{"title":"谁从计划中受益?如何受益?","authors":"Lana Kay Coble","doi":"10.1108/978-1-78743-147-820181004","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":127330,"journal":{"name":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Who Benefits from Planning and How?\",\"authors\":\"Lana Kay Coble\",\"doi\":\"10.1108/978-1-78743-147-820181004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":127330,\"journal\":{\"name\":\"Collaborative Risk Mitigation Through Construction Planning and Scheduling\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Collaborative Risk Mitigation Through Construction Planning and Scheduling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/978-1-78743-147-820181004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Collaborative Risk Mitigation Through Construction Planning and Scheduling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/978-1-78743-147-820181004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}