Collaborative Risk Mitigation Through Construction Planning and Scheduling最新文献

筛选
英文 中文
Real Construction Mitigation Case Studies 实际建筑缓解案例研究
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181005
Lana Kay Coble
{"title":"Real Construction Mitigation Case Studies","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181005","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181005","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"266 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121413504","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Did Your Planning Meet the Desired Deadline? 你的计划达到预期的截止日期了吗?
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181010
Lana Kay Coble
{"title":"Did Your Planning Meet the Desired Deadline?","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181010","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181010","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"58 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124530567","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Who Benefits from Planning and How? 谁从计划中受益?如何受益?
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181004
Lana Kay Coble
{"title":"Who Benefits from Planning and How?","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181004","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181004","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114843077","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Appendix 附录
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181011
{"title":"Appendix","authors":"","doi":"10.1108/978-1-78743-147-820181011","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181011","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128905468","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Has It Ever Gone As Planned? 它曾经按计划进行过吗?
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181003
Lana Kay Coble
{"title":"Has It Ever Gone As Planned?","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181003","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181003","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123157704","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Index 指数
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181013
{"title":"Index","authors":"","doi":"10.1108/978-1-78743-147-820181013","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181013","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130749065","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Risk Management Matrix 风险管理矩阵
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181006
Lana Kay Coble
{"title":"Risk Management Matrix","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181006","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181006","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"14 1-4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134294984","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Communicating the Project Schedule and Change Management 沟通项目进度和变更管理
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181007
Lana Kay Coble
{"title":"Communicating the Project Schedule and Change Management","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181007","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181007","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"448 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123589476","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Prelims 预备考试
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181001
{"title":"Prelims","authors":"","doi":"10.1108/978-1-78743-147-820181001","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181001","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121700565","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Implementing Mitigation Measures Through Technological Application of the Computer Scheduling Software 通过计算机调度软件的技术应用实施缓解措施
Collaborative Risk Mitigation Through Construction Planning and Scheduling Pub Date : 2018-11-01 DOI: 10.1108/978-1-78743-147-820181009
Lana Kay Coble
{"title":"Implementing Mitigation Measures Through Technological Application of the Computer Scheduling Software","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181009","DOIUrl":"https://doi.org/10.1108/978-1-78743-147-820181009","url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133554286","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信