Engineering and Process Economics最新文献

筛选
英文 中文
Diary of events 事件日记
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90020-2
{"title":"Diary of events","authors":"","doi":"10.1016/0377-841X(79)90020-2","DOIUrl":"https://doi.org/10.1016/0377-841X(79)90020-2","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 67-68"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90020-2","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137408592","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The contribution of the international engineering contractor in process licensing 国际工程承包商在过程许可中的贡献
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90012-3
M.R. Howard
{"title":"The contribution of the international engineering contractor in process licensing","authors":"M.R. Howard","doi":"10.1016/0377-841X(79)90012-3","DOIUrl":"10.1016/0377-841X(79)90012-3","url":null,"abstract":"<div><p>Whether a process company acts as the licensor of its own technology, or as the licensee of third party technology, it is normal for a contractor to contribute significantly in the realisation of the Company's overall objectives. There are three main areas where a contractor contributes in a licensing situation — the provision of proprietory technology, of services to the licensee and of services to the licensor. The paper examines each of these.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 23-27"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90012-3","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"112129108","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Books for engineering economics education 用于工程经济学教育的书籍
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90015-9
R.F. de la Mare
{"title":"Books for engineering economics education","authors":"R.F. de la Mare","doi":"10.1016/0377-841X(79)90015-9","DOIUrl":"https://doi.org/10.1016/0377-841X(79)90015-9","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 51-53"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90015-9","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137408594","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The economics of capital budgeting 资本预算经济学
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90017-2
I.G. Watson, J. Kruithof
{"title":"The economics of capital budgeting","authors":"I.G. Watson,&nbsp;J. Kruithof","doi":"10.1016/0377-841X(79)90017-2","DOIUrl":"10.1016/0377-841X(79)90017-2","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Page 63"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90017-2","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"92578949","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Oil resources — who gets what how? 石油资源——谁得到什么,怎么得到?
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90018-4
M. Wilson
{"title":"Oil resources — who gets what how?","authors":"M. Wilson","doi":"10.1016/0377-841X(79)90018-4","DOIUrl":"10.1016/0377-841X(79)90018-4","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 63-64"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90018-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75845546","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Books for engineering economics education 用于工程经济学教育的书籍
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90016-0
R.F. de la Mare
{"title":"Books for engineering economics education","authors":"R.F. de la Mare","doi":"10.1016/0377-841X(79)90016-0","DOIUrl":"https://doi.org/10.1016/0377-841X(79)90016-0","url":null,"abstract":"<div><p>Four more books are reviewed in this article thereby concluding the major objective of this review series as formulated in Part I (Vol. I, No. 2, June, 1976, page 149). The author has therefore taken the opportunity to ‘take stock’ of all of the assessment ratings which these books have received with a view to making some recommendations to prospective students of engineering economics and their teachers. Four books in particular are recommended. These are (1) A Programme of Learning; by I.C.I., published by Methuen. (2) Capital Budgeting and Company Finance; by Merrett and Sykes, published by Longmans. (3) Engineering Economy; by Thuesen, Fabrycky and Thuesen, published by Prentice-Hall and (4) Principles of Engineering Economy; by Grant and Ireson, published by Ronald Press.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 55-61"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90016-0","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137408595","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The evaluation of the present worth of normally distributed cash flows 对正态分布现金流现值的评估
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90014-7
J.Frank Valle-Riestra
{"title":"The evaluation of the present worth of normally distributed cash flows","authors":"J.Frank Valle-Riestra","doi":"10.1016/0377-841X(79)90014-7","DOIUrl":"10.1016/0377-841X(79)90014-7","url":null,"abstract":"<div><p>The production output of a chemical manufacturing facility only rarely remains at rated capacity throughout the plant's lifetime. The production life cycle often may be approximated by a segment of the normal distribution curve. A method is developed for computing the present worth of normally distributed cash flows and the discounted cash flow profitability index for facilities with a production life cycle which is approximated by the normal distribution curve. It is shown that the resulting value of the profitability is about the same as that for a plant operating steadily at 70% of rated capacity. Adoption of this simple criterion during early stages of project development results in a more realistic assessment of the long range attractiveness of the project.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 37-50"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90014-7","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80238090","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
The economic analysis of industrial projects 工业项目的经济分析
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90019-6
{"title":"The economic analysis of industrial projects","authors":"","doi":"10.1016/0377-841X(79)90019-6","DOIUrl":"https://doi.org/10.1016/0377-841X(79)90019-6","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 64-65"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90019-6","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137408593","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Determinants of locational decisions—The industrialist's view 区位决策的决定因素——实业家的观点
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90010-X
M.J. de Meirleir
{"title":"Determinants of locational decisions—The industrialist's view","authors":"M.J. de Meirleir","doi":"10.1016/0377-841X(79)90010-X","DOIUrl":"10.1016/0377-841X(79)90010-X","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 5-11"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90010-X","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79672509","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Developments in project cost control 项目成本控制的发展
Engineering and Process Economics Pub Date : 1979-03-01 DOI: 10.1016/0377-841X(79)90013-5
E.A. Stallworthy
{"title":"Developments in project cost control","authors":"E.A. Stallworthy","doi":"10.1016/0377-841X(79)90013-5","DOIUrl":"10.1016/0377-841X(79)90013-5","url":null,"abstract":"<div><p>Estimating factors, cost ratios and quantity ratios are estimating tools, developed from an analysis of the historic cost of capital investment projects. Whilst a plant is being built, however, these relationships are not static, but dynamic. Not only the relationships in themselves but also their changing value during the life of a project can be used to facilitate project cost control. The “S-curve” is the classic example in this field, but others have now been developed.</p><p>Using a case study, this paper illustrates the way in which the development and analysis of such ratios can contribute both to an assessment of the progress being made and the forecasting of potential trends whilst a project is under construction. The cost control engineer is thereby in a better position to give “early warnings” to project management in relation to the estimates of cost and time.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 1","pages":"Pages 29-36"},"PeriodicalIF":0.0,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90013-5","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85044186","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信