考验和磨难

R. Galli, G. Gennari, P. Grima
{"title":"考验和磨难","authors":"R. Galli, G. Gennari, P. Grima","doi":"10.2307/j.ctv14rms2d.12","DOIUrl":null,"url":null,"abstract":"Le projet Ralco comprend la construction d'un barrage et d'une centrale hydro-electrique, sur la riviere Bio-Bio, au Chili. Initie en 1995, ce projet a ete tres conteste et a pris du retard a la realisation. L'historique de cette contestation, les obstacles qui ont du etre surmontes et les differents acteurs partie prenante de ce projet sont rappeles.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"1075 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Trials and tribulations\",\"authors\":\"R. Galli, G. Gennari, P. Grima\",\"doi\":\"10.2307/j.ctv14rms2d.12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Le projet Ralco comprend la construction d'un barrage et d'une centrale hydro-electrique, sur la riviere Bio-Bio, au Chili. Initie en 1995, ce projet a ete tres conteste et a pris du retard a la realisation. L'historique de cette contestation, les obstacles qui ont du etre surmontes et les differents acteurs partie prenante de ce projet sont rappeles.\",\"PeriodicalId\":260015,\"journal\":{\"name\":\"Power engineering international\",\"volume\":\"1075 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Power engineering international\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2307/j.ctv14rms2d.12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power engineering international","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2307/j.ctv14rms2d.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Ralco项目包括在智利比奥比奥河上建造一座大坝和水力发电厂。该项目于1995年启动,受到了激烈的竞争,并推迟了实施。回顾了这一挑战的历史、必须克服的障碍以及参与该项目的不同参与者。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Trials and tribulations
Le projet Ralco comprend la construction d'un barrage et d'une centrale hydro-electrique, sur la riviere Bio-Bio, au Chili. Initie en 1995, ce projet a ete tres conteste et a pris du retard a la realisation. L'historique de cette contestation, les obstacles qui ont du etre surmontes et les differents acteurs partie prenante de ce projet sont rappeles.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信