INTAN Jurnal Penelitian Tambang最新文献

筛选
英文 中文
ANALISIS SENSITIVITAS di PT AE 分析PT AE中的敏感性
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i1.81
Klinton Butar-Butar, Juanita R. Horman
{"title":"ANALISIS SENSITIVITAS di PT AE","authors":"Klinton Butar-Butar, Juanita R. Horman","doi":"10.56139/intan.v4i1.81","DOIUrl":"https://doi.org/10.56139/intan.v4i1.81","url":null,"abstract":"PT. AE is engaged in the mining industry which in all its business activities requires a large investment. Therefore, it is necessary to conduct an investment analysis to see how the feasibility of this business using Net Present Value (NPV), Benefit-Cost Ratio (BCR), and Internal Rate Of Return (IRR) methods. Followed by sensitivity analysis to look at the company's financial condition in case of changes of ±2.50%, ±5.00%, and ±7.50% in revenue and cost of revenue. The results of the calculation of business feasibility analysis obtained a value of $618,450.563, BCR worth 1.698, and IRR worth 35.71%. This indicates that the efforts undertaken are worth carrying out. AE is more sensitive to -5.00% revenue-generating negative NPV, i.e. ($121,203.568), BCR at 0.881, and IRR of 2.69%. While the increase of cost of revenue was 7.50%, resulting in a negative NPV of ($178,160.513), BCR of 0.830, and IRR of -0.09%.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125372467","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ESTIMASI PRODUKSI PENAMBANGAN PADA ALAT MEKANIS MEREK KOMATSU SECARA TEORITIS 理论地说,关于KOMATSU机械设备的采矿生产预测
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i2.93
Fernando Pelipus Hehakaya, Y. G. Pangkung
{"title":"ESTIMASI PRODUKSI PENAMBANGAN PADA ALAT MEKANIS MEREK KOMATSU SECARA TEORITIS","authors":"Fernando Pelipus Hehakaya, Y. G. Pangkung","doi":"10.56139/intan.v4i2.93","DOIUrl":"https://doi.org/10.56139/intan.v4i2.93","url":null,"abstract":"This study resulted in theoretical production calculations from the handbook of Komatsu edition 30, which were calculated as coal activities, coal transportation, overburden stripping and overburden transportation. Theoretically production capacity for mechanical equipment production activities theoretically on hydraulic excavator PC 2000-8 for coal is 1,706.25 tons/hour while for overburden is 947.92 Bcm/hour, for PC 1250SP-8 1,086.75 tons/hour while overburden is 1,086.75 tons/hour. 603.75 Bcm/hour, for PC 600 overburden production obtained is 400.00 Bcm/hour while for coal is 720.00 Ton/hour and for PC 500LC-8R coal production is 630.00 Ton/hour while for overburden 350.00 Bcm/hour. The results of the calculations obtained for the HD 785-7 dump truck mechanical device for coal is 506.55 Ton/km while for overburden it is 281.42 Bcm/km, for HD 605-7R it is 332.78 Ton/km while overburden is 184.88 Bcm/km, for HD 407-7 overburden production obtained was 127.17 Bcm/km while for coal it was 228.91 Ton/km and for HD 325-7 coal production was 221.64 Ton/km while for overburden it was 123.13 Bcm/km.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"30 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124566221","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PENILAIAN KEBERHASILAN REKLMASI LAHAN BEKAS TAMBANG PADA BLOK AREA PARINGIN HIGH WALL 2 PT ADARO INDONESIA KALIMANTAN SELATAN
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v3i2.69
R. Sari, Y. G. Pangkung
{"title":"PENILAIAN KEBERHASILAN REKLMASI LAHAN BEKAS TAMBANG PADA BLOK AREA PARINGIN HIGH WALL 2 PT ADARO INDONESIA KALIMANTAN SELATAN","authors":"R. Sari, Y. G. Pangkung","doi":"10.56139/intan.v3i2.69","DOIUrl":"https://doi.org/10.56139/intan.v3i2.69","url":null,"abstract":"The consequences of a mining operation can be both positif and negatif impacts. The negative impact of mining occurs in the terms of environmental damage. To repair the damage that has an impact on the environment, reclamtion activities are carried out.  PT Adaro Indonesia is a company engaged in coal mining by implementing open pit mining using the Strip Mine method, one of which is located in the Paringin High Wall 2 area block, Balangan Regency, South Kalimantan Province. Evaluating the activities carried out in the ex-mining land reclamation process is necessary in order to determine the success rate of reclamation by providing an assessment of each reclamation activity that has been carried out based on the Regulation of the Minister of Energy and Mineral Resources of the Republic of Indonesia No. 26 of 2018 Annex VI No. 1872 K/30/MEM/2018, concerning Guuidelines for the Implementation of Reclamtion and post-mining and post-operations in Mineral and Coal Mining Business Activities. The results of the evaluation of the success rate of reclamation at PT Adaro Indonesia in 2019 in the Paringin High Wall 2 area block was 92% with an area of 37.95 ha was categorised as ‘good’, but there are several parameters that have been carrid out but have not been maximized","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133699696","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
GEOMETRI DAN FRAGMENTASI BATUAN MENGGUNAKAN METODE KUZ-RAM DI PT SEMEN BOSOWA MAROS PROVINSI SULAWESI SELATAN 岩石的几何和碎片使用来自南苏拉威西省的BOSOWA MAROS水泥的KUZ-RAM方法
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i1.72
Soesiadhy Palimbu, Y. G. Pangkung
{"title":"GEOMETRI DAN FRAGMENTASI BATUAN MENGGUNAKAN METODE KUZ-RAM DI PT SEMEN BOSOWA MAROS PROVINSI SULAWESI SELATAN","authors":"Soesiadhy Palimbu, Y. G. Pangkung","doi":"10.56139/intan.v4i1.72","DOIUrl":"https://doi.org/10.56139/intan.v4i1.72","url":null,"abstract":"Fragmentation of blasted rock aims to determine the average size and size distribution of blasted fragmentation. In fragmentation analysis, blasting geometry calculates to acquire the burden, spacing, stemming, and sub drilling values. The primary data needed in rock fragmentation resulting from blasting are rock mass weighting data, explosive data, and actual blasting data obtained from previous researchers. The results of the actual fragmentation analysis obtained are the actual average fragmentation size of 21,83 cm and the average size of fragmentation using the ICI-Explosives design of 27,22 cm. The actual fragmentation size distribution is 1,92 % 100 cm and 99,08 % 100 cm. Meanwhile, the results of the size distribution of the fragmentation resulting from blasting using the Kuz Ram method using the ICI – Explosives blasting geometry design will produce fragmentation sizes of 0,84 % 100 cm and 99,16% 100 cm.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"74 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115515206","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERHITUNGAN VOLUME BATUGAMPING MENGGUNAKAN METODE PENAMPANG 使用横截面方法进行刚化体积计算
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i2.85
Risky Y. Nainggolan, Juanita R. Horman
{"title":"PERHITUNGAN VOLUME BATUGAMPING MENGGUNAKAN METODE PENAMPANG","authors":"Risky Y. Nainggolan, Juanita R. Horman","doi":"10.56139/intan.v4i2.85","DOIUrl":"https://doi.org/10.56139/intan.v4i2.85","url":null,"abstract":"In the mining industry, it is very important to estimate the amount of mineral resources. This estimation aims to find out the volume of resources at the certain mining survey area. The estimation method used is the cross-section method, which is based on the rule of gradual changes and the rule of nearest point. The estimation using the rule of gradual changes shows that the total volume of limestone resources is 31,420 m³, and the volume of overburden is 27,572.6 m³. Meanwhile, the estimation using the rule of nearest point shows that the total limestone resource is 125,680 m³, and the overburden volume is 30,290 m³.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"87 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133563773","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISA DENSITAS DAN FREE WATER SEMEN PEMBORAN BERDASARKAN KONSENTRASI ADITIF BERBAHAN DASAR GLUKOSA 分析丹度和自由水二冲程水泥是基于葡萄糖的基础添加剂浓度
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i1.77
Hastowo Resesiyanto
{"title":"ANALISA DENSITAS DAN FREE WATER SEMEN PEMBORAN BERDASARKAN KONSENTRASI ADITIF BERBAHAN DASAR GLUKOSA","authors":"Hastowo Resesiyanto","doi":"10.56139/intan.v4i1.77","DOIUrl":"https://doi.org/10.56139/intan.v4i1.77","url":null,"abstract":"Cementing is the process of placing the cement suspension into the casing, then it will come out through the bottom of the casing shoe and will flow up into the space between the casing and the formation. In making cement suspension, the properties of the cement must be considered because it will affect the quality of the cement results. This study aims to examine changes in density and free water content of cement suspension as a result of the addition of glucose-based additives. Meanwhile, testing of other drilling cement properties was not carried out. Based on the results of the study showed that the more concentration of additives added to the cement suspension, the cement density value will increase. This will affect the hydrostatic pressure of the drilling cement in the borehole later. Meanwhile, for free water testing, values ​​tend to be stable ranging from 3 – 3.2 cc or 1.2 – 1.28% or below what is allowed.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"271 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116838052","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
GEOMETRI JALAN ANGKUT DAN JARI-JARI TIKUNGAN MENGGUNAKAN TEORI AASHTO PADA PT PRO INTERTECH INDONESIA KOTA SORONG PROVINSI PAPUA BARAT
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v3i2.60
Hamdan Tri Sanjaya, Ricardo O. M. Hutapea
{"title":"GEOMETRI JALAN ANGKUT DAN JARI-JARI TIKUNGAN MENGGUNAKAN TEORI AASHTO PADA PT PRO INTERTECH INDONESIA KOTA SORONG PROVINSI PAPUA BARAT","authors":"Hamdan Tri Sanjaya, Ricardo O. M. Hutapea","doi":"10.56139/intan.v3i2.60","DOIUrl":"https://doi.org/10.56139/intan.v3i2.60","url":null,"abstract":"Hauling road is an important aspect to support hauling activities in a mining operation. Better hauling road conditions will optimalize production, where is consistent with production plans and targets. The calculation of road conditions should be adjusted to the needs. The road geometry is a part of road planning which focuses on the physical condition of the road so that it can fulfill the road function. In addition to the geometry of the hauling roads, water can also affect the condition of the hauling roads. Therefore, it is important to conduct an evaluation of the hauling road conditions. Based on the calculation results, the straight road width is 8,575 meters, the hauling road width at the bend is 19,356 meters, while the straight road width in the field is about 7.6 meters and for curves in the field about 9 meters. From the field processed data, it is indicated that the existing hauling roads at PT Pro Intertech Indonesia mining operation has not fully met the hauling road requirements. Therefore, it is necessary to widen the hauling road in the operation area.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"205 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116374860","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERENCANAAN DESAIN DRAINASE BERBASIS DATA PENGINDERAAN JAUH PADA TAMBANG TERBUKA PT. SDIC PAPUA CEMENT KABUPATEN MANOKWARI 基于遥感数据的开发计划,PT. SDIC巴布亚水利区露天矿区
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i1.83
Aldi Fariz Valderama, Sudaryatno, Taufik Hery Purwanto
{"title":"PERENCANAAN DESAIN DRAINASE BERBASIS DATA PENGINDERAAN JAUH PADA TAMBANG TERBUKA PT. SDIC PAPUA CEMENT KABUPATEN MANOKWARI","authors":"Aldi Fariz Valderama, Sudaryatno, Taufik Hery Purwanto","doi":"10.56139/intan.v4i1.83","DOIUrl":"https://doi.org/10.56139/intan.v4i1.83","url":null,"abstract":"Mining is an activity that is done to take materials that have economic value, mining activities are activities that change the land and change the shape of the topography. This change in shape can have a significant impact on surface runoff (Run Off) changes. The calculation of runoff coefficients uses The Hassing Method by utilizing remote sensing data and using rational methods to calculate surface runoff discharge. The purpose of this research is to know the good drainage design at mining sites PT. SDIC Papua Cement by using remote sensing data and Geographic Information System (SIG). The remote sensing data used is PlanetScope imagery and DEM data from AlosPalsar imagery. The accuracy test result obtained by PlanetScope imagery has an accuracy rate of 90.9%. Based on the data of the highest rainfall at the location of 189.6 mm. The result of runoff coefficient using The Hassing Method in the rain catchment area 1 (DTH 1) obtained a result of 0.51. With the discharge of surface runoff using Rational Method obtained the result of 0.3 m³/second.  The result of the calculation of drainage design with the basic width of drainage (b) of 0.39 meters, the surface height of the channel base (y) of 0.47 meters, total drainage height (Tt) of 0.88 meters, the width of water surface (Ta) obtained results of 1.35 meters and width of drainage channels (Ts) is 1.72 meters.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132735944","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
KEBUTUHAN MATERIAL PENYEMENAN DALAM PENYEMENAN CASING LINER TUJUH INCH SUMUR X-13 LAPANGAN Y 需要绝缘材料在一个7英寸的X-13机井井Y
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v3i2.66
Hastowo Resesiyanto
{"title":"KEBUTUHAN MATERIAL PENYEMENAN DALAM PENYEMENAN CASING LINER TUJUH INCH SUMUR X-13 LAPANGAN Y","authors":"Hastowo Resesiyanto","doi":"10.56139/intan.v3i2.66","DOIUrl":"https://doi.org/10.56139/intan.v3i2.66","url":null,"abstract":"Cementing is a process of mixing cement powder, water and additives (cement slurry) which will be pumped into the wellbore through casing into the annulus along the wellbore. Liner is a casing hung onto the casing which has been set before. Before the calculation of cementing materials needed, it is needed to collect X-13 well data, in the form of well profile which is consist of casing and tubing dimension. Furthermore, laboratory data for cement and additives is also used. Based on the calculation, the total volume of cement slurry needed for open end interval cementing is 199.7 bbl, with the amount of cement sack needed is 595.2 sacks. The total solid additives needed is 21426.1 lbs and total liquid additives needed is 1294.542 gallons. The total volume of fluid needed to push the cement slurry into the cementing zone is 251.05 bbl.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"100 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132587505","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
GEOLOGI DAERAH TEMBUNI DAN SEKITARNYA KABUPATEN BINTUNI PROVINSI PAPUA BARAT 西巴布亚省宾图尼县腾布尼及周边地区的地质情况
INTAN Jurnal Penelitian Tambang Pub Date : 2022-04-01 DOI: 10.56139/intan.v4i1.79
Eric A. Patandianan, AAngelina M. Randa, Raymond M. Awak
{"title":"GEOLOGI DAERAH TEMBUNI DAN SEKITARNYA KABUPATEN BINTUNI PROVINSI PAPUA BARAT","authors":"Eric A. Patandianan, AAngelina M. Randa, Raymond M. Awak","doi":"10.56139/intan.v4i1.79","DOIUrl":"https://doi.org/10.56139/intan.v4i1.79","url":null,"abstract":"Administratively, the study area is located in Tembuni and surrounding area District of Bintuni Papua Barat Province. Geographically located at coordinates 01 ° 47 '00 \"latitude - 01 ° 50' 00\" latitude (south latitude) and 133 ° 54 '00 \"E - 119 ° 57' 00\" (East Longitude). The method used for the study is the collection of field data and geological mapping of the surface by recording at each station, taking rock samples for petrographic analysis is then performed based on the data processing is done. The purpose of this study was to obtain geological information in the form aspect of geomorphology, stratigraphy, structural geology, historical geology and extractive potential in the area of further research conducted geological map-making research areas based on four aspects. The research area is divided into three geomorphological units, namely the denudational geomorphological unit with weak-strong waves (D1), the denudational geomorphological unit with strong waves-hills (D2), and the denudational plains unit (D5). The stratigraphy of the study area is divided into two (2) rock units and one (1) sediment, based on lithostratigraphy in order from oldest to youngest, namely: Mudstone Unit, conglomerate unit, and Alluvium and littoral deposits unit. The structure of the research area only found geological structures that developed in the form of a joint secondary structure. The excavated materials found in the research area are excavated materials in the form of rocks originating from alluvial deposits found along the Mogoi Baru village, which are then used as building materials.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134267886","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书