Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings最新文献

筛选
英文 中文
Review of the potential role of electrokinetics technology in tailings dewatering and minerals recovery 电动力学技术在尾矿脱水和矿物回收中的潜在作用综述
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_17_KALUMBA
D. Kalumba, S. Mudenge
{"title":"Review of the potential role of electrokinetics technology in tailings dewatering and minerals recovery","authors":"D. Kalumba, S. Mudenge","doi":"10.36487/ACG_REP/1910_17_KALUMBA","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_17_KALUMBA","url":null,"abstract":"Water is employed as a cost-effective media of transporting tailings; a mixture of ground waste ore, water and chemicals used in metal extraction processes. Tailings are conveyed in pipelines from the plant to the tailings dam. From the dam, the water should be recycled back to the processing plant but herein lies the challenge. The hydraulic conductivity of fine-grained tailings is very low such that instead of draining, the water tends to accumulate in the dam. Not only does this led to pore water pressure build up which undermines the dam’s stability, but it also causes massive water losses by evaporation more so in arid regions. \u0000Dewatering of tailings prior to disposal has emerged as a solution that can be used to conserve water by producing paste or thickened tailings. Thickened tailings have higher shear strength, lower volume and they reduce dam closure costs. Filtered tailings can also be used as underground backfill for mine cavities or transported with conveyor belts and trucks to a designated point. The main limitation is that the benefits of dewatering are mainly technical and they do not yield a direct financial return. Processes that increase mineral production are vital in mine operations. Apart from the residue of the targeted metal, most tailings contain base metals like copper, nickel and zinc. Some mines have already established systems to extract valuable minerals from tailings; these include DRDGold, Lonmin and Sibanye mines in South Africa. Dewatering systems are designed to be in close contact with tailings and if they can perform the dual function of recovering water while extracting metals, they would fully meet the demands of the mining industry. \u0000One of the most efficient techniques which can harness both dewatering and metal extraction is electrokinetics. Electrokinetics involves the application of an electrical current to induce the flow of water from the anode to the cathode in a process called electroosmosis. Electrokinetics also induces the migration of ions in a phenomenon termed electro migration. The metal cations precipitate at the cathode where they are collected and dried. This paper evaluates the viability of using an electrokinetic system to dewater and extract metals from tailings. Introducing a mineral extracting function could well be the key to increase the usage of tailings dewatering techniques by mines.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"57 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88610628","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Underground paste fill reticulation management of system flow-loss 地下膏体充填网管系统流损管理
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_41_GRIFFITHS
M. Griffiths
{"title":"Underground paste fill reticulation management of system flow-loss","authors":"M. Griffiths","doi":"10.36487/ACG_REP/1910_41_GRIFFITHS","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_41_GRIFFITHS","url":null,"abstract":"An underground paste fill system will inevitably experience a system flow-loss event during its operational life. In a flow-loss event, the underground reticulation design, flow-control hardware, instrumentation specification and system recovery methods can greatly impact the time taken to safely and effectively achieve a full system clearance and recommence backfilling activities. \u0000In addition, the learnings and methods discussed in this paper minimise the opportunity cost of using valuable underground work crew resources to rectify the blocked pipe work and the associated paste plant downtime. This deficit of paste filling will further impact the mining production schedule by increasing mining activity interaction and disrupting the extraction sequence. Direct costs of a blockage may include piping replacement and work crew labour as well as an increased risk of injury and equipment damage during a time-critical activity. \u0000The management of a flow-loss event must consider each of the following three flow-loss conditions experienced: \u0000A case study (Scenario 1) is presented to demonstrate the management of a flow-loss event, which includes system blockage and stalling due to insufficient available head pressure being overcome by system segmentation. Segmentation highlights the advantages of the ability to carry out safe and effective system isolation from underground in a time-critical situation. \u0000Reticulation failure response is also discussed in this paper, with an explanation of the recovery method and the requirement of an adaptive approach as the flow-loss condition can transition from one type to another during the recovery effort.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"55 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77215613","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Rehabilitation of the Hillendale Mine’s residue storage facility 修复希伦代尔矿的残留物储存设施
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_35_BEUKES
J. Beukes, M. Vlok, F. Khosa
{"title":"Rehabilitation of the Hillendale Mine’s residue storage facility","authors":"J. Beukes, M. Vlok, F. Khosa","doi":"10.36487/ACG_REP/1910_35_BEUKES","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_35_BEUKES","url":null,"abstract":"The Tronox KZN Sands Hillendale Mine is located in Zululand – close to Richards Bay. Mining activities commenced in 2001 and the mine’s production came to an end in 2013. At Hillendale, dunes with a high fines content were mined to recover the valuable minerals of ilmenite Zircon and rutile. The fine fraction consisting mainly of fine clay minerals was managed by storage in a residue storage facility (RSF). Following the cessation of mining activities several actions have been implemented towards achieving mine closure. This paper will firstly give some basic background on the operation of the residue facility as part of the Hillendale Mine. Secondly the paper will focus on mine closure activities planned and implemented at the RSF. The learnings and experience gained from the Hillendale Mine will form the basis of future closure plans for RSFs operated as part of Tronox’s newly established mine at Fairbreeze.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"15 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88098157","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Mine fines dewatering trials using amphibious vehicles at the Tronox KZN Sands Fairbreeze Mine 在Tronox KZN Sands Fairbreeze矿山,使用两栖车辆进行矿粉脱水试验
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_36_COCKS
Bld Cocks
{"title":"Mine fines dewatering trials using amphibious vehicles at the Tronox KZN Sands Fairbreeze Mine","authors":"Bld Cocks","doi":"10.36487/ACG_REP/1910_36_COCKS","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_36_COCKS","url":null,"abstract":"The Tronox KZN Sands Fairbreeze Mine is located in Zululand, south of Mtunzini on the east coast of South Africa. Mining activities commenced in 2015 and the declared life of the mine is 15 years. \u0000Fairbreeze Mine is beneficiating an orebody that is part of the Berea Red dune system and the fines content is known to approach 30% in some areas of the deposit. The definition of ‘fines’ in the mineral sands industry is classified as any particle passing 75 µm and consists predominantly of clays and some traces of silica particles of silt size. \u0000Historically, the mining industry has made use of sub-aerial deposition to dewater fines that do not drain freely. The only tools available to the processing facilities using the sub-aerial deposition dewatering method, has been: \u0000In order to minimise the risk and to reduce the sterilisation of large tracts of land, mining companies are being forced to consider alternative dewatering techniques. \u0000The use of amphibious vehicles, or mud-crawlers, is a well-documented alternative in the alumina industry but little is known about the performance of amphibious scrollers on mineral sands fines residue. This paper investigates the effects of mechanical scrolling performed by mud-crawlers on the dewatering and the ultimate final dry density of Fairbreeze fines. The investigation looks at ways that mud-crawlers can be applied as a financially viable alternative to sub-aerial deposition.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"5 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83680419","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Conversion of a conventional tailings storage facility to a perimeter discharge central decant configuration using Nalco WaterShed polymer 将传统的尾矿储存设施转换为使用纳尔科分水岭聚合物的周边排放中心滗水器配置
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_21_GIBBS
F. Verdoorn, K. Gibbs
{"title":"Conversion of a conventional tailings storage facility to a perimeter discharge central decant configuration using Nalco WaterShed polymer","authors":"F. Verdoorn, K. Gibbs","doi":"10.36487/ACG_REP/1910_21_GIBBS","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_21_GIBBS","url":null,"abstract":"In 2012, SIMEC Mining commenced a detailed investigation into changing the way the magnetite tailings storage facility (Mag TSF) operates at the South Middleback Ranges (SMR) to increase water recovery and provide a sustainable cost-base for tailings management. Changes were also necessary to support the Magnetite Expansion Project (MEP) that was destined to be commissioned in October 2013. A feasibility study was performed with Golder Associates to understand the technical and commercial influences and provide a capital estimate for several options. The selected option from the study was a redesign of the current dual discharge TSF to a perimeter discharge, central decant (PDCD) design. \u0000Application of Nalco WaterShed polymer at the Big Baron Pit (Verdoornet al. 2018) revealed the technology would greatly assist in the successful conversion of the TSF to a PDCD configuration. Expectation was high that WaterShed polymer treatment would allow greater beach angle control, improved water recovery, and a reduction in surface water pooling across the TSF with water pooling concentrated around the central decant allowing for efficient removal prior to loss via evaporation or seepage. \u0000A conceptual design for the polymer tailings dewatering application was developed in collaboration with Nalco Water and dosing commenced in October 2013. Due to unknown risks associated with dewatering magnetite tailings, the project was split into two stages, namely, phase 1: a proof of concept trial to establish the applicability of Watershed on the magnetite tailings prior to commissioning of MEP; and phase 2: fully operationalise the PDCD configuration. \u0000Golder was engaged to develop a life-of-mine plan for the TSF at SMR that could be safely operated to a planned final height of RL 199 m. Throughout 2013 and 2014, design and construction occurred to convert the Mag TSF to a PDCD facility. A master plan was developed to manage tailings storage for five years from March 2014, referred to as the ‘First 5 Year Plan’. This involved six wall raises that would eventually fill the three voids near the western embankment and bring the height of the TSF to RL 172 m. \u0000The civil concept selected was based on an alternatives assessment that presented three options. SIMEC Mining chose the lowest cost approach of filling the voids with WaterShed polymer treated tailings to provide a base for 3 m wall raises upstream. Strict deposition and water recovery models were followed to ensure sufficient dewatering and the subsequent drying of the tailings layers. There was also extensive test work completed prior to each of the individual embankment raises to ensure that the dewatered tailings had the appropriate density and strength properties to support the raises before commencing with the lifts. \u0000During the first five years of operation, water recovery was around 60% and the volume utilisation was in line with the deposition model. The high percentage of water recovered enabled the proc","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"46 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88494539","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Dareh Alou thickened tailings management scheme: design considerations Dareh Alou浓密尾砂管理方案:设计注意事项
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_03_ROSHDIEH
A. Roshdieh, K. Seddon, M. Mohebbi, K. Shakeri, M. Nosrati
{"title":"Dareh Alou thickened tailings management scheme: design considerations","authors":"A. Roshdieh, K. Seddon, M. Mohebbi, K. Shakeri, M. Nosrati","doi":"10.36487/ACG_REP/1910_03_ROSHDIEH","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_03_ROSHDIEH","url":null,"abstract":"This paper presents a case study on the design of a thickened tailings storage facility (TSF) for a proposed open pit copper mine at Dareh Alou, Iran. \u0000Dareh Alou mine is a new copper mine owned by National Iranian Copper Company (NICICO). It is located in the Kerman Province of the Islamic Republic of Iran. The nominal production rate is 7 Mtpa for a life-of-mine (LOM) of 25 years. Planning was undertaken for the accommodation of a total of 175 Mt of tailings. \u0000The Dareh Alou mine site is located on a sloping side of a valley that is surrounded by hills, grading up to steep mountainous terrain. Since this is a greenfield project the location of the concentrator was selected in conjunction with the tailings deposition options study. Five concentrator locations with various ore transportation options have been investigated together with the tailings and water management study. The result of the study indicated that the best concentrator plant location was at RL 3050 m at approximately 2.5 km from the preferred TSF location. \u0000Various tailings and water management options were evaluated, including high rate, high density/high compression, and paste thickeners. These dewatering options were studied alongside the combinations of various TSF and thickener locations. \u0000The outcome of the options study indicates that if the price of make-up water is not included in the analyses, the preferred option is utilisation of high rate thickeners. However, after inclusion of make-up water at a rate of USD 1/m3, the preferred option would be the utilisation of high density/high compression thickeners. In this case, the distance between the concentrator and the TSF is such that transportation of un-thickened tailings to thickeners located adjacent to the TSF is the most efficient option. Also, thickening the tailings will provide benefits in reducing the embankment construction cost even though relatively large embankments will be required to close off the valley site.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"54 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80179650","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Tailings dam safety: going beyond technical 尾矿坝安全:超越技术
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_0.03_PRISCU
C. Priscu
{"title":"Tailings dam safety: going beyond technical","authors":"C. Priscu","doi":"10.36487/ACG_REP/1910_0.03_PRISCU","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_0.03_PRISCU","url":null,"abstract":"The criticality of effective stewardship of tailings facilities has recently gained increasing recognition and triggered much effort on the part of the many mining companies across the world. The world of mining, and in particular the mine waste management practice area, is changing dramatically after the recent tragic events following the tailings dam failure in Brazil in January 2019. Investors, communities, shareholders, nongovernmental organisations, regulators and insurance companies are looking to the tailings storage facilities and their management through a completely different lens; one that focuses on the need for implementing best available practices (BAP), best applicable technologies (BAT), and how the zero repeats commitment of the mining industry will be achieved. \u0000This presentation outlines Anglo American’s approach to building a world-class tailings storage facilities practice, which includes a number of key must-have ingredients: \u0000A solid and strict governance framework for the oversight of a large portfolio of tailings and water dams in a global environment, where stringent minimum technical standards are implemented with non-negotiable requirements. \u0000The need for people with the right set of skills, competencies, and technical knowledge, but also the mindset on safety and the ‘do the right thing’ approach that needs to be part of their DNA. \u0000The critical controls definition and implementation to ensure each facility is planned, built and managed safely to design requirements, minimising the presence of the ‘surprise’ effect, and in particular the minimisation of the human error element factor. \u0000Pushing the boundaries of technology and innovation in tailings production, deposition, and management of such facilities. From minimising the tailings production, to high tech near \u0000real-time monitoring instrumentation and surveillance technologies, all are key ingredients in building a global success story. \u0000Implementing the Anglo American dam safety management program at a global level does not come without challenges. The presentation will discuss the strategy and share some of the success stories, as well as lessons learned along the Anglo American journey since 2014, when the company transformed its internal technical requirements, raising the bar to a whole new level.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"528 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81800277","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Online rheology monitoring of a thickener underflow 稠化剂底流的在线流变监测
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_37_CHRYSS
AG Chryss, A Monch, K Constanti-Carey
{"title":"Online rheology monitoring of a thickener underflow","authors":"AG Chryss, A Monch, K Constanti-Carey","doi":"10.36487/ACG_REP/1910_37_CHRYSS","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_37_CHRYSS","url":null,"abstract":"The perceived need for accurate and reliable methods of measuring suspension rheology in real time arises from the greater demands being placed on mineral processing operations. To extend mine life and reduce TSF footprint the adoption of finer grinds, higher solids concentration and high clay ores result in complex multiphase suspensions that need close monitoring to optimise thickener performance, pipeline transport and tailings deposition. Often the control of the processing or transport of these suspensions can be related to its rheology. However, due to the involved nature of rheological measurement for suspensions and the nuanced interpretation of data necessary to produce useful decisions, rheometry has only seen limited application in process monitoring. A robust unit that can measure, analyse and interpret the rheology of a process stream continuously and unattended is needed. The CSIRO has developed an online rheometer to address this problem. This paper describes the process prior to the deployment of the online rheometer to an Australian goldfield site, comparing online rheological measurement to benchmark laboratory values.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"48 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76154443","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Development of centrifugal slurry pumps in tailings disposal and comparison with positive displacement pumps 离心浆泵在尾矿处理中的发展及与容积泵的比较
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_39_CRAWFORD
J. Crawford, N. Bessett
{"title":"Development of centrifugal slurry pumps in tailings disposal and comparison with positive displacement pumps","authors":"J. Crawford, N. Bessett","doi":"10.36487/ACG_REP/1910_39_CRAWFORD","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_39_CRAWFORD","url":null,"abstract":"This paper covers FLSmidth KREBS® pump development, over the past 10 years, of an extensive range of highpressure centrifugal slurry pumps for multistage applications. The primary objective has been to produce safe, economical, energy efficient and maintenance friendly centrifugal slurry pumps to fulfil the expanding requirements of the mineral processing industries in the long distance transportation of tailings and mineral slurries. Two ranges of pumps have been developed, a double cased pump (based on the KREBS rubber lined slurryMAX™ XD pump) and an unlined white iron cased pump (based on the millMAX™ pump). \u0000The logic behind the development of the two pump ranges will be explained in depth covering the design and first article production, getting it right. The methodology of the hydraulic and structural criteria requirements that are considered during the pumps’ design are integrated with the use of computational fluid dynamics and finite element analysis to ensure that the pumps perform safely, reliably and with maximum efficiency. \u0000Application of the pumps to projected operating data is explained taking into consideration specific needs for flange and foundation loads, maintenance and condition monitoring. Consideration of slurry rheology and its implication on pumping performance is discussed. \u0000Cost comparison between actual field data and the theoretical positive displacement (PD) costs, as presented at the 21st International Seminar on Paste and Thickened Tailings, will be analysed in the Appendix.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"118 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81285293","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Selected extracts from South Africa’s environmental legislation: challenges with the management of gold tailings within the Witwatersrand gold fields and case studies 南非环境立法节选:威特沃特斯兰德金矿尾矿管理的挑战和案例研究
Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings Pub Date : 2019-05-08 DOI: 10.36487/ACG_REP/1910_0.04_LIEFFERINK
M. Liefferink
{"title":"Selected extracts from South Africa’s environmental legislation: challenges with the management of gold tailings within the Witwatersrand gold fields and case studies","authors":"M. Liefferink","doi":"10.36487/ACG_REP/1910_0.04_LIEFFERINK","DOIUrl":"https://doi.org/10.36487/ACG_REP/1910_0.04_LIEFFERINK","url":null,"abstract":"For most of its history, the mining industry in South Africa has not been subjected to comprehensive environmental regulation. In recent years, however, this has changed significantly, and the industry is now required to comply with a complex web of mining and environmental policy and legislation. \u0000Despite these regulatory advances, we still grapple with legacy issues, namely how to manage decades of environmental degradation, mining waste and long-term residual and latent impacts and how to equitably and fairly apportion duties, responsibilities and liabilities for the remediation of mining waste. \u0000An analysis of the Witwatersrand gold fields and the management of its uraniferous waste provides an excellent example of the complexity of these issues and lessons learnt.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":"11 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78988483","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信