Renat Sadyrbakiyev, E. Neubauer, Anton Skopich, O. Suleimenov, Abzal Aitzhanov
{"title":"Optimization of New Well Flowback Process","authors":"Renat Sadyrbakiyev, E. Neubauer, Anton Skopich, O. Suleimenov, Abzal Aitzhanov","doi":"10.2118/198394-ms","DOIUrl":"https://doi.org/10.2118/198394-ms","url":null,"abstract":"\u0000 New wells were initially cleaned-up directly to the Plant Facilities in Tengiz. The existing facilities were not designed to process well flowback fluids which can contain contaminants, emulsions and solids from drilling and completion fluids. Well flowback operations directly to the process facilities were causing plant upsets and a backlog of wells to be placed on production.\u0000 An MRM (Management of Residual Materials) spread was introduced in TCO (Tengizchevroil) in 2016 to clean-up new wells prior to performing a Plant flowback. The MRM unit utilizes an EverGreen Burner that performs fallout free and smokeless combustion of liquid hydrocarbons and residual well materials during well clean-ups.\u0000 Cleaning-up new wells using the MRM spread has significantly improved the number of successful Plant flowbacks per year, lessons learned in all phases have been captured and will be shared. However, MRM clean-ups did not always guarantee a problem-free Plant flowback since only qualitative methods were being used to determine when a well had been cleaned-up sufficiently to be routed to the Plant.\u0000 To improve the ability to determine a well's readiness for a Plant flowback, new quantitative methods were developed which include continuous sampling and gas-chromatography analysis along with compatibility tests.\u0000 This paper will share the best practices and challenges during MRM operations, research details, field trial and results that were achieved after optimization of the flowback process.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126395721","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Stanislav Novokshenov, Talgat Kosset, Nicholas Goura, Andrey Niverchuk, Lidia Letchikova, R. Nabiullin, A. Dadashev, Roman Nabokin
{"title":"Record-Breaking ERD Intelligent Completion System Installations in the North Caspian Sea: Challenges, Solutions and Multi-Disciplinary Approach","authors":"Stanislav Novokshenov, Talgat Kosset, Nicholas Goura, Andrey Niverchuk, Lidia Letchikova, R. Nabiullin, A. Dadashev, Roman Nabokin","doi":"10.2118/198362-ms","DOIUrl":"https://doi.org/10.2118/198362-ms","url":null,"abstract":"\u0000 In order to maximize oil recovery from shallow and thin reservoirs, Extended Reach (ER) producer and injector wells are becoming common in the Russian Sector of the Caspian Sea. In recent years, Korchagina wells have illustrated the difficulty of achieving effective production along lengthy reservoirs with traditional completion methods. The objective of this paper is to share practical experience gained during deployment of the most advanced Intelligent Completion Systems (ICS) in ER wells. The paper covers detailed analysis, challenges encountered, solutions implemented, and lessons-learned while completing multi-zone wells.\u0000 Hydraulically actuated ICS installations on the Korchagina field began in 2014 and continues to date, exceeding expectations for oil recovery. The paper discusses the deployment of recent record-breaking fully-electrically operated ICS in complex 3-D ER wells. Also, the paper covers the multi-disciplinary approach in optimizing drilling practices and techniques, which allowed landing of the longest 10¾\" horizontal production casing at 3873m on Well A, as well as the deployment of the longest combined 7\" × 5½\" liner with wire-wrapped screens and a total length of 3447m, and the longest intelligent completion system with a total length of 3083m, on Well B in the Caspian Sea. The previous world record was comfortably surpassed, with deployment of the ICS inside the 7\" liner to a depth of 5187m.\u0000 The detailed torque and drag (T&D) modelling of the liner and completion deployment was performed both at the planning and execution stages to ensure that there was sufficient surface weight and torque available. Proprietary Drilling Engineering software was used to derive the expected T&D, extract expected running conditions from previously executed wells, and predict potential challenges. It was also applied during the actual deployment with real-time data being extensively processed and analyzed. The slightly conservative modelling enabled identification of liner and ICS equipment that required modifications and helped to enhance running procedures. Further, the strategic approach to the placement of both swellable open hole packers for the liner, based on caliper and LWD data, and hydraulically-set inner-string isolation packers, is described.\u0000 The design and planning of the complete cycle of well construction, including deployment of the intelligent completion system, resulted in flawless completion of the wells with a successful field application and delivered a significant oil recovery increase on the field.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"165 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132792189","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Pore Pressure and Optimum Mud Weight Estimation Using Offset Wells in Bulla Daniz Field, Azerbaijan: Case Study","authors":"Mammad Mirzayev, Sevinj Gasimova, I. Gasimov","doi":"10.2118/198392-ms","DOIUrl":"https://doi.org/10.2118/198392-ms","url":null,"abstract":"\u0000 This case study presents a workflow of pore and fracturing pressure estimation and optimum mud weight selection in the wells that SOCAR AQS has drilled in Bulla Field. The optimum mud weight is calculated that incorporates statistical uncertainty inherent in its nature. The method employs Eaton equation to estimate pore pressure. Once pore pressure is estimated, we can calculate fracturing pressure using poisson ratio. We also compare pore pressure with the MDT formation pressure. Some anomalies in MDT formation pressures have been observed. The pressure measurements are highly scattered with a standard deviation of 2177 psi. We use bootstrapping for classification of MDT formation pressure. With the help of this technique, we were able to identify 3 distinct pressure ranges. We can create safe mud weight window for a field of interest, after having drilled a well. Compared with pore pressure, fracturing pressure has higher variance. The estimated median of optimum mud weight is around 14.2 ppg. When we look at offset well mud weights, we see that some wells were drilled with larger mud weights. That is, larger the weight, more money is spent.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124660070","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Elchin Akbarli, Elshan Ismayilov, Mohammad Masalmah
{"title":"The Heaviest and Longest 13 3/8 Full-String Casing Run in the Caspian Sea Region","authors":"Elchin Akbarli, Elshan Ismayilov, Mohammad Masalmah","doi":"10.2118/198348-ms","DOIUrl":"https://doi.org/10.2118/198348-ms","url":null,"abstract":"\u0000 The Bulla gas-condensate reservoir is a high pressure and deep water reservoir which is located in the north-west site of Baku Archipelago. In the past 2 years, two wells have been drilled to the VIII horizon and have been delivered successfully to the client. While drilling Well 2, a 13 3/8\" intermediate casing string was run to a depth of 5093m. It was registered as the heaviest and longest 13 3/8\" full-string casing in the Caspian Sea region. The objective of this paper is to share the experience of running this intermediate casing string in the Bulla reservoir and to discuss how improved well design programs can reduce the cost significantly and eliminate well-related risks associated with two-stage casing running operations.\u0000 It is very complicated and challenging to run long section casings in one run, especially when accompanied with swelling shale geological formations. Furthermore, this was accompanied by extremely heavyweight and increased equivalent circulating density (ECD) and drag. The operation was pushing the boundaries of previous drilling operations in the Caspian Sea. However, the drilling contractor company managed to overcome all these challenges by using detailed engineering calculations and selecting the most appropriate rig configuration in advance. It was achieved by using conventional casing running operations along with advanced technologies and by applying the best practices to prevent further possible problems.\u0000 A 13 3/8\" full-string casing was successfully run in the first well (Well 1) to a depth of 4938m, and in the second well (Well 2) to a depth of 5093m which were registered as new weight records for the Caspian Sea Region. Totally, 66 hours were needed to complete the running operations for the second Well. Usually, that casing string would be run in two stages using liner hanger and therefore, it would create technical complexity and difficulty. This technological complexity brings its own risks, compromises, and problems. By implementing engineering approaches, the two-stage casing running operation was substituted with a simpler and more effective design. The conventional casing running technique reduces the number of casing running operations, and the target depth was reached with the optimal and the most economic well construction design.\u0000 The results and conclusions of this paper will help well design engineers to simplify well construction, to use a smaller number of casing strings, and to reduce the risks and technological complexities associated with multi-stage casing running operations.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"22 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117156846","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
H. Suryadi, Tao Yu, Yuelin Shen, Jack Yang, Robin Chen, Wei Chen, Timur Khusaenov
{"title":"Development of Automatic BHA Directional Tendency Prediction Based on Drill-Ahead Modeling","authors":"H. Suryadi, Tao Yu, Yuelin Shen, Jack Yang, Robin Chen, Wei Chen, Timur Khusaenov","doi":"10.2118/198350-ms","DOIUrl":"https://doi.org/10.2118/198350-ms","url":null,"abstract":"\u0000 Directional drilling enables reaching farther and more difficult targets and improves well production through increased reservoir contact. Drilling and steering a well with a 3D trajectory path has become very common to achieve multiple objectives such as surface versus target location, well anti-collision on a crowded platform, completion and artificial lift needs, landing the reservoir section in a favorable direction, and maximizing the length of the lateral for optimum production.\u0000 Those objectives will be a challenge for the bottomhole assembly (BHA) design, including the bit and steering tool selection. The planned BHA must be able to drill the actual wellbore as per the planned trajectory path. It is important to avoid the failure that result from an inability to follow the planned trajectory because it will cause the nonproductive time to change the BHA; introduce additional tortuosity in the well, which can cause other problems; and risk not reaching the target hence requiring a sidetrack and redrilling. Therefore, BHA design and modeling the directional tendency capability become an important aspect in the planning phase.\u0000 Advances in digital technology and modeling allow us to provide a better tool to design the BHA. Many tendency modeling applications today still use the three-point contact theory. In actual conditions, well propagation is a complex transient process, affected by the bit, BHA, formation drilled, and drilling parameters used, and therefore three-point contact theory does not always give satisfactory prediction due to oversimplification. A new directional tendency prediction workflow was developed based on the finite element method. Finite element modeling allows us to calculate BHA deformation and forces. During drilling, the BHA is subjected to axial loading, torsional loading, wellbore contact force, gravity force, etc. All these forces will affect the BHA tendency. Simulating this in drill-ahead/propagation mode will give us a better prediction of BHA tendency and capture the transient well propagation behavior. This new method has been implemented as an automatic analysis agent in a drilling engineering software platform where every time the BHA design is created or changed, the tendency is automatically calculated, and the results are displayed as traffic lights based on comparison with the planned trajectory. The modeling relies on detailed models of various downhole equipment including steering tools and bit cutting interaction with the rock. The modeling results were validated with extensive field data and there was a good match between prediction and the actual results.\u0000 The computation was optimized by smart selection of well sections to conduct tendency analysis to evaluate if the BHA can deliver the designed trajectory with good confidence. Computation performance becomes important because the analysis workflow is implemented in an automated planning system where any change of the BHA or other well design","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"48 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116918064","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Dmitry Shestakov, M. Galiev, Ilshat Badrtdinov, V. Khamidullin, K. Ovchinnikov, E. Malyavko
{"title":"Application of Alternative Tracer Technologies for Production Logging","authors":"Dmitry Shestakov, M. Galiev, Ilshat Badrtdinov, V. Khamidullin, K. Ovchinnikov, E. Malyavko","doi":"10.2118/198396-ms","DOIUrl":"https://doi.org/10.2118/198396-ms","url":null,"abstract":"\u0000 The present article highlights a new approach to solving objectives aimed at efficient and rational development of oil and gas fields based on conducted production logging of Kogalymneftegaz TME, LUKOIL-Western Siberia LLC horizontal wells with the application of marker-based technology Quantum PLT.\u0000 Well logging technology using markers is based on the application of quantum marker-reporters precisely indicating oil and water inflows. The placement of markers in the well implies two alternative technological solutions – application of marked proppant during MFrac or application of downhole cassettes with markers installed in the lower completion of the horizontal well. The advantages of the technology involve no necessity of well shut-in during downhole operations and the possibility to obtain an unlimited number of analytical data for a long period of time.\u0000 Marker-based technologies produced by different manufacturers differ in physical principles of operation, as well as in the methods of markers placement in the well or reservoir. The results of two alternative marker-based systems application in one well are shown in this article. This approach allowed us to compare the results and to evaluate the advantages and disadvantages of these two technologies. The well was completed by MFrac with the possibility of further ports control with the application of coiled tubing service. Each of five well intervals was equipped with two marker cassettes fixed on both sides of the MFrac port. Three months later MFrac with pumping marked proppant was performed on the well.\u0000 As a result of the world-first field application of alternative marker-based systems, valuable analytical material was obtained on the quantitative analysis of various markers, the performance of different polymers, the stability of the markers allocation in the formation fluid. The data obtained confirmed the character of the marked proppant pack washing out with the formation fluid in comparison with cassettes with markers.\u0000 Moreover, the efficiency of conducted stimulation was evaluated, specific horizontal well inflow profile types were identified, the degree of the reservoir management system impact on the inflow profile was evaluated.\u0000 It has been demonstrated, that received analytical data based on horizontal wells production logging enable addressing the issues of field digitalization at a totally new level, including: –visualizing recovery in hydrodynamical models;–control of hydrocarbon recovery, also by improving water flooding efficiency and better management of injection wells;–efficient planning of well intervention and stimulation techniques;–optimization of horizontal sections length and the number of MFrac ports;–adapting the relevant geological and hydrodynamic models considering analytical data related to production logging data, etc.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115369703","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
F. Allan, D. Shepherd, A. Abbasov, J. Villinski, Reza Majidi, Ibrahimov Bagir
{"title":"Modelling of Fracture Geometry to Reduce the Risk of Intercepting Drilling Induced Fractures When Designing Sidetrack Trajectories","authors":"F. Allan, D. Shepherd, A. Abbasov, J. Villinski, Reza Majidi, Ibrahimov Bagir","doi":"10.2118/198384-ms","DOIUrl":"https://doi.org/10.2118/198384-ms","url":null,"abstract":"\u0000 During drilling operations fractures can be induced for a number of different reasons. When such a situation occurs it may be the favoured option to sidetrack from a shallower depth. In order to avoid intercepting the fracture it is useful to be able to model the plane of the fracture to inform sidetrack trajectory design. This paper will demonstrate an integrated approach to the design of such trajectories using the following techniques. Determination of maximum horizontal stress (SH) Orientation: This is obtained from a variety of sources. Caliper logs, Image logs, LWD image logs, and X-dipole sonic are all interpreted to provide the direction of SHmaxValidation of SHmax orientation: The above techniques are valid in near-vertical wells with deviation up to 20°. At higher deviations an understanding of the magnitude of SHmax is required. SHmax needs to be high enough to support the premise that breakout orientations still reflect the SHmax orientation at the higher deviations encountered. This validation is obtained by Geomechanical modelling which is calibrated to observations of breakout orientation and width.Fracture Detection: As well as knowing the orientation of the fracture it is important to identify the location and extent. The loss interval can be detected using time-lapse LWD resistivity. The as-drilled resistivity logs can be compared with repeat passes of resistivity logs post-losses to identify the loss interval. This can then be compared with the suspected loss zone from pre-drill pore pressure-fracture gradient (PPFG) model.Sidetrack Trajectory Design: Once the location and orientation of the fracture are known a model of the existing wellbore and fracture can be made. The trajectory of the sidetrack can be chosen to minimize the possibility of encountering the fracture and repeating the loss event.\u0000 Several examples will be presented where by following the proposed workflow sidetracks have been successfully drilled without issue.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130740371","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Numerical Simulation of Water Shut-Off for Heterogeneous Composite Oil Reservoirs","authors":"B. Suleimanov, K. Feyzullayev","doi":"10.2118/198388-ms","DOIUrl":"https://doi.org/10.2118/198388-ms","url":null,"abstract":"\u0000 The article proposes a mathematical model of water shut-off in a homogeneous and heterogeneous composite horizontal reservoir during the process of two-phase and three-component filtration of fluids with the consideration of capillary phenomena, residual resistance factor, and depth of the water shut-off agent penetration. According to the numerical calculations the residual resistance factor subsequent to water shut-off significantly influences efficiency of the process; moreover, at any stage of field development, significant oil recovery factor increase can be achieved by the residual resistance factor regulation.The depth of the water shut-off agent penetration and the time for its flushing-out are notably depend on the production zone permeability. The proposed model allowstochoosethe best timingfor water shut-off stimulation.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"88 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117088104","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
S. Shtun, M. Golenkin, A. Shtun, R. Golubtsov, V. Dovgopolyy, V. Kuzakov, A. Mityagin, N. Shaymardanov
{"title":"Using of Ultra Deep Reservoir Mapping and Formation Evaluation Technologies for Exploration of Northern Caspian Field by ERD Well","authors":"S. Shtun, M. Golenkin, A. Shtun, R. Golubtsov, V. Dovgopolyy, V. Kuzakov, A. Mityagin, N. Shaymardanov","doi":"10.2118/198356-ms","DOIUrl":"https://doi.org/10.2118/198356-ms","url":null,"abstract":"\u0000 The fields in the northern part of the Caspian Sea are characterized by a complex geological structure, which increases the level of uncertainty and risks associated with the planning and drilling of production wells. These problems are most evident in the development of fields with a thin oil rim, where the position of the profile of producing wells in relation to fluid contacts and fracture failures becomes critical for subsequent production. The experience of drilling in this region shows that even in the case of brown fields, there are areas with high structural and lithological uncertainties, which require additional geological study before making decisions on drilling of new production horizontal wells. If a significant area of the field needs to be further explored, drilling of a vertical or inclined pilot hole is often a common practice in the industry may not be informative in compartmentalized reservoirs. In such conditions, it seems reasonable to use extended horizontal wells as pilot holes, as it will allow to obtain information about the geological structure from a much larger area.\u0000 In the case of horizontal pilot hole drilling through the reservoir rocks within the oil-saturated zone, it is possible to determine the position of the top and bottom either by fluctuations of the trajectory between the reservoir boundaries or by application of ultra-deep electro-magnetic methods of geological section imaging.\u0000 The paper presents the method of drilling ERD horizontal pilot sections with the use of the latest technologies in local exploration of structural plan, which is well established for detailed improvement of the geological model, under the condition of its integration with seismic data, as well as for the estimation of residual reserves for planning new production horizontal wells.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115142096","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
S. Vasilyev, N. Boltunov, A. Shkaran, Elena Kirpichikova, R. Minakhmetova, V. Pimantyev, V. Nagimov, A. Zaripova
{"title":"Determination the Source of Sustained Annulus Pressure in High GOR Oil Wells by Using Acoustic Logging","authors":"S. Vasilyev, N. Boltunov, A. Shkaran, Elena Kirpichikova, R. Minakhmetova, V. Pimantyev, V. Nagimov, A. Zaripova","doi":"10.2118/198385-ms","DOIUrl":"https://doi.org/10.2118/198385-ms","url":null,"abstract":"\u0000 The sustained annular pressure (SAP) related issues are always actual and especially in oil and gas wells with high GOR. The presence of SAP may have a negative effect and cause numerous issues such as uncontrollable gas seepage to the surface (gryphons), well performance impairment, and increased risk of accident occurrence. To prevent accident occurrence risks increase it is necessary to perform specific downhole logging operations in order to identify SAP sources in wells located in a green oil and gas fields.\u0000 The precise SAP sources localization requires the use of highly sensitive logging techniques as measurable physical filed perturbations caused by completion integrity damages are small-scale. This paper describes the logging methodology of the spectral acoustic and high precision temperature techniques in combination with pulsed electromagnetic defectoscope. The key requirement of the successful operations using the above-mentioned techniques was to select and maintain special well operation conditions to ensure the optimal survey conditions for solving the particular issue without pulling out of the downhole equipment.","PeriodicalId":186772,"journal":{"name":"Day 2 Thu, October 17, 2019","volume":"120 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125129375","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}