in China. Although the Chinese Government has vigorously promoted PBPs, neither developers nor consumers have high recognition of PBPs. This study aimed to explore the decision-making behaviour of governments, developers and consumers in promoting the development of prefabricated buildings in China and to better optimise the incentive strategies for prefabricated buildings in China.Design/methodology/approachBased on prospect and evolutionary game theories, an evolutionary game model of three stakeholders in the development of PBPs – government, developers and consumers – was constructed. Combined with the system dynamics theory, the incentive policy behaviour and influencing factors of the three parties in the evolutionary game model were analysed.FindingsThe results showed that the initial probability of the three parties affects the decision-making behaviour of each party and that of other stakeholders. Government subsidies to developers are more sensitive than developers themselves. There is a certain threshold for the scope of government subsidies to consumers, and exceeding this threshold does not promote the development of PBPs. Based on the results, policy recommendations to the government, developers and consumers were proposed to enhance PBP development.Originality/valueThis study provides suggestions for governments to formulate reasonable incentive policies for prefabricated buildings and a specific theoretical basis for the sound development of prefabricated buildings.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140972660","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Critical risk management strategies for the operation of public–private partnerships: a vulnerability perspective of infrastructure projects 公私伙伴关系运营的关键风险管理战略:基础设施项目的脆弱性视角
Engineering, Construction and Architectural Management Pub Date : 2024-05-14 DOI: 10.1108/ecam-12-2023-1292
Weiling Jiang, Jie Jiang, Igor Martek, Wen Jiang
{"title":"Critical risk management strategies for the operation of public–private partnerships: a vulnerability perspective of infrastructure projects","authors":"Weiling Jiang, Jie Jiang, Igor Martek, Wen Jiang","doi":"10.1108/ecam-12-2023-1292","DOIUrl":"https://doi.org/10.1108/ecam-12-2023-1292","url":null,"abstract":"PurposeThe success of public–private partnership (PPP) projects is highly correlated to the successful management of risks encountered during the operation phase. PPP projects are especially exposed to risk due to the long operation period over which revenues need to be generated to recoup substantial initial investment and operational running costs. Despite the critical impact of risk exposure, limited research has been specifically undertaken on the matter of operational risk management. This study seeks to address this oversight by identifying and evaluating operational risk management strategies for PPPs.Design/methodology/approachVulnerability theory is the theoretical lens used, with context drawn from Chinese PPP projects. Based on the data collected from expert interviews and questionnaires, 28 operational risk management strategies are identified. A fuzzy synthetic method is employed to analyze the effectiveness of the 28 strategies.FindingsThe findings reveal that providing an exit mechanism clause into the contract, establishing a comprehensive performance evaluation mechanism and developing a clear compensation mechanism are the top three effective strategies. This study also reveals that risk mitigation approaches that reduce vulnerability prove more effective than attempts to reduce external threats. Specifically, strategies aimed at managing contract, political, technical and financial risk are the most effective.Originality/valueThe findings of this study extend current knowledge regarding the risk management of PPP projects. They also offer a reference by which practitioners may select effective operational risk management pathways and thereby, galvanize the sustainable development of PPPs.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140979505","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A framework for assessing stakeholder interface health in complex capital projects 评估复杂基本建设项目中利益相关者界面健康状况的框架
Engineering, Construction and Architectural Management Pub Date : 2024-05-10 DOI: 10.1108/ecam-07-2023-0684
Qianqian Ju, Yan Wang, Hui Liu, Xiaoyun Du, Yifei Li
{"title":"A framework for assessing stakeholder interface health in complex capital projects","authors":"Qianqian Ju, Yan Wang, Hui Liu, Xiaoyun Du, Yifei Li","doi":"10.1108/ecam-07-2023-0684","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0684","url":null,"abstract":"PurposeStakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy interfaces between stakeholders often lead to significant interface conflicts, which gradually become apparent in the construction stage. However, stakeholder interface health (SIH) has not been well understood and measured in the construction industry by either scholars or practitioners. It is essential to identify unhealthy interface relationships between stakeholders by comprehensively assessing SIH for enhancing project performance.Design/methodology/approachThe study provided a comprehensive framework to assess SIH. The assessment was based on Wuli-Shili-Renli theory. Moreover, the CRITIC and Grey-TOPSIS methodologies were applied to precisely evaluate the SIH level. Besides, graph-based interface networks were developed to visualize SIH. At last, the framework was applied to a mass rapid transit project in China to test the validity of the study.FindingsThe result showed that stakeholder interfaces with strict contract constraints are healthier. On the other hand, IM behaviors make up for the soft coordination mechanism without contract constraints to a certain extent. The results of the case study were consistent with the actual project practices. The proposed framework provided a useful IM tool for assessing and visualizing SIH.Research limitations/implicationsThe limitation of this study is that only the mass rapid transit project was selected for empirical analysis to validate the effectiveness of the proposed framework. It is recommended that the proposed framework be applied to other types of complex capital projects to further discussions in IM.Practical implicationsTheoretically, this study introduces a comprehensive framework to measure the health of stakeholder interfaces in complex capital projects, which helps to provide a theoretical basis and methodological support for stakeholder interface management.Social implicationsPractically, applying SIH assessment to existing interface management procedures can help the project manager identify interface conflicts between stakeholders in time and eventually contribute to the improvement of PM performance. At the same time, the interface management team tracks the responsibilities of unhealthy interface stakeholders and requires them to take measures to improve the SIH level. Stakeholder interfaces with lower health scores should be given more attention. The proposed framework can serve as a novel IM approach to identify weaknesses in IM and take targeted management measures to alleviate unhealthy stakeholder interface relationships.Originality/valueThe study provides an innovative method for scientifically and accurately assessing SIH. This research can help scholars and practitioners in the project management field facilitate the diagnosis of unhealthy interface relationships and provide decision support","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140991675","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信