Developments in project cost control

E.A. Stallworthy
{"title":"Developments in project cost control","authors":"E.A. Stallworthy","doi":"10.1016/0377-841X(79)90013-5","DOIUrl":null,"url":null,"abstract":"<div><p>Estimating factors, cost ratios and quantity ratios are estimating tools, developed from an analysis of the historic cost of capital investment projects. Whilst a plant is being built, however, these relationships are not static, but dynamic. Not only the relationships in themselves but also their changing value during the life of a project can be used to facilitate project cost control. The “S-curve” is the classic example in this field, but others have now been developed.</p><p>Using a case study, this paper illustrates the way in which the development and analysis of such ratios can contribute both to an assessment of the progress being made and the forecasting of potential trends whilst a project is under construction. The cost control engineer is thereby in a better position to give “early warnings” to project management in relation to the estimates of cost and time.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90013-5","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X79900135","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Estimating factors, cost ratios and quantity ratios are estimating tools, developed from an analysis of the historic cost of capital investment projects. Whilst a plant is being built, however, these relationships are not static, but dynamic. Not only the relationships in themselves but also their changing value during the life of a project can be used to facilitate project cost control. The “S-curve” is the classic example in this field, but others have now been developed.

Using a case study, this paper illustrates the way in which the development and analysis of such ratios can contribute both to an assessment of the progress being made and the forecasting of potential trends whilst a project is under construction. The cost control engineer is thereby in a better position to give “early warnings” to project management in relation to the estimates of cost and time.

项目成本控制的发展
估算因素,成本比率和数量比率是估算工具,从资本投资项目的历史成本分析发展而来。然而,当工厂正在建设时,这些关系不是静态的,而是动态的。不仅这些关系本身,而且它们在项目生命周期中不断变化的价值都可以用来促进项目成本的控制。“s曲线”是这个领域的经典例子,但现在已经发展出了其他的例子。通过一个案例研究,本文说明了这些比率的发展和分析如何有助于评估正在取得的进展和预测项目正在建设中的潜在趋势。因此,成本控制工程师处于一个更好的位置,可以就成本和时间的估计向项目管理提供“早期预警”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信