{"title":"GEOMETRI JALAN ANGKUT DAN JARI-JARI TIKUNGAN MENGGUNAKAN TEORI AASHTO PADA PT PRO INTERTECH INDONESIA KOTA SORONG PROVINSI PAPUA BARAT","authors":"Hamdan Tri Sanjaya, Ricardo O. M. Hutapea","doi":"10.56139/intan.v3i2.60","DOIUrl":null,"url":null,"abstract":"Hauling road is an important aspect to support hauling activities in a mining operation. Better hauling road conditions will optimalize production, where is consistent with production plans and targets. The calculation of road conditions should be adjusted to the needs. The road geometry is a part of road planning which focuses on the physical condition of the road so that it can fulfill the road function. In addition to the geometry of the hauling roads, water can also affect the condition of the hauling roads. Therefore, it is important to conduct an evaluation of the hauling road conditions. Based on the calculation results, the straight road width is 8,575 meters, the hauling road width at the bend is 19,356 meters, while the straight road width in the field is about 7.6 meters and for curves in the field about 9 meters. From the field processed data, it is indicated that the existing hauling roads at PT Pro Intertech Indonesia mining operation has not fully met the hauling road requirements. Therefore, it is necessary to widen the hauling road in the operation area.","PeriodicalId":136183,"journal":{"name":"INTAN Jurnal Penelitian Tambang","volume":"205 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTAN Jurnal Penelitian Tambang","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56139/intan.v3i2.60","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Hauling road is an important aspect to support hauling activities in a mining operation. Better hauling road conditions will optimalize production, where is consistent with production plans and targets. The calculation of road conditions should be adjusted to the needs. The road geometry is a part of road planning which focuses on the physical condition of the road so that it can fulfill the road function. In addition to the geometry of the hauling roads, water can also affect the condition of the hauling roads. Therefore, it is important to conduct an evaluation of the hauling road conditions. Based on the calculation results, the straight road width is 8,575 meters, the hauling road width at the bend is 19,356 meters, while the straight road width in the field is about 7.6 meters and for curves in the field about 9 meters. From the field processed data, it is indicated that the existing hauling roads at PT Pro Intertech Indonesia mining operation has not fully met the hauling road requirements. Therefore, it is necessary to widen the hauling road in the operation area.
在采矿作业中,牵引道路是支撑牵引活动的重要方面。更好的运输道路条件将优化生产,从而与生产计划和目标保持一致。路况的计算应根据需要进行调整。道路几何是道路规划的一部分,它关注的是道路的物理状况,以实现道路的功能。除了拖运道路的几何形状外,水也会影响拖运道路的状况。因此,对牵引路况进行评估是十分重要的。根据计算结果,直道宽度为8575米,弯道处牵引道宽度为19356米,田间直道宽度约为7.6米,田间弯道宽度约为9米。从现场处理的数据来看,PT Pro Intertech印度尼西亚采矿作业现有的牵引道路不能完全满足牵引道路的要求。因此,有必要在作业区域加宽牵引道路。