Journal of Engineering Design and Technology最新文献

筛选
英文 中文
An inquiry into the health and safety management practices of construction firms in South Korea 韩国建筑企业健康与安全管理实践调查
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-07-11 DOI: 10.1108/jedt-02-2023-0050
T. Park, Abdul–Majeed Mahamadu, K. Agyekum, Anita Odame Adade-Boateng, P. Manu, E. Adinyira, Selorm Adukpo
{"title":"An inquiry into the health and safety management practices of construction firms in South Korea","authors":"T. Park, Abdul–Majeed Mahamadu, K. Agyekum, Anita Odame Adade-Boateng, P. Manu, E. Adinyira, Selorm Adukpo","doi":"10.1108/jedt-02-2023-0050","DOIUrl":"https://doi.org/10.1108/jedt-02-2023-0050","url":null,"abstract":"\u0000Purpose\u0000This paper aims to investigate the Occupational Safety and Health (OSH) management practices of construction companies in South Korea to ascertain specific components and practices that need improvement for successful OSH performance.\u0000\u0000\u0000Design/methodology/approach\u0000A quantitative research strategy was adopted. A close-ended questionnaire survey covering 45 OSH management practices was sent to 324 contractors; 108 responses were gathered, representing a response rate of 33.3%. Data were analysed using simple descriptive statistics (frequencies and percentages) and Pearson’s chi-square test.\u0000\u0000\u0000Findings\u0000The findings revealed that there is a moderate level of implementation of OSH management practices among construction firms in South Korea. However, there is a significant disparity in terms of implementation between large enterprises on the one hand and small to medium enterprises on the other. Furthermore, a few of the business characteristics (i.e. the size of companies and certification to OHSAS 18001) were closely associated with the extent of the implementation of OSH management practices.\u0000\u0000\u0000Practical implications\u0000This research uncovers the OSH management practices that are poorly implemented and lays the foundation for appropriate measures to improve OSH in South Korean construction companies. It suggests an effective strategy for communicating health and safety issues to workers, training safety managers, reviewing risk assessments, reviewing the health and safety plan, incentivising workers by rewarding good behaviour and having a penal mechanism for employees not adhering to the rules.\u0000\u0000\u0000Originality/value\u0000The study provides insights into an under-investigated South Korean construction industry topic. It offers additional insight into state-of-the-art health and safety management practices in the construction industry in South Korea. Furthermore, it establishes which components of OSH management practice require improvement in the Korean context. This is also one of the few studies in OSH which establishes the association between the construction business characteristics and OSH management in the South Korean construction domain.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43559137","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: evidence from Zambia 发展中国家私营部门参与公私合作项目的挑战、驱动因素和激励措施:来自赞比亚的证据
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-07-11 DOI: 10.1108/jedt-03-2023-0092
E. Zulu, Josephine Mutwale, S. Zulu, I. Musonda, N. Kavishe, C. Moobela
{"title":"Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: evidence from Zambia","authors":"E. Zulu, Josephine Mutwale, S. Zulu, I. Musonda, N. Kavishe, C. Moobela","doi":"10.1108/jedt-03-2023-0092","DOIUrl":"https://doi.org/10.1108/jedt-03-2023-0092","url":null,"abstract":"\u0000Purpose\u0000Governments in developing countries seeking to meet their infrastructure backlog are increasingly turning to public–private partnerships (PPP) due to a lack of public funds. However, while there are factors which drive the current uptake of projects, there are challenges with attracting private finance, and it is not clear what incentives can be used to attract more private participation, especially in sub-Saharan Africa (SSA). Therefore, this study aims to examine challenges, drivers and incentives that affect private participation in PPP projects in Zambia.\u0000\u0000\u0000Design/methodology/approach\u0000The study used a qualitative approach with semi-structured interviews with participants who had first-hand experience working on the administration of PPP projects. The participants were predominantly from the public sector, and so the results are largely a public sector perspective on the matter.\u0000\u0000\u0000Findings\u0000The findings show that bureaucracy and a poor business environment emanating from poor policies, long procedures and a poor economic environment are the main challenges affecting PPP projects. The current demand for the projects is being driven by a stable business and economic environment while incentives include enhancing the business environment by improving procedures and policies.\u0000\u0000\u0000Originality/value\u0000The study contributes to extant literature by proposing an overarching theory about the challenges affecting the implementation of PPP projects in Zambia, in particular, and in SSA, in general. The results show areas where governments and government agencies responsible for PPP projects can focus attention to promote private participation.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45354355","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Designing multivariable PI controller with multi-response optimization for a pilot plant binary distillation column: a robust design approach 中试装置二元蒸馏塔多响应优化多变量PI控制器的鲁棒设计方法
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-07-07 DOI: 10.1108/jedt-12-2022-0616
Vinayambika S. Bhat, Thirunavukkarasu Indiran, S. Selvanathan, S. Bhat
{"title":"Designing multivariable PI controller with multi-response optimization for a pilot plant binary distillation column: a robust design approach","authors":"Vinayambika S. Bhat, Thirunavukkarasu Indiran, S. Selvanathan, S. Bhat","doi":"10.1108/jedt-12-2022-0616","DOIUrl":"https://doi.org/10.1108/jedt-12-2022-0616","url":null,"abstract":"Purpose The purpose of this paper is to propose and validate a robust industrial control system. The aim is to design a Multivariable Proportional Integral controller that accommodates multiple responses while considering the process's control and noise parameters. In addition, this paper intended to develop a multidisciplinary approach by combining computational science, control engineering and statistical methodologies to ensure a resilient process with the best use of available resources. Design/methodology/approach Taguchi's robust design methodology and multi-response optimisation approaches are adopted to meet the research aims. Two-Input-Two-Output transfer function model of the distillation column system is investigated. In designing the control system, the Steady State Gain Matrix and process factors such as time constant (t) and time delay (?) are also used. The unique methodology is implemented and validated using the pilot plant's distillation column. To determine the robustness of the proposed control system, a simulation study, statistical analysis and real-time experimentation are conducted. In addition, the outcomes are compared to different control algorithms. Findings Research indicates that integral control parameters (Ki) affect outputs substantially more than proportional control parameters (Kp). The results of this paper show that control and noise parameters must be considered to make the control system robust. In addition, Taguchi's approach, in conjunction with multi-response optimisation, ensures robust controller design with optimal use of resources. Eventually, this research shows that the best outcomes for all the performance indices are achieved when Kp11 = 1.6859, Kp12 = −2.061, Kp21 = 3.1846, Kp22 = −1.2176, Ki11 = 1.0628, Ki12 = −1.2989, Ki21 = 2.454 and Ki22 = −0.7676. Originality/value This paper provides a step-by-step strategy for designing and validating a multi-response control system that accommodates controllable and uncontrollable parameters (noise parameters). The methodology can be used in any industrial Multi-Input-Multi-Output system to ensure process robustness. In addition, this paper proposes a multidisciplinary approach to industrial controller design that academics and industry can refine and improve.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45469146","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Design for mixed model final assembly line (DfMMFAL): a new tool for assembly interface identification based on assembly process planning 混合模型总装线设计:一种基于装配工艺规划的装配界面识别新工具
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-07-03 DOI: 10.1108/jedt-11-2022-0582
M. B. Edouard, Jean-Claude Camille, Bernier Vincent, Aoussat Améziane
{"title":"Design for mixed model final assembly line (DfMMFAL): a new tool for assembly interface identification based on assembly process planning","authors":"M. B. Edouard, Jean-Claude Camille, Bernier Vincent, Aoussat Améziane","doi":"10.1108/jedt-11-2022-0582","DOIUrl":"https://doi.org/10.1108/jedt-11-2022-0582","url":null,"abstract":"Purpose\u0000This paper aims to fulfil a need to identify assembly interfaces from existing products based on their Assembly Process Planning (APP). It proposes a tool to identify assembly interfaces responsible for reused components integration. It is integrated into a design for mixed model final assembly line approach by focusing on the identification of assembly interfaces as a generic tool. It aims to answer the problem of interfaces’ identification from the APP.\u0000\u0000\u0000Design/methodology/approach\u0000A tool is developed to identify assembly interfaces responsible for reused component integration. It is based on the use of a rule-based algorithm that analyses an APP and then submits the results to prohibition lists to check their relevance. The tool is then tested using a case study. Finally, the resulting list is subjected to a visual validation step to validate whether the identified interface is a real interface.\u0000\u0000\u0000Findings\u0000The results of this study are a tool named ICARRE which identify assembly interfaces using three steps. The tool has been validated by a case study from the helicopter industry.\u0000\u0000\u0000Research limitations/implications\u0000As some interfaces are not contained in the same assembly operations and therefore, may not have been identified by the rule-based algorithm. More research should be done by testing and improving the algorithm with other case studies.\u0000\u0000\u0000Practical implications\u0000The paper includes implications for new product development teams to address the difficulties of integrating reused components into different products.\u0000\u0000\u0000Originality/value\u0000This paper presents a tool for identifying interfaces when sources of knowledge do not allow the use of current methods.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49345784","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrated applications of building information modeling in project cost management: a systematic review 建筑信息模型在工程造价管理中的综合应用综述
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-06-19 DOI: 10.1108/jedt-10-2022-0538
A. M. Farouk, R. Rahman
{"title":"Integrated applications of building information modeling in project cost management: a systematic review","authors":"A. M. Farouk, R. Rahman","doi":"10.1108/jedt-10-2022-0538","DOIUrl":"https://doi.org/10.1108/jedt-10-2022-0538","url":null,"abstract":"\u0000Purpose\u0000Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.\u0000\u0000\u0000Design/methodology/approach\u0000This study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.\u0000\u0000\u0000Findings\u0000Eighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.\u0000\u0000\u0000Originality/value\u0000To the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43296115","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Building mechanism of the initial trust motivation of owners toward contractors 业主对承包商初始信任动机的构建机制
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-06-16 DOI: 10.1108/jedt-06-2022-0331
Huimin Li, Mengxuan Liang, Han Han, Wenjuan Zhang
{"title":"Building mechanism of the initial trust motivation of owners toward contractors","authors":"Huimin Li, Mengxuan Liang, Han Han, Wenjuan Zhang","doi":"10.1108/jedt-06-2022-0331","DOIUrl":"https://doi.org/10.1108/jedt-06-2022-0331","url":null,"abstract":"\u0000Purpose\u0000This paper aims to study the initial trust of the owner to the contractor, establish the initial trust mechanism, explore the factors that affect the initial trust of the owner to the contractor and analyze its influence mechanism. Based on this, it is easy for the owners and contractors to take targeted measures to improve the initial trust, which is conducive to the sustainable development of the project.\u0000\u0000\u0000Design/methodology/approach\u0000On the basis of reading a large amount of literature, this paper constructs the occurrence mechanism of the owner's initial trust to the contractor from the five factors of trust propensity, trust belief, trustee’s characteristics, institution-based trust, trust motivation and from the perspective of the owner using the structural equation model for questionnaire survey and empirical analysis.\u0000\u0000\u0000Findings\u0000The results of this paper show that the institution-based trust, the trustee’s characteristics and the trust belief of the trustor clearly have a positive effect on trust motivation, and the trustee’s characteristics have the most significant effect on the trust motivation. The influence of trust propensity on trust motivation was not significant.\u0000\u0000\u0000Originality/value\u0000This paper studies the occurrence mechanism of the owner's initial trust in the contractor, discusses its influencing factors and analyzes the influence of these factors on the initial trust, which enriches the theoretical system of initial trust research. The results of this study can help owners and contractors to develop targeted measures to build good initial trust.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44914083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Investigating the implementation of immersive technologies within on-site construction safety processes 调查现场施工安全流程中沉浸式技术的实施情况
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-06-13 DOI: 10.1108/jedt-01-2023-0005
Mark Swallow, S. Zulu
{"title":"Investigating the implementation of immersive technologies within on-site construction safety processes","authors":"Mark Swallow, S. Zulu","doi":"10.1108/jedt-01-2023-0005","DOIUrl":"https://doi.org/10.1108/jedt-01-2023-0005","url":null,"abstract":"\u0000Purpose\u0000The benefits of integrating immersive technologies (ImTs) within a construction safety context are acknowledged within the literature; however, its practical application on construction sites remains low. Whilst research into the integration of ImTs within the construction industry is underway, most have viewed this from a broader adoption context or within educational settings, and not specifically from a practical on-site safety perspective. Therefore, the purpose of this study is to address the contributing factors to its integration within on-site safety processes, using the experiences of active construction professionals.\u0000\u0000\u0000Design/methodology/approach\u0000This study adopts a qualitative approach. Data was collected through online focus groups involving UK based construction professionals with experience in using ImTs, recruited using selective sampling. Data sets were subsequently analysed using inductive thematic analysis and are presented within key themes.\u0000\u0000\u0000Findings\u0000The results showed that among the experienced construction professionals, the use of ImTs specifically for on-site safety applications (including inductions/training/workshops) was rare on projects. The findings identified various contributing factors related to the integration of ImTs, including the potential improvements in on-site safety practices such as enhanced communication of hazards, safety planning, engagement during training and more accurate risk assessment. Critical challenges, concerns and frustrations included a lack of engagement from senior level management, inadequate leadership, limited investment, a need for digital expertise, fear of complacency and the acceptance of ImTs within existing safety processes from the wider project team.\u0000\u0000\u0000Originality/value\u0000This study provides a fresh perspective to this field by using practical accounts from active and experienced on-site construction professionals. This study supports the integration of ImTs within the construction industry, presenting key contributing factors influencing its integration within on-site safety processes. These factors can be considered by industry adopters, and includes the rationale, challenges and potential on-site benefits of ImTs.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48991401","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A hybrid machine learning approach for early cost estimation of pile foundations 一种用于桩基早期成本估算的混合机器学习方法
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-06-13 DOI: 10.1108/jedt-03-2023-0097
G. Deepa, A. Niranjana, A. Balu
{"title":"A hybrid machine learning approach for early cost estimation of pile foundations","authors":"G. Deepa, A. Niranjana, A. Balu","doi":"10.1108/jedt-03-2023-0097","DOIUrl":"https://doi.org/10.1108/jedt-03-2023-0097","url":null,"abstract":"\u0000Purpose\u0000This study aims at proposing a hybrid model for early cost prediction of a construction project. Early cost prediction for a construction project is the basic approach to procure a project within a predefined budget. However, most of the projects routinely face the impact of cost overruns. Furthermore, conventional and manual cost computing techniques are hectic, time-consuming and error-prone. To deal with such challenges, soft computing techniques such as artificial neural networks (ANNs), fuzzy logic and genetic algorithms are applied in construction management. Each technique has its own constraints not only in terms of efficiency but also in terms of feasibility, practicability, reliability and environmental impacts. However, appropriate combination of the techniques improves the model owing to their inherent nature.\u0000\u0000\u0000Design/methodology/approach\u0000This paper proposes a hybrid model by combining machine learning (ML) techniques with ANN to accurately predict the cost of pile foundations. The parameters contributing toward the cost of pile foundations were collected from five different projects in India. Out of 180 collected data entries, 176 entries were finally used after data cleaning. About 70% of the final data were used for building the model and the remaining 30% were used for validation.\u0000\u0000\u0000Findings\u0000The proposed model is capable of predicting the pile foundation costs with an accuracy of 97.42%.\u0000\u0000\u0000Originality/value\u0000Although various cost estimation techniques are available, appropriate use and combination of various ML techniques aid in improving the prediction accuracy. The proposed model will be a value addition to cost estimation of pile foundations.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41770591","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Job crafting-job embeddedness linkage of construction professionals: moderating effect of career stages 建筑专业人员工作加工-工作嵌入联结:职业阶段的调节作用
IF 2.8
Journal of Engineering Design and Technology Pub Date : 2023-06-05 DOI: 10.1108/jedt-09-2022-0498
Mustafa AlMemari, Khalizani Khalid, Abdullah Osman
{"title":"Job crafting-job embeddedness linkage of construction professionals: moderating effect of career stages","authors":"Mustafa AlMemari, Khalizani Khalid, Abdullah Osman","doi":"10.1108/jedt-09-2022-0498","DOIUrl":"https://doi.org/10.1108/jedt-09-2022-0498","url":null,"abstract":"\u0000Purpose\u0000Construction managers must focus on effective job design to develop and harness employee talent and achieve organizational goals. Because psychological needs and key motivators vary by career stage, a differentiated employee value proposition is crucial for a firm’s retention strategy. This study aims to examine how job crafting (JC) affects job embeddedness (JE) at different career stages.\u0000\u0000\u0000Design/methodology/approach\u0000In this investigation, a quantitative methodology was used. In total, 272 construction industry professionals from 25 construction firms in Abu Dhabi, United Arab Emirates, provided the data. Through the use of structural equation modeling, hypotheses were evaluated.\u0000\u0000\u0000Findings\u0000The results show that JC enhances construction professionals’ JE (β = 0.60, p < 0.000). Moreover, the relationship between JC and JE is moderated by career stages. The impact of JC on JE is greater among longer tenured (late-career stages, β = 0.61, p < 0.000) than shorter tenured construction professionals (early-career stages, β = 0.60, p < 0.000 and mid-career stages, β = 0.58, p < 0.000).\u0000\u0000\u0000Originality/value\u0000Limited research shows how JC can improve JE. At the time of this research, there was no published work on JC and JE relationship in the construction industry. This research found that JC has a positive impact on JE and JC behavior applies at both individual and team levels. This could imply that construction professionals with longer organizational tenure are more likely to challenge the status quo and identify problems or opportunities for improvement, hence contributes to JE theory.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.8,"publicationDate":"2023-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44552207","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An analysis of BIM-related job requirements based on text mining in China 基于文本挖掘的中国bim相关岗位需求分析
Journal of Engineering Design and Technology Pub Date : 2023-05-31 DOI: 10.1108/jedt-03-2023-0094
Jiahao Liu, Xi Xu, Jing Liu
{"title":"An analysis of BIM-related job requirements based on text mining in China","authors":"Jiahao Liu, Xi Xu, Jing Liu","doi":"10.1108/jedt-03-2023-0094","DOIUrl":"https://doi.org/10.1108/jedt-03-2023-0094","url":null,"abstract":"Purpose Although building information modeling (BIM) has brought competitive advantages and many new jobs, the BIM-related job market is still confusing in China, which will undermine the adoption of BIM. This paper aims to show what kinds of BIM-related jobs are there in China, what employers require and whether all BIM engineers are the same kind. Design/methodology/approach A text mining approach, structural topic model, was used to process the job descriptions of 1,221 BIM-related online job advertisements in China, followed by a cluster analysis based on it. Findings First, 10 topics of requirements with the impact of experience and educational background to them were found, namely, rendering software, international project, design, management, personal quality, experience, modeling, relation and certificate. Then, six types were clustered, namely, BIM modeler, BIM application engineer, BIM consultant, BIM manager, BIM developer and BIM designer. Finally, different kinds of BIM engineers proved this title was an expediency leading to confusion. Originality/value This paper can provide a clear and insightful look into the confusing and unheeded BIM-related job market in China and might help to cope with the abuse of job titles. It could also benefit both employers and candidates in their recruitment for better matching.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"135394950","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信