Day 3 Wed, May 08, 2019最新文献

筛选
英文 中文
Dalmatian Subsea Boosting: Project Execution and Early Operational Experience from the First High-Boost Multiphase Boosting System Deployed in the Gulf of Mexico Dalmatian海底增压:墨西哥湾部署的首个高增压多相增压系统的项目执行和早期操作经验
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29540-MS
Arill Småland Hagland, Ross Cooper, Mike Clarke, Svein Hausberg, Jostein Tvedt, Audun Tovslid
{"title":"Dalmatian Subsea Boosting: Project Execution and Early Operational Experience from the First High-Boost Multiphase Boosting System Deployed in the Gulf of Mexico","authors":"Arill Småland Hagland, Ross Cooper, Mike Clarke, Svein Hausberg, Jostein Tvedt, Audun Tovslid","doi":"10.4043/29540-MS","DOIUrl":"https://doi.org/10.4043/29540-MS","url":null,"abstract":"\u0000 In 2016 the Subsea Integration Alliance (SIA) was awarded the industry's first deepwater integrated subsea engineering, procurement, construction, installation, and commissioning (EPCIC) multiphase boosting system contract. The scope of the contract called for the supply and installation of a subsea multiphase boosting system in the Dalmatian Field in the Gulf of Mexico and represents the world's longest deepwater subsea boosting tieback. Several studies were conducted to look at increased oil recovery (IOR), with subsea boosting yielding the best economic benefits and lowest overall risk profile. The subsea boosting system has now been installed and has significantly improved the operator's ultimate recovery.\u0000 The Dalmatian Field was developed in deepwater Gulf of Mexico by Murphy and partners and commenced production in April 2014. The field was developed as a subsea tieback in water depths of approximately 6,000 ft, with a record tieback distance of 22 mi to the Petronius Field compliant tower platform in shallower waters of approximately 1,800 ft.\u0000 The challenge of increased recovery in subsea fields has driven the advancement of subsea processing technologies, especially in the subsea boosting domain. The successful operation of subsea multiphase boosting systems on a global scale, coupled with the significant added value these systems generate, has driven technological advances in terms of higher differential pressures and longer step-outs.\u0000 The subsea boosting system was installed in October 2018 and significantly improving the operator's ultimate recovery. Working in close collaboration with the operating company, the SIA has demonstrated that this type of project execution, also referred to as a supplier-led-solution (SLS), can be an effective way to accelerate project completion, reduce schedule and installation risk, and improve overall project economics.\u0000 This project was completed in a very short execution time of less than 23 months from contract award to pump startup. This was achieved using mature technology in combination with a novel integrated contract model. In addition, a front-end engineering design (FEED) study was performed to define the project scope that included integrated asset modeling to fully explore the potential of the system that enabled the project to be sanctioned.\u0000 The Dalmatian subsea boosting system represents a game changer in the subsea processing domain because it is an important leap forward in the efforts to improve recovery and enable long deepwater tiebacks. For field developments in remote, deep, and hostile locations, this technology represents a key enabler.\u0000 This paper explains the application of the subsea boosting system in the Dalmatian Field and discusses how the Alliance's SLS approach to project delivery using fit-for-purpose solutions based on existing design ensured a seamless delivery and installation of a deepwater boosting system for the operator.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90190582","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The High Pressure Expander Process Technology for LNG Applications LNG高压膨胀工艺技术
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29379-MS
Liu Yijun, Fritz Pierre, A. K. Nagavarapu
{"title":"The High Pressure Expander Process Technology for LNG Applications","authors":"Liu Yijun, Fritz Pierre, A. K. Nagavarapu","doi":"10.4043/29379-MS","DOIUrl":"https://doi.org/10.4043/29379-MS","url":null,"abstract":"Recent focus of the LNG industry has been on developing technologies to decrease capital investment and increase operational efficiency to reduce overall cost of supply. Pursuing this target, a novel, compact, and high efficiency expander-based liquefaction technology has been developed to monetize gas assets. The technology uses a single phase methane refrigerant stream operating at distinguishingly high pressures followed by a single phase nitrogen refrigerant stream. Such a configuration dramatically improves energy efficiency (by 10 - 25 %) and train production capacity (by 100 - 150%) compared to other expander-based technologies, while maintaining process simplicity, lower equipment count, and lighter weight relative to mixed-refrigerant based liquefaction processes. Furthermore, integrating with a front-end heavy hydrocarbon removal unit, the technology also enables standardized liquefaction train design for a wide range of gas composition around a nominal train capacity. The standard design is well suited for parallel train configurations and phased development philosophy to drive design and execution efficiency. In addition to CAPEX savings, the weight and footprint savings are beneficial in locations where space is at a premium. While the technology platform is broadly applicable for both offshore and onshore opportunities, this paper will focus on a recent offshore LNG project which showcased the technology's significant benefit in CAPEX, weight, footprint, personnel safety, insensitivity to ocean motion, refrigerant handling and many other operation advantages. It even enabled production capacity increase from 3.5 to 4.6 on the same circular hull floating facility, proving itself as a game changer to reduce cost of supply of this liquefaction project.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"293 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91459716","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Behavior of Laterally Loaded Offshore Wind Monopiles in Sands 沙中横向加载海上风力单桩的性能
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29673-MS
R. Gilbert, Yunhan Huang, K. Stokoe, S. Wang, J. Munson, Jonas Bauer, R. Hosseini, Ahmed Hussien, H. Fadaifard, Daniel P. O'Connell
{"title":"Behavior of Laterally Loaded Offshore Wind Monopiles in Sands","authors":"R. Gilbert, Yunhan Huang, K. Stokoe, S. Wang, J. Munson, Jonas Bauer, R. Hosseini, Ahmed Hussien, H. Fadaifard, Daniel P. O'Connell","doi":"10.4043/29673-MS","DOIUrl":"https://doi.org/10.4043/29673-MS","url":null,"abstract":"\u0000 The conventional design methods for laterally loaded offshore foundations in sand, API RP 2GEO (2014) and DNV (2018), were not developed for wind turbine monopiles that experience lateral loads imposing relatively small lateral displacements in service. This paper presents the results of research to evaluate the suitability of existing guidance for the design of laterally loaded monopiles at small displacements and to provide recommendations for improving design methods for monopile foundations. The research included applying existing techniques to measure the non-linear stiffness of sand at small shear strains, utilizing a three-dimensional finite element method (3-D FEM) model that incorporates the non-linear stiffness of sand to predict the lateral response of a monopile, testing the proposed approach with foundation model tests in the laboratory, and applying the proposed approach to the lateral load tests conducted on Mustang Island in 1966 that provided the original basis for current design methods.\u0000 The following major conclusions are drawn from this research:\u0000 Model tests and field tests consistently show that the conventional p-y curves from current design practice tend to underestimate the initial stiffness for laterally loaded piles and fail to capture the non-linearity of the stiffness at small lateral displacements. A 3-D FEM model that incorporates a constitutive model to characterize the small-strain properties of sand, including the maximum shear stiffness at very small strains and the relationships between shear stiffness and both shear strain and effective confining stress, is capable of predicting the response of laterally loaded piles both at model and field scales.\u0000 These conclusions lead to the following recommendations for the design of laterally loaded monopiles in sand:\u0000 Exercise caution in using conventional p-y curves for sand to predict the performance of offshore wind turbine monopiles in service. The conventional p-y curves used in current design practice do not adequately predict the stiffness and non-linearity of laterally loaded piles at the small lateral displacements relevant for offshore wind turbine monopiles in service. Measure directly or empirically establish the in-situ maximum (\"small-strain\") shear modulus, the relationship between shear modulus and shear strain, and the relationship between shear modulus and effective confining pressure. These small-strain properties are needed to predict the stiffness and non-linearity of laterally loaded piles at small lateral displacements. Establish improved p-y curves to be used in design directly from 3-D FEM analyses using representative properties of the sand in-situ at small strains.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"672 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76860380","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Fracture Mechanics Based Fatigue Assessment of an HPHT Valve Body 基于断裂力学的高温高压阀体疲劳评价
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29249-MS
J. Sahoo, M. Campbell, M. Cerkovnik
{"title":"Fracture Mechanics Based Fatigue Assessment of an HPHT Valve Body","authors":"J. Sahoo, M. Campbell, M. Cerkovnik","doi":"10.4043/29249-MS","DOIUrl":"https://doi.org/10.4043/29249-MS","url":null,"abstract":"\u0000 The development of HPHT oilfield equipment has typically resulted in the construction of heavy-walled designs, where the increase in rated working pressure is accommodated by an increase in sectional thickness. This manner of design, however, is limited by practical difficulties which arise in the areas of manufacturing, handling/lifting, and uniformity of through-thickness material properties. Designs of more efficient size and weight may be developed by relaxing assumed design factors and hydrotest pressures, but this requires more rigorous analysis, validation, and QA measures.\u0000 In particular, designers must address the fatigue susceptibility of HPHT equipment which, even in purely static conditions, may fail under cycles of shut-in pressure alone. These failures typically originate from stress risers such as cross-bores, seat pockets, or transitions in bore diameter, which exhibit complex stress states under the action of internal pressure. A fracture mechanics (FM) based analysis of such features has presented a longstanding challenge to designers and analysts as general solutions for their KI and σref are not presently available.\u0000 It is therefore the objective of this paper to provide a useful methodology for conducting FM-based analysis of arbitrary geometry using the KI and σref solutions provided in API 579-1/ASME FFS-1. The method is presented in the form of a case study which describes the FM-based fatigue analysis of a seat pocket radius within a valve body. Here, the mode I behavior of a hypothetical surface-breaking, semi-elliptical flaw located at the seat pocket radius is evaluated by means of 3D finite element analysis.\u0000 This method generally comprises two parts. The first involves the development of a 3D finite element model similar to what would be used in a conventional durability analysis. From this model, stresses are extracted along an anticipated fracture plane and used in conjunction with a weight function method to derive KI and σref from solutions provided in API 579-1/ASME FFS-1. These solutions are then used to compute the number of cycles to unstable fracture.\u0000 The second part involves the direct incorporation of cracks into the finite element model. The approach benefits from a submodeling technique which reduces computational expense and allows the method to be used on complex structures. The numerical model is used in conjunction with conventional linear-elastic fracture mechanics assumptions to derive KI solutions for the geometry of interest. These KI results are used to confirm the conservatism of the code-based solutions and, thereby, the conservatism of the previous FM analysis.\u0000 The method described in this paper allows designers to rapidly develop and execute FM-based fatigue analyses of arbitrary geometric features in timeframes similar to those associated with traditional S-N analysis.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"15 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75178424","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Risks Minimization and Results Improvement in Offshore Projects 海上项目的风险最小化和成果改进
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29325-MS
Hongfu Shi, Wei Zhang, Xiaodong Han, Haochuan Ling, Chaojie Kong
{"title":"Risks Minimization and Results Improvement in Offshore Projects","authors":"Hongfu Shi, Wei Zhang, Xiaodong Han, Haochuan Ling, Chaojie Kong","doi":"10.4043/29325-MS","DOIUrl":"https://doi.org/10.4043/29325-MS","url":null,"abstract":"\u0000 A new regional integrated development pattern is proposed by Bohai Oilfield Bureau, based on the existing development and production system and engineering facilities, and combined with the distribution characteristics of underground oil and gas resources in Bohai oilfields, and according to the principles of ‘overall planning, unified layout, stage promotion and subarea implementation'. Through the integration and rational allocation of exploration and development, reservoir and engineering, development and production, the overall planning of underground resources and ground engineering is carried out, and a perfect regional development pattern is gradually formed. Based on reducing the threshold of oilfield development through resources sharing and accelerating the construction of new oilfield, the reservoir potential is fully released, and the efficient development of regional oil and gas is realized.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"258 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76203807","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Digital Twin for Drilling Operations – Towards Cloud-Based Operational Planning 钻井作业的数字孪生——迈向基于云的作业规划
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29316-MS
L. Pivano, D. Nguyen, K. Ludvigsen
{"title":"Digital Twin for Drilling Operations – Towards Cloud-Based Operational Planning","authors":"L. Pivano, D. Nguyen, K. Ludvigsen","doi":"10.4043/29316-MS","DOIUrl":"https://doi.org/10.4043/29316-MS","url":null,"abstract":"\u0000 Most drilling operations in deep water are performed in Dynamic Positioning (DP) mode. In harsh environments and shallow water conditions, thruster assisted position mooring configurations are often the preferred choice as the mooring lines provide an extra help to counteract the environmental loads. Drilling operations, both in pure DP or thruster-assisted position mooring modes, are limited by the ability of the vessel to maintain position and heading within the required accuracy. In addition, the motion in heave, roll and pitch must be within predefined limits. These limits vary between the type of operation to be performed. For example, reconnecting the low marine riser package has much stricter motion limitations compared to logging or drilling through riser operations. All these operations need to be carefully planned; and having estimate in advance of the vessel motion and station-keeping performance could be of vital importance, also considering planned maintenance.\u0000 The aim of this paper is to share experiences in planning DP drilling operations by using cloud-based time-domain simulations performed with a digital twin of a semi-submersible drilling rig. A digital twin is a virtual representation of an asset, used from early design through building and operations, maintained and easily accessible throughout its lifecycle. A digital twin can replicate many aspects of the asset; in the case of planning DP drilling operations, our digital twin includes time-domain models for running simulations and predicting the vessel motion.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"32 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74799629","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Offshore LNG Mega-Module Solution 海上液化天然气巨型模块解决方案
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29633-MS
J. Dimbour, Loic Ferron, Eric Luquiau, Benoît Laflotte
{"title":"Offshore LNG Mega-Module Solution","authors":"J. Dimbour, Loic Ferron, Eric Luquiau, Benoît Laflotte","doi":"10.4043/29633-MS","DOIUrl":"https://doi.org/10.4043/29633-MS","url":null,"abstract":"\u0000 Offshore floating LNG can offer an optimum CAPEX solution either for the development of large or stranded gas fields, including full processing functions, or as an enabler to oil production while monetizating associated gas.\u0000 The offshore LNG mega-module solution was developed to meet the challenge of producing competitive LNG offshore, leading to the next generation of floating LNG facilities.\u0000 This paper decribes the offshore LNG mega-module innovative solution of which the features are patent pending. The design features are highlighted, then the specifics of combining topsides with hull are presented, followed by the installation particulars. Finally, perspectives and savings in using this solution are presented.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"174 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86806528","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Subsea Demulsifier Injection to Enhance Crude Oil Production in Offshore Brownfields - A Success Case 海底破乳剂注入提高海上棕地原油产量的成功案例
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29535-MS
M. Oliveira, Monica Alevatto, T. P. Sampaio, P. Dias
{"title":"Subsea Demulsifier Injection to Enhance Crude Oil Production in Offshore Brownfields - A Success Case","authors":"M. Oliveira, Monica Alevatto, T. P. Sampaio, P. Dias","doi":"10.4043/29535-MS","DOIUrl":"https://doi.org/10.4043/29535-MS","url":null,"abstract":"\u0000 In Brazil oilfield scenario, there are large, clearly identified brownfield sites, many of which with high additional oil production potential. The lifting costs and conventional breakeven price per barrel associated with an existing producing field offshore, even those in decline and requiring some recompletion & workover jobs, are – in many situations - less investiment demanding than brand new greenfield development.\u0000 The formation of water in oil (W/O) emulsions is ubiquitous in oilfield production. As the water commingled in crude increases, the emulsions' stability and viscosity also increase, thence generating flow restrictions due to higher friction losses. The subsea demulsifier injection has proven to be an interesting alternative to overcome this flowing constraint in mature wells, thus maximizing the productive capacity of existing brownfields. This paper presents some results and challenges faced to implement the routine of subsea demulsifier injection, from the development of testing protocols to come up with a tailor-made chemical solution, to the hurdles associated to chemical injection through subsea umbilical- and gas lift-lines.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"52 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76258837","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Operators Optimize High-Pressure/High-Temperature and Ultrahigh-Pressure Perforation Strategies Using Laboratory Testing 运营商通过实验室测试优化高压/高温和超高压射孔策略
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29611-MS
B. Grove, R. DeHart, J. McGregor, Haggerty Dennis, C. Christopher
{"title":"Operators Optimize High-Pressure/High-Temperature and Ultrahigh-Pressure Perforation Strategies Using Laboratory Testing","authors":"B. Grove, R. DeHart, J. McGregor, Haggerty Dennis, C. Christopher","doi":"10.4043/29611-MS","DOIUrl":"https://doi.org/10.4043/29611-MS","url":null,"abstract":"\u0000 Multiple perforation laboratory programs have been conducted during recent years to support high-pressure/high-temperature (HP/HT) and ultrahigh-pressure (UHP) oil and gas field developments at various offshore locations globally. This paper highlights six such projects that supported activities within the Asia-Pacific, North Sea, and US Gulf of Mexico (GOM) (both Miocene and Lower Tertiary) regions. Each program was designed and conducted in collaboration with an operator and field operations personnel to help reduce potential risks, improve operational efficiency, and optimize well performance across a variety of challenging environments.\u0000 Laboratory experiments were based on API RP 19B Sections 2 and 4, with test conditions customized to match specific downhole environments of interest (rock and fluid properties, stress, pressure, temperature, and flow scenarios). Matching downhole conditions at the laboratory proved important because this yields results that can be quite different from those obtained at surface (or scaled) test conditions. Reliable estimations of field perforation skin, sanding propensity, and the effectiveness of subsequent stimulation operations depend on realistic perforation and flow data obtained at relevant downhole conditions. The overriding goal for test design is to create and expose the laboratory perforation in an environment that matches its field counterpart as closely as possible. Beyond obtaining accurate flow data for skin and/or sanding propensity determination, post-test diagnostics, such as computed tomography (CT) and optical techniques, provide additional essential insight into the characteristics of the perforation tunnel, core interior, and the hole through the casing and cement.\u0000 Results from these various programs were used to confirm or, in some cases, guide the field perforating strategy.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"53 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76394752","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Application of Coupled Simulation Optimization Methodology to Study Dual Nitrogen Expander Liquefaction Response to Feed Gas Variations from an Optimized Design 应用耦合模拟优化方法研究双氮膨胀器液化对优化设计中原料气变化的响应
Day 3 Wed, May 08, 2019 Pub Date : 2019-04-26 DOI: 10.4043/29591-MS
S. Tierling, D. Attaway
{"title":"Application of Coupled Simulation Optimization Methodology to Study Dual Nitrogen Expander Liquefaction Response to Feed Gas Variations from an Optimized Design","authors":"S. Tierling, D. Attaway","doi":"10.4043/29591-MS","DOIUrl":"https://doi.org/10.4043/29591-MS","url":null,"abstract":"\u0000 Interest in dual nitrogen expander liquefaction technology for floating liquefied natural gas (FLNG) applications is driven by the following factors: inflammable refrigerantsimplicitylow weightno refrigerant sloshing or maldistribution due to motionquick start-upeasy adjustment for changing feed conditions\u0000 The downside is that dual nitrogen expander technology offers significantly lower liquefaction efficiency than competing FLNG technologies. The proper selection and sizing of the upstream gas treating and liquefaction system is critical during Front End Engineering Design (FEED) to ensure that the system footprint, weight and center-of-gravity is appropriately estimated as this effects the sizing, design and performance of the floating hull.\u0000 This paper will demonstrate how the process design can be optimized over a range of feed compositions or conditions if some flexibility is built into the liquefaction heat exchange during design. This preserves flexibility as a key advantage of the technology. The intent is to reduce process inefficiencies and promote competitiveness with other technologies. Note that there are many different nitrogen expander technology configurations available in the market. The configuration used here is generic and used to demonstrate the optimization concept.\u0000 With 10 independent variables and coupling between the variables, this optimization is difficult to perform using simple manual methods. Therefore we will employ a coupled simulation-optimization method.\u0000 This paper also provides insight to the application of coupled simulation-optimization to problems, as illustrated by the specific application to a dual titrogen expander technology. Although this method is applicable to the initial design of liquefaction processes, the focus here is on off-design optimization of the facility later in the design cycle and in operation.\u0000 This optimization methodology is shown to provide benefits beyond the initial process design, extending into the operation of the facility. The methodology does not rely upon a specific tool set and there are non-academic tools that support this approach.","PeriodicalId":10968,"journal":{"name":"Day 3 Wed, May 08, 2019","volume":"43 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81197789","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书