{"title":"Breaking down barriers","authors":"A. Patient, M. Yuill","doi":"10.1016/s0140-6736(45)91288-8","DOIUrl":"https://doi.org/10.1016/s0140-6736(45)91288-8","url":null,"abstract":"","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"11 1","pages":"25-27"},"PeriodicalIF":0.0,"publicationDate":"2019-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129197156","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Threats and opportunities","authors":"Regnerus Coops, Peter Witberg","doi":"10.1201/9780849333231.ch6","DOIUrl":"https://doi.org/10.1201/9780849333231.ch6","url":null,"abstract":"The way in which utilities approach asset management is changing in response to the emergence of liberalized and competitire markets. Capgemini argues that this will require utilities to shift from engineering to an integrated business focus in order to achieve the right balance.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2005-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115294950","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Start-up challenge","authors":"S. Akhtar","doi":"10.1108/02580540210793310","DOIUrl":"https://doi.org/10.1108/02580540210793310","url":null,"abstract":"Start-up during 2002 of the Gebze, Adapazari and Izmir combined cycle power plants in Turkey revealed over-pressure at the boiler feedwater pump discharge. The over-pressure was caused by grid over-frequency and cold water used at start-up and required an innovative solution to ensure that the plants could continue to operate reliably.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"133 3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128663596","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Trials and tribulations","authors":"R. Galli, G. Gennari, P. Grima","doi":"10.2307/j.ctv14rms2d.12","DOIUrl":"https://doi.org/10.2307/j.ctv14rms2d.12","url":null,"abstract":"Le projet Ralco comprend la construction d'un barrage et d'une centrale hydro-electrique, sur la riviere Bio-Bio, au Chili. Initie en 1995, ce projet a ete tres conteste et a pris du retard a la realisation. L'historique de cette contestation, les obstacles qui ont du etre surmontes et les differents acteurs partie prenante de ce projet sont rappeles.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"1075 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132882249","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Making the Connection:","authors":"A. Mukherjee","doi":"10.2307/j.ctv16pn3ft.12","DOIUrl":"https://doi.org/10.2307/j.ctv16pn3ft.12","url":null,"abstract":"India's East-South interconnector project is a key link in the country's plan to have a fully interconnected national grid by 2012 Completed ahead of schedule in 2003, this 2000 MW project is the largest power transmission project in India.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133301172","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"A failed experiment","authors":"Siân E. Green","doi":"10.1128/9781555819590.ch24","DOIUrl":"https://doi.org/10.1128/9781555819590.ch24","url":null,"abstract":"Analyse de l'experience de dereglementation de l'industrie electrique en Californie, au cours de l'annee 2000.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133779127","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"A competitive position","authors":"Siân E. Green","doi":"10.4135/9781452229805.n133","DOIUrl":"https://doi.org/10.4135/9781452229805.n133","url":null,"abstract":"With efficiency and environmental performance high on the agenda for utilities and power generators, and with a growing demand for distributed generation solutions, the small gas turbine market is a competitive one. Responding to these changing market demands, Rolls-Royce has updated its Trent 60 package, and will see the first units enter operation in 2006.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"12 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114328341","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Learning the trade","authors":"T. Fens, Berend Olde Rikkert","doi":"10.2307/j.ctt20060f1.5","DOIUrl":"https://doi.org/10.2307/j.ctt20060f1.5","url":null,"abstract":"As dust begins to settle after the birth of the EU's emissions trading scheme, the effects on the market are becoming clearer One Dutch utility has taken steps to ensure it is ready to reap rewards from the unfolding potential.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130305444","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Taking the bus","authors":"B. Brownlee","doi":"10.2307/j.ctv102bdfd.9","DOIUrl":"https://doi.org/10.2307/j.ctv102bdfd.9","url":null,"abstract":"New coal fired plants are poised to benefit from the adoption of advanced automation and digital bus-based technologies.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"71 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115361484","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}