Day 2 Thu, October 17, 2019最新文献

筛选
英文 中文
Real-Time Gas Influx Analysis and Control in Managed Pressure Drilling 控压钻井中实时气侵分析与控制
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198361-ms
A. Ilin, S. A. Rostami, K. Deshpande, O. Bukashkina
{"title":"Real-Time Gas Influx Analysis and Control in Managed Pressure Drilling","authors":"A. Ilin, S. A. Rostami, K. Deshpande, O. Bukashkina","doi":"10.2118/198361-ms","DOIUrl":"https://doi.org/10.2118/198361-ms","url":null,"abstract":"\u0000 Managed Pressure Drilling (MPD) usage have shown increasing demand in both offshore and onshore market especially for wells with narrow drilling margins. MPD due to its inherent ability to maintain desired constant bottom-hole pressure (BHP) is a clear choice when mitigating gas influx while drilling thus increasing safety and reducing non-productive time.\u0000 MPD removes pore / fracture pressure uncertainties by measuring the drilling window on real time. An enhanced hydraulics modeling that accounts for change in downhole conditions such as temperature, compressibility is key component for successful MPD operations to alter the surface back pressure (SBP) to maintain desired BHP. Aside from enhanced hydraulics model for BHP estimation, an accurate prediction of the gas influx propagation from the bit to the surface is critical for managing BHP dynamically while circulating influx out of annulus.\u0000 This work underscores development and usage of advanced multi-phase model to simulate gas influx transport and its effects on BHP during MPD operations. This work elucidates recent advances in the gas influx modeling, specifically single bubble model and kinematic two-phase model formulations are discussed in detail. The results of the single bubble model and two-phase model are compared using industry accepted software during gas influx control and circulation out of the well.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115058751","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Tapered Conductor Installation, A De Novo Optimization of Well Cost in Malaysia 锥形导体安装,马来西亚油井成本的全新优化
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198355-ms
F. S. Jamaldin, Jin Ming Lee, Iliyas M Dan, S. Arumugam, W. Lin, M. A. Omar, Anas M Sofian, Khairul Anwar Nasarudin, E. Damasena
{"title":"Tapered Conductor Installation, A De Novo Optimization of Well Cost in Malaysia","authors":"F. S. Jamaldin, Jin Ming Lee, Iliyas M Dan, S. Arumugam, W. Lin, M. A. Omar, Anas M Sofian, Khairul Anwar Nasarudin, E. Damasena","doi":"10.2118/198355-ms","DOIUrl":"https://doi.org/10.2118/198355-ms","url":null,"abstract":"\u0000 As oil price is getting more volatile these days, O&G operators had to think outside the box and be innovative in optimizing well design that can contribute to reduction in overall well cost. Conductor casing or drive pipe design, is an aspect that was put into spotlist to offer significant cost savings.\u0000 Conductor casing string typically uses same pipe size and thickness from surface to the planned setting depth. The design is based on estimated safe working structural load that it will encounter post-installation. One of the design load is from the vortex induced vibration (VIV), an important source of fatigue damage on conductor casing and it will directly affect conductor design ie. Grade, size and wall thickness. As VIV only occurs across pipes in water, the conductor casing joints inside the soil/below mudline are not affected by VIV fatigue damage. Hence, a tapered conductor design was introduced, by combining 2 different conductor wall thickness above and below mudline, based on the VIV exposures across the string.\u0000 This paper discusses on the challenges from design, planning to execution stage, in installing the tapered conductor to the setting depths seamlessly, without compromising HSE and well structure, by adopting fit-for-purpose design that contributes to effective cost optimization","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"49 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133765813","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Cement Evaluation with New Generation Ultrasonic Tool in Multiple Casings Increases Operational Efficiency in Tengiz Field, Kazakhstan 在哈萨克斯坦Tengiz油田,使用新一代超声工具对多套套管进行固井评价,提高了作业效率
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198349-ms
Zhalgasbek Ayazov, Yegor Se, A. Timonin
{"title":"Cement Evaluation with New Generation Ultrasonic Tool in Multiple Casings Increases Operational Efficiency in Tengiz Field, Kazakhstan","authors":"Zhalgasbek Ayazov, Yegor Se, A. Timonin","doi":"10.2118/198349-ms","DOIUrl":"https://doi.org/10.2118/198349-ms","url":null,"abstract":"\u0000 Cement evaluation with wireline tools across two different casing sizes is cost-effective and time efficient, but also quite challenging. The acquired data quality, especially across the larger casing, is often affected by the tool eccentricity and poor signal-to-noise ratio due to severe attenuation of acoustic signal by the mud. New ultrasonic technology is required to acquire reliable data for cement evaluation, necessary to assure long-term well integrity and guide operational decision-making processes during well execution.\u0000 In this paper, authors discussed several case studies, where high quality cement bond data was acquired across both 7-inch liner and 9.875-inch casing in 17.3 ppg oil-based mud in a single wireline descent by using new generation ultrasonic transducers.\u0000 Drilling campaign in the Tengiz Field was restarted in 2012 and reached its peak in 2019. The majority of the wells in the new drilling campaign utilized fit-for-purpose (FFP) well design with long production casing section, which consisted of 9.875-inch casing to the top of the Kungurian Salt and a 7-inch × 7.25-inch liner to the top of the reservoir. Both sections required cement evaluation to guide operational decision-making processes and comply with regulatory requirements.\u0000 In the past, cement quality evaluation was performed with standard ultrasonic tool, logged across 7-inch liner and 9.875-inch casing in a single descent. However, heavy mud weight (17.3 ppg) required to drill the salt section caused strong attenuation of the acoustic signal, resulting in poor log quality and unreliable cement evaluation.\u0000 The new ultrasonic tool with new generation transducers was successfully introduced in several wells. Comparison of results for cement evaluation with standard and new generation ultrasonic tools showed significant improvement in data quality for both 7-inch and 9.875-inch tubulars in wells filled with 17.3 ppg oil-based muds. Acquired data allowed confident evaluation of cement quality, as well as assessment of the cement contamination level and casing centricity. Reliable cement evaluation expedited operational decisions and clearly identified existing issues. The findings from the cement evaluation supported changes in the cementing design, which led to improved well reliability and integrity. Moreover, cement evaluation in two casings in a single descent saves ~12 hours of rig time per well, enabling significant efficiency gain and cost savings from ongoing drilling operations.\u0000 This paper summarizes TCO experience with the use of new generation transducers for cement evaluation, compares results between standard and new generation transducers and provides examples how acquired cement evaluation data impacted operational decisions and cementing practices.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129798431","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Evaluating Performance of Horizontal Wells Using Integrated Approach: Micro Seismic Monitoring, Geophysical Logging Using Conventional PLT and Marker-Based Production Logging 综合评价水平井性能:微地震监测、常规PLT地球物理测井和基于标记的生产测井
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198393-ms
Artem Basov, O. Bukov, V. Kuznetsov, D. Lazutkin, K. Saprykina, K. Ovchinnikov, A. Guryanov, A. Katashov, Igor Novikov
{"title":"Evaluating Performance of Horizontal Wells Using Integrated Approach: Micro Seismic Monitoring, Geophysical Logging Using Conventional PLT and Marker-Based Production Logging","authors":"Artem Basov, O. Bukov, V. Kuznetsov, D. Lazutkin, K. Saprykina, K. Ovchinnikov, A. Guryanov, A. Katashov, Igor Novikov","doi":"10.2118/198393-ms","DOIUrl":"https://doi.org/10.2118/198393-ms","url":null,"abstract":"\u0000 The resource potential of the Bazhenov formation is very highly estimated and chiefly involves kerogen reserves. However, currently the application of cutting-edge technologies providing efficient and economically viable industrial development is required.\u0000 The present article discloses the results of applying various horizontal well production logging technologies with multistage hydraulic fracturing in the Bazhenov formation deposits at one of the fields that has been developed since 2015.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"141 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128985135","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
The Results of the Pilot Works on Well Completion Technologies and Continuous Monitoring on the Example of Extremely Long Horizontal Wells of the Yu. Korchagin Field in the Caspian Sea 以豫皖特长水平井为例,完井技术与连续监测试点工作的结果里海Korchagin油田
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198390-ms
S. Shtun, A. Senkov, O. Abramenko, M. Nukhaev, I. Mukhametshin, Konstantin Naydenskiy, Artem Galimzyanov, E. Popova
{"title":"The Results of the Pilot Works on Well Completion Technologies and Continuous Monitoring on the Example of Extremely Long Horizontal Wells of the Yu. Korchagin Field in the Caspian Sea","authors":"S. Shtun, A. Senkov, O. Abramenko, M. Nukhaev, I. Mukhametshin, Konstantin Naydenskiy, Artem Galimzyanov, E. Popova","doi":"10.2118/198390-ms","DOIUrl":"https://doi.org/10.2118/198390-ms","url":null,"abstract":"\u0000 This paper presents the experience of LUKOIL-Nizhnevolzhskneft of implementation of various completion designs and continuous monitoring systems for extended-reach horizontal wells. The article describes the evolution from stand alone sand control screens and passive inflow control devices to the introduction of multi-zone advanced smart wells with inductive coupling. In addition, the work presents experience with fiber-optic distributed temperature measuring systems and chemical tracers.\u0000 Since 2010, There are a lot of advanced technologies for well completion and continuous monitoring has been introduced at the field named after Yu. Korchagin, including nozzle-based inflow control device (ICD), autonomous ICD, ICD with check valve, sliding couplings, multiposition couplings, interconnected sand screens, fiber optic systems, chemical tracers, hydraulic and electric smart wells. The application of some technologies turned out to be limited in the conditions of the field named after Yu. Korchagin, part of the technologies had limited implementation due to the long length of horizontal wells, and some technologies showed unique benefits and were recommended for further wide implementation.\u0000 Pilot projects of some technologies, as well as the use of various completion systems and continuous monitoring systems at the wells of the Yu. Korchagin field, allowed LUKOIL-Nizhnevolzhskneft not only to solve current operation problems, but also to select optimum technologies for usage in the following fields of Caspian shelf.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"61 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131034780","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Successful Application of Scale Squeeze Inhibitor in Tengiz Field 阻垢剂在Tengiz油田的成功应用
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198352-ms
Akylbek Kamispayev, E. Gazizova, Anton Skopich, Timur Munbayev, E. Neubauer, J. Clarke
{"title":"Successful Application of Scale Squeeze Inhibitor in Tengiz Field","authors":"Akylbek Kamispayev, E. Gazizova, Anton Skopich, Timur Munbayev, E. Neubauer, J. Clarke","doi":"10.2118/198352-ms","DOIUrl":"https://doi.org/10.2118/198352-ms","url":null,"abstract":"\u0000 The deposition of scale in the near-well formation and production string can result in a significant decrease in well productivity. Properly designed scale inhibitor squeezes can successfully prevent scale deposition and extend well performance. Even though most wells in the Tengiz field produce virtually water free oil (less than 1% watercut (WC)), inorganic scales have been observed in many of these wells. Frequent acid stimulations are required to maintain the optimum well performance.\u0000 An extensive research project was initiated to reduce the need for frequent acid treatments and still maintain well deliverability at sustained rates. To identify an effective scale inhibitor product, inhibitor-brine compatibility testing and dynamic tube-blocking performance testing were conducted. Field application of the selected inhibitor in both low and high rate wells has verified the effectiveness of the squeezes. Treatment with the scale inhibitor attained sustainable well productivity and delayed the need for subsequent acid stimulation treatments.\u0000 This paper will share the best practices in scale inhibitor design, inhibitor selection, identification of well candidates, the execution and post treatment surveillance stages. Case studies shown to illustrate the performance of scale inhibitor squeezes in Tengiz.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122097394","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Technological Opportunities to Increase Efficiency of Primary Recovery of High Viscous Oil 提高高稠油一次采收率的技术机遇
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198391-ms
A. Maksimenko, Eugene Sherstoboev, A. Osipenko, A. Akhmetov, R. Demenev
{"title":"Technological Opportunities to Increase Efficiency of Primary Recovery of High Viscous Oil","authors":"A. Maksimenko, Eugene Sherstoboev, A. Osipenko, A. Akhmetov, R. Demenev","doi":"10.2118/198391-ms","DOIUrl":"https://doi.org/10.2118/198391-ms","url":null,"abstract":"\u0000 Oil reservoir of East-Messoyakha field formed of continental deposition environment is characterized by large degree of uncertainty and heterogeneity, observed even at a short distance from the wells. Other complicating factors are high viscous oil (110 centipoise), the presence of an active aquifer and a gas cap. In conditions of high uncertainties, as the geological concept of the field becomes more complex, the involvement of hard-to-recover reserves could be achieved by development of well drilling and well completion. Initially, there was information about the reservoir as a homogeneous reservoir with a thick gas cap and rim of highly viscous oil: the optimal row horizontal well pattern was chosen after calculations. Further studying of the reservoir clarified the idea of reservoir compartmentalization: the reservoir was divided into 3 cyclothems. For draining the maximum oil-saturated thickness from all of cyclothems, it was decided to drill low-angle well through them. With the next update of the conceptual model, theory of multiple-contact reservoir was supposed: development scheme was changed to primary drilling on cyclothem C with parallel study of the overlying objects. Based on the accumulated experience, Workflow was made. By a number of geological and technical criterias the design of well and completion type could be chosen. Besides, development scheme of the neighbor field analog is planned using this workflow. Using workflow allows choosing the optimal development system for a field with large lateral and vertical variability. Implemented development approaches that have changed in the course of a change in the geological concept can serve as experience in the initial assessment of the analogue-field development scheme.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"48 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116750228","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Evolution of Drillstring Integrity Planning and Monitoring 钻柱完整性规划与监测的发展
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198397-ms
H. Suryadi, Robin Chen, V. Dolgushin
{"title":"Evolution of Drillstring Integrity Planning and Monitoring","authors":"H. Suryadi, Robin Chen, V. Dolgushin","doi":"10.2118/198397-ms","DOIUrl":"https://doi.org/10.2118/198397-ms","url":null,"abstract":"\u0000 Maintaining drillstring integrity is one of the main factors in a successful drilling operation. Drillstring integrity failure due to drillpipe fatigue remains to be a major problem. Drillpipe fatigue is caused by cyclic loading of bending (due to dogleg, sagging effect, buckling, and vibration) under rotation, which can lead to pipe twistoff. Collar or pipe off costs the operator millions of dollars to recover due to the cost of nonproductive times, fishing services, cement plugs, sidetracks, bottomhole assembly (BHA) lost in hole, and tool replacements. This failure can cause a significant impact to well cost.\u0000 For preventive measures, the drilling industry still relies on regular drillstring inspection using nondestructive tests (NDT) to find drillpipe cracks before they grow and the pipe completely twists off downhole or at the minimum, limits the drillstring component's usable time based on the local experience. Until now, there has not been any sensor or method available to monitor the fatigue level of the components. Hence, the industry has a real need for a new method to manage drillstring integrity. Fatigue calculation is a well-established concept and applied in many industries, but not yet fully used to manage drillstring integrity. Several recent digital technology advancements now allow us to implement a fatigue management workflow. Using finite element modeling allows for simulating a fatigue test of connections and portholes in the collar and generates a list of fatigue properties for drillstring components. This method eliminates the expensive and time-consuming fatigue material test. Then, using an integrated dynamic design and analysis platform, allows for simulating the drilling process and calculating the expected loads along the drillstring during the drilling operation. By combining both capabilities in a well planning application makes it possible to calculate expected fatigue life consumed automatically for every designed BHA, which can be connected to an inventory system to select the optimum drillstring components having sufficient fatigue life for the job of interest.\u0000 When implementing the application, a fatigue life monitoring workflow is also implemented that allows the engineer to monitor fatigue life consumption and take necessary action when it approaches the safety limit. Several technical solutions are required to implement this monitoring workflow, including improving computation speed with the modeling calculation on the cloud and high-performance computing parallel computations, leveraging bending load data from downhole bending sensors to validate and calibrate the modeling, and evaluating historical performance in the maintenance database to continuously refine the workflow.\u0000 This innovative workflow has been implemented to manage BHA integrity for medium-to-high dogleg severity (DLS). The approaches in managing fatigue life enable risk mitigation for BHA integrity, push kickoffs deeper, shorten the curve","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"12 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130404959","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Korolev Waterflood Pilot Completion Design for Water Supply and Injection Wells Korolev注水井注水试验完井设计
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198360-ms
R. Guest, Kymbat Dagistanova, A. Bekishev, T. Playton, Ray Macias, Micheal Fuller, M. Villegas
{"title":"Korolev Waterflood Pilot Completion Design for Water Supply and Injection Wells","authors":"R. Guest, Kymbat Dagistanova, A. Bekishev, T. Playton, Ray Macias, Micheal Fuller, M. Villegas","doi":"10.2118/198360-ms","DOIUrl":"https://doi.org/10.2118/198360-ms","url":null,"abstract":"\u0000 The Korolev Field is located in western Kazakhstan where a waterflood pilot is planned in a sour naturally fractured carbonate reservoir. The completion design of the water supply and injection wells plays a key role in the economic oil recovery in a waterflood. An improper design can result in high cost, poor sweep efficiency, and low injectivity. This paper provides guidelines and technical studies on the completion designs for the Korolev Waterflood Pilot.\u0000 The process for selecting the completion design consists of field data acquisition, analysis, and a completion alternatives assessment. Injection data are acquired from a short-term injection test in the targeted reservoir. Core and fluid samples are acquired from the water source aquifer. The data are analyzed to determine the completion design parameters and objectives for the wells. Finally, the completion alternatives are assessed by a cross functional team through a method which determines an optimum design based on the completion objectives.\u0000 A summary of the key conclusions for the Korolev Waterflood Pilot completion designs are:Short-term injection test confirmed viable injection rates, operating pressures and the need for conformance control liner to improve the injection profile.Sand control is required in the lower completion of water supply wells to control solids production. The fines migration study provided key design information which allowed optimization of the water treatment facility design.The water supply wells preferred completion design is an open hole gravel pack with wire wrap screen.The water injection wells preferred completion design is a conformance control liner with swell packers and sliding sleeves.\u0000 This assessment is an effective approach for unlocking the hydrocarbon potential in harsh wellbore conditions for a waterflood project. Cost discipline, simplification and cross-functional team work are the key elements which resulted project cost savings and partner alignment on the design and execution plan.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133364977","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Contemporary Technologies of Production Logging in Horizontal Wells as a Tool for Oil and Gas Fields Digitalization 现代水平井生产测井技术作为油气田数字化的工具
Day 2 Thu, October 17, 2019 Pub Date : 2019-10-16 DOI: 10.2118/198358-ms
M. Dulkarnaev, K. Ovchinnikov, Igor Novikov, E. Malyavko
{"title":"Contemporary Technologies of Production Logging in Horizontal Wells as a Tool for Oil and Gas Fields Digitalization","authors":"M. Dulkarnaev, K. Ovchinnikov, Igor Novikov, E. Malyavko","doi":"10.2118/198358-ms","DOIUrl":"https://doi.org/10.2118/198358-ms","url":null,"abstract":"\u0000 With the view to obtain reliable information in difficult geological conditions, the oil and gas industry is increasingly mastering Big Data to optimize technological processes and prevent accidents. Contemporary Big Data technologies, predictive analysis and machine-learning methods are changing the general image of many industries, and the oil and gas industry is no exception. New players are quickly emerging throughout the industry, and digitalization will affect the entire value chain in the oil and gas industry. Among the most promising segments for the transition to digital technologies are asset management and infrastructure facilities, field development, geophysical services, pipelines and processing.\u0000 The applied production logging system using markers allows for evaluating horizontal well (HW) production after multi-stage hydraulic fracturing (MFrac). In addition, the performance of each oil and water stage can also be evaluated. Based on this information control, users can leverage the technology to optimize their operations.\u0000 The technology is based on the use of marker-reporters with quantum dots placed in the polymer proppant coating or in the lower completion. Unlike conventional methods of horizontal well logging, this technology does not require any special means of equipment delivery and eliminates the risk of downhole equipment getting stuck or ambiguous data interpretation.\u0000 From 2017-2019, production logging technology using markers was applied in more than 30 horizontal wells in the fields of LUKOIL-Western Siberia LLC.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"166 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132464549","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书