WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)最新文献

筛选
英文 中文
Case study: simulation of the call center environment for comparing competing call routing technologies for business case ROI projection 案例研究:模拟呼叫中心环境,用于比较竞争呼叫路由技术,以实现业务案例ROI预测
K. Miller, V. Bapat
{"title":"Case study: simulation of the call center environment for comparing competing call routing technologies for business case ROI projection","authors":"K. Miller, V. Bapat","doi":"10.1109/WSC.1999.816912","DOIUrl":"https://doi.org/10.1109/WSC.1999.816912","url":null,"abstract":"The paper describes how simulation was used for business case benefits and return on investment (ROI) projection for the procurement and rollout of a new call routing technology to 25 call centers. With investment costs of about 17 million dollars and annual operating costs of about 8 million for the new technology, we needed to determine if the technology would provide enough cost savings and cost avoidance (through reduced trunk costs, increased agent productivity, and ability to service more calls) to warrant its nationwide implementation. We constructed a model of the existing call center environment consisting of 25 call centers, where calls were distributed to the sites based on a system of percentage allocation routing; for example, the telephone network provider directs calls to each site, based on the number of agents scheduled. We then modeled the same call system dynamics and intricacies under the new call routing system, where calls are distributed based on longest available agent. Subsequently, we conducted average day simulations with light and heavy volumes and other \"what if\" laboratory analyses and experiments to facilitate planning decisions required to be documented and substantiated in the business case.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"95 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121448178","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 14
Increasing the power and value of manufacturing simulation via collaboration with other analytical tools: a panel discussion 通过与其他分析工具的协作来增加制造仿真的能力和价值:小组讨论
O. Ulgen, G. Coffman, M. Rohrer, J. Shore, D. Sly, D. Wood
{"title":"Increasing the power and value of manufacturing simulation via collaboration with other analytical tools: a panel discussion","authors":"O. Ulgen, G. Coffman, M. Rohrer, J. Shore, D. Sly, D. Wood","doi":"10.1109/WSC.1999.823212","DOIUrl":"https://doi.org/10.1109/WSC.1999.823212","url":null,"abstract":"The objective of this panel session is to describe how and when manufacturing simulation practitioners should add to the value of projects by interfacing simulation analyses with other analyses such as optimization, layout/material flow, scheduling, robotic, and queuing. The panelists will discuss how each analytical tool adds value to the discrete-event manufacturing simulation, when in the life cycle of a project it should be brought in, what are the main advantages and disadvantages of bringing in the additional tools, managing and selling collaborative analyses projects, and training requirements for collaborative analyses.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"60 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115746409","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 11
The nexus of simulation with command and control: what each community can offer the other 模拟与命令和控制的联系:每个社区可以为其他社区提供什么
W.H. Lunceford
{"title":"The nexus of simulation with command and control: what each community can offer the other","authors":"W.H. Lunceford","doi":"10.1109/WSC.1999.816815","DOIUrl":"https://doi.org/10.1109/WSC.1999.816815","url":null,"abstract":"Summary form only given, as follows. Along with the expansion of core simulation technology over the past few years there has also been an expansion in both the number of people in nonsimulation-oriented communities that are \"simulation-aware\" and the ability of the this technology to support new fields of endeavor beyond the well-recognized ones of training and requirements analysis. During this same period, the command-and-control world has been exploring ways to address functionality requirements - such as automated decision support-for their next-generation systems. The situation we are in now is that both communities have people, technology and innovation that can be shared with the other. Unfortunately, the cultural phenomenon of organizational stovepiping, combined with the fact that-especially within the command and control world-the operational requirements are not well-understood, has made it difficult to merge the simulation and command-and-control communities. This paper addresses how each community could help the other achieve their respective next-generation operational goals with the hope of starting a common dialog that will allow the cross-fertilization of ideas.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132475568","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
OOTW impact analysis [military simulation] OOTW冲击分析[军事模拟]
D. Hartley, R. E. Bell, S. Packard
{"title":"OOTW impact analysis [military simulation]","authors":"D. Hartley, R. E. Bell, S. Packard","doi":"10.1109/WSC.1999.816820","DOIUrl":"https://doi.org/10.1109/WSC.1999.816820","url":null,"abstract":"The conduct of Operations Other Than War (OOTWs) has become an extremely important part of the US military's responsibility since the end of the Cold War. The factors that influence success and failure in OOTWs are economic, political, sociological, cultural, and psychological factors more often than they are military factors. The paper explores the need for impact analysis support tools, provides a description of the required elements of such tools, and recommends a formal process for creating OOTW impact analysis tools.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"68 6","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114037673","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Database oriented modeling with simulation microfunctions 具有仿真微函数的面向数据库的建模
T. Wiedemann
{"title":"Database oriented modeling with simulation microfunctions","authors":"T. Wiedemann","doi":"10.1109/WSC.1999.823138","DOIUrl":"https://doi.org/10.1109/WSC.1999.823138","url":null,"abstract":"This paper presents an approach towards building a flexible modeling and simulation environment with database technologies. The main problem of defining complex systems by component based simulation systems is solved by a set of predefined microfunctions, similar to modern microprocessor architectures. The execution order and additional parameters are also stored in a database.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132349488","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A model of a 300 mm wafer fabrication line 300毫米晶圆生产线模型
P. Campbell, D. Rohan, E. MacNair
{"title":"A model of a 300 mm wafer fabrication line","authors":"P. Campbell, D. Rohan, E. MacNair","doi":"10.1109/WSC.1999.823305","DOIUrl":"https://doi.org/10.1109/WSC.1999.823305","url":null,"abstract":"Semiconductor factories are very expensive to build and operate. It is critical to understand how to design and operate them efficiently. We describe a simulation model of a planned 300-mm wafer fabrication line that we are using to make strategic decisions related to the factory.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127603315","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Multitrajectory simulation performance for varying scenario sizes [combat simulation] 不同场景规模的多弹道仿真性能[战斗仿真]
J. B. Gilmer, F. J. Sullivan
{"title":"Multitrajectory simulation performance for varying scenario sizes [combat simulation]","authors":"J. B. Gilmer, F. J. Sullivan","doi":"10.1109/WSC.1999.816832","DOIUrl":"https://doi.org/10.1109/WSC.1999.816832","url":null,"abstract":"Multitrajectory simulation allows random events in a simulation to generate multiple trajectories, a technique called \"splitting\", with explicit management of the set of trajectories. The goal is to gain a better understanding of the possible outcome set of the simulation and scenario. This has been applied to a prototype combat simulation, called \"Eaglet\", which was designed to have similar, but simpler, representations of the features of the \"Eagle\" simulation used for Army analyses. The study compared the number of multitrajectory simulation trajectories with numbers of stochastic replications in order to experimentally determining the rate of convergence to a definitive outcome set. The definitive set was determined using very large numbers of replications to develop a plot of loss-exchange ratio vs. the losses of one side. This was repeated with scenarios of from 40 to 320 units. While the multitrajectory technique gave superior results in general, as expected, there were some anomalies, particularly in the smallest scenario, that illustrate limitations of the technique and the assessment method used.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"148 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116544464","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
The use of simulation for process improvement in a cancer treatment center 在癌症治疗中心使用模拟进行流程改进
J. Sepúlveda, W. Thompson, F. Baesler, M. I. Alvarez, L.E. Cahoon
{"title":"The use of simulation for process improvement in a cancer treatment center","authors":"J. Sepúlveda, W. Thompson, F. Baesler, M. I. Alvarez, L.E. Cahoon","doi":"10.1109/WSC.1999.816890","DOIUrl":"https://doi.org/10.1109/WSC.1999.816890","url":null,"abstract":"This work addresses experience with a simulation model of a full service cancer treatment center. The objective was to analyze patient flow throughout the unit, evaluate the impact of alternative floor layouts, using different scheduling options and to analyze resources and patient flow requirements of a new building. The simulation model provided strong justification to relocate the center's laboratory and pharmacy as well as identifying changes in scheduling procedures that would allow a 30% increase in patient throughput with the same resources. The new building analysis identified a waiting room area that was too small for the increased patient flow.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115682966","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 68
Process and material handling models integration 工艺和物料处理模型集成
M. Norman, D. Tinsley, J. Barksdale, O. Wiersholm, P. Campbell, E. MacNair
{"title":"Process and material handling models integration","authors":"M. Norman, D. Tinsley, J. Barksdale, O. Wiersholm, P. Campbell, E. MacNair","doi":"10.1109/WSC.1999.816851","DOIUrl":"https://doi.org/10.1109/WSC.1999.816851","url":null,"abstract":"AutoSimulations has developed and applied a new method of integrating separate models of manufacturing process and material handling systems that exploits the strengths of two different products to provide users with maximum productivity and flexibility. As applied to semiconductor wafer fabrication facilities in the examples presented, this approach replaces the traditional method of building a single large, complex model of the entire scope of operations. Two case studies illustrate the technique and demonstrate the benefits of this new modeling architecture. IBM recently contracted with AutoSimulations to upgrade an existing model of their prototype 300 mm wafer fabrication facility. The existing model was developed in 1997 using the AutoSched/sup TM/ application, a long-time manufacturing system modeling product from AutoSimulations. It incorporated various material handling systems and manufacturing processes within one model-the standard practice for modeling wafer fabrication facilities with the intent of understanding material handling requirements and process requirements for varying order demand. In 1998, Dominion Semiconductor, a subsidiary of IBM and Toshiba, contracted with AutoSimulations to develop a coordinated tool set to meet a diverse set of requirements to support their fabrication of 200 mm wafers. The manufacturing support group needed assistance in planning process capacity, in planning future staffing requirements, and in analysis of cost reduction initiatives and production scheduling, including lot start and dispatch policies.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116749353","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Quasi-Monte Carlo via linear shift-register sequences 准蒙特卡罗通过线性移位寄存器序列
P. L'Ecuyer, C. Lemieux
{"title":"Quasi-Monte Carlo via linear shift-register sequences","authors":"P. L'Ecuyer, C. Lemieux","doi":"10.1109/WSC.1999.823145","DOIUrl":"https://doi.org/10.1109/WSC.1999.823145","url":null,"abstract":"Linear recurrences modulo 2 with long periods have been widely used for constructing (pseudo)random number generators. We use them for quasi-Monte Carlo integration over the unit hypercube. Any stochastic simulation fits this framework. The idea is to choose a recurrence with a short period length and to estimate the integral by the average value of the integrand over all vectors of successive output values produced by the small generator. We examine randomizations of this scheme, discuss criteria for selecting the parameters, and provide examples. This approach can be viewed as a polynomial version of lattice rules.","PeriodicalId":440806,"journal":{"name":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1999-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121227750","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 24
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书