Flexible Services and Manufacturing Journal最新文献

筛选
英文 中文
Cooperative and non-cooperative algorithms for distributed parallel jobs scheduling 分布式并行作业调度的协同和非协同算法
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-09-22 DOI: 10.1007/s10696-022-09469-4
J. Behnamian
{"title":"Cooperative and non-cooperative algorithms for distributed parallel jobs scheduling","authors":"J. Behnamian","doi":"10.1007/s10696-022-09469-4","DOIUrl":"https://doi.org/10.1007/s10696-022-09469-4","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":" ","pages":""},"PeriodicalIF":2.7,"publicationDate":"2022-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48693239","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A heuristic for the critical chain scheduling problem based on left shifts of activities 基于活动左移的关键链调度问题的启发式算法
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-09-16 DOI: 10.1007/s10696-022-09466-7
W. Peng, Xuejun Lin
{"title":"A heuristic for the critical chain scheduling problem based on left shifts of activities","authors":"W. Peng, Xuejun Lin","doi":"10.1007/s10696-022-09466-7","DOIUrl":"https://doi.org/10.1007/s10696-022-09466-7","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":" ","pages":""},"PeriodicalIF":2.7,"publicationDate":"2022-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44959095","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A bi-objective multi-population biased random key genetic algorithm for joint scheduling quay cranes and speed adjustable vehicles in container terminals 集装箱码头码头起重机与调速器联合调度的双目标多种群偏差随机关键遗传算法
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-09-14 DOI: 10.1007/s10696-022-09467-6
D. Fontes, S. Homayouni
{"title":"A bi-objective multi-population biased random key genetic algorithm for joint scheduling quay cranes and speed adjustable vehicles in container terminals","authors":"D. Fontes, S. Homayouni","doi":"10.1007/s10696-022-09467-6","DOIUrl":"https://doi.org/10.1007/s10696-022-09467-6","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":"1 1","pages":"241-268"},"PeriodicalIF":2.7,"publicationDate":"2022-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"52202886","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Elite solutions and Tabu assisted variable neighbourhood descent for rescheduling problems in the steelmaking-refining-continuous casting process 炼钢-精炼-连铸过程重调度问题的精英解和禁忌辅助变邻域下降
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-09-11 DOI: 10.1007/s10696-022-09465-8
Kunkun Peng, Xudong Deng, Chunjiang Zhang, Weiming Shen, Yanan Song, Jianhui Mou, Ao Liu
{"title":"Elite solutions and Tabu assisted variable neighbourhood descent for rescheduling problems in the steelmaking-refining-continuous casting process","authors":"Kunkun Peng, Xudong Deng, Chunjiang Zhang, Weiming Shen, Yanan Song, Jianhui Mou, Ao Liu","doi":"10.1007/s10696-022-09465-8","DOIUrl":"https://doi.org/10.1007/s10696-022-09465-8","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":" ","pages":""},"PeriodicalIF":2.7,"publicationDate":"2022-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44122023","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Formulations and exact solution approaches for a coupled bin-packing and lot-sizing problem with sequence-dependent setups 具有序列相关设置的装箱和批量问题的公式和精确解方法
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-09-02 DOI: 10.1007/s10696-022-09464-9
G. M. Melega, S. A. de Araujo, R. Jans, R. Morabito
{"title":"Formulations and exact solution approaches for a coupled bin-packing and lot-sizing problem with sequence-dependent setups","authors":"G. M. Melega, S. A. de Araujo, R. Jans, R. Morabito","doi":"10.1007/s10696-022-09464-9","DOIUrl":"https://doi.org/10.1007/s10696-022-09464-9","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":" ","pages":""},"PeriodicalIF":2.7,"publicationDate":"2022-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48509825","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Robust berth scheduling using machine learning for vessel arrival time prediction 基于机器学习的船舶到达时间预测鲁棒泊位调度
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-09-01 DOI: 10.1007/s10696-022-09462-x
Lorenz Kolley, Nicolas Rückert, Marvin Kastner, C. Jahn, Kathrin Fischer
{"title":"Robust berth scheduling using machine learning for vessel arrival time prediction","authors":"Lorenz Kolley, Nicolas Rückert, Marvin Kastner, C. Jahn, Kathrin Fischer","doi":"10.1007/s10696-022-09462-x","DOIUrl":"https://doi.org/10.1007/s10696-022-09462-x","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":"35 1","pages":"29-69"},"PeriodicalIF":2.7,"publicationDate":"2022-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46274223","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
A two-step evolutionary algorithm for the distributor’s pallet loading problem with multi-size pallets 多尺寸托盘分配器托盘装载问题的两步进化算法
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-08-22 DOI: 10.1007/s10696-022-09461-y
A. Mungwattana, Thanakrit Piyachayawat, G. Janssens
{"title":"A two-step evolutionary algorithm for the distributor’s pallet loading problem with multi-size pallets","authors":"A. Mungwattana, Thanakrit Piyachayawat, G. Janssens","doi":"10.1007/s10696-022-09461-y","DOIUrl":"https://doi.org/10.1007/s10696-022-09461-y","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":" ","pages":""},"PeriodicalIF":2.7,"publicationDate":"2022-08-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45801886","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Sequencing and routing in a large warehouse with high degree of product rotation 具有高度产品轮换的大型仓库中的排序和路线
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-08-19 DOI: 10.1007/s10696-022-09463-w
G. Lanza, M. Passacantando, M. Scutellá
{"title":"Sequencing and routing in a large warehouse with high degree of product rotation","authors":"G. Lanza, M. Passacantando, M. Scutellá","doi":"10.1007/s10696-022-09463-w","DOIUrl":"https://doi.org/10.1007/s10696-022-09463-w","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":" ","pages":""},"PeriodicalIF":2.7,"publicationDate":"2022-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48484591","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Optimizing production levels in maritime inventory routing with load-dependent speed optimization 基于负载相关速度优化的海运库存路径中的生产水平优化
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-08-19 DOI: 10.1007/s10696-022-09460-z
Abdalrahman Algendi, S. Urrutia, L. M. Hvattum
{"title":"Optimizing production levels in maritime inventory routing with load-dependent speed optimization","authors":"Abdalrahman Algendi, S. Urrutia, L. M. Hvattum","doi":"10.1007/s10696-022-09460-z","DOIUrl":"https://doi.org/10.1007/s10696-022-09460-z","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":"35 1","pages":"111-141"},"PeriodicalIF":2.7,"publicationDate":"2022-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45540771","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
The shunting scheduling of EMU first-level maintenance in a stub-end depot 某车辆段动车组一级检修调车调度
IF 2.7 3区 工程技术
Flexible Services and Manufacturing Journal Pub Date : 2022-08-01 DOI: 10.1007/s10696-022-09459-6
M. He, Qiuhua Tang, J. Gupta, Di Yin, Zikai Zhang
{"title":"The shunting scheduling of EMU first-level maintenance in a stub-end depot","authors":"M. He, Qiuhua Tang, J. Gupta, Di Yin, Zikai Zhang","doi":"10.1007/s10696-022-09459-6","DOIUrl":"https://doi.org/10.1007/s10696-022-09459-6","url":null,"abstract":"","PeriodicalId":50441,"journal":{"name":"Flexible Services and Manufacturing Journal","volume":"35 1","pages":"754-796"},"PeriodicalIF":2.7,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42342872","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信