Consulting-specifying engineer最新文献

筛选
英文 中文
Standby power for critical areas: hospitals. 关键领域备用电源:医院。
Consulting-specifying engineer Pub Date : 1990-02-01
I Lazar
{"title":"Standby power for critical areas: hospitals.","authors":"I Lazar","doi":"","DOIUrl":"","url":null,"abstract":"<p><p>Selecting an emergency standby power system for critical areas is a task requiring a thorough knowledge of available systems and the loads that must be covered.</p>","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"7 2","pages":"50-5"},"PeriodicalIF":0.0,"publicationDate":"1990-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"20975346","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
1990 specifier's guide. 1990年说明指南。
Consulting-specifying engineer Pub Date : 1990-01-01
{"title":"1990 specifier's guide.","authors":"","doi":"","DOIUrl":"","url":null,"abstract":"","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"7 7","pages":"7-271"},"PeriodicalIF":0.0,"publicationDate":"1990-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"20978584","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Directory of professional associations and societies. 专业协会和学会名录。
Consulting-specifying engineer Pub Date : 1990-01-01
{"title":"Directory of professional associations and societies.","authors":"","doi":"","DOIUrl":"","url":null,"abstract":"","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"7 7","pages":"291-5"},"PeriodicalIF":0.0,"publicationDate":"1990-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"20978583","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Specialized wiring/devices handle critical needs. 专门的布线/设备处理关键需求。
Consulting-specifying engineer Pub Date : 1989-11-01
J H Graham
{"title":"Specialized wiring/devices handle critical needs.","authors":"J H Graham","doi":"","DOIUrl":"","url":null,"abstract":"<p><p>Designing electrical systems for hospitals involves strict adherence to stringent codes and regulations. Specialized electrical devices and wiring help meet the demands.</p>","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"6 5","pages":"40-3"},"PeriodicalIF":0.0,"publicationDate":"1989-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21167812","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Air handling units for hospitals. 医院空气处理装置。
Consulting-specifying engineer Pub Date : 1989-10-01
V Amoroso, R Gjestvang
{"title":"Air handling units for hospitals.","authors":"V Amoroso,&nbsp;R Gjestvang","doi":"","DOIUrl":"","url":null,"abstract":"<p><p>Air handling units should provide proper quality and conditioned air to various hospital areas. Unit capacity should be able to meet limited space functionality or load changes as well as any smoke control requirements. System components should be readily accessible and appropriate for spaces served. In summary, engineers should consider the following: Environmental design criteria for area being served Components desired Unit type required Economic issues affecting design. Using this approach, design engineers can design hospital air handling units methodically and logically.</p>","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"6 4","pages":"56-60"},"PeriodicalIF":0.0,"publicationDate":"1989-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21165559","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Modular system reduces costs, improves comfort at nursing home. 模块化系统降低了成本,提高了养老院的舒适度。
Consulting-specifying engineer Pub Date : 1989-06-01
{"title":"Modular system reduces costs, improves comfort at nursing home.","authors":"","doi":"","DOIUrl":"","url":null,"abstract":"","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"5 7","pages":"69"},"PeriodicalIF":0.0,"publicationDate":"1989-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21163674","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Essential electrical system specification for hospitals. 医院基本电气系统规范。
Consulting-specifying engineer Pub Date : 1989-04-01
C H Meyer
{"title":"Essential electrical system specification for hospitals.","authors":"C H Meyer","doi":"","DOIUrl":"","url":null,"abstract":"<p><p>National and local codes and regulations help ensure emergency power systems keep critical hospital functions up and running during utility power outages.</p>","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"Suppl ","pages":"30-2, 34-5"},"PeriodicalIF":0.0,"publicationDate":"1989-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21160175","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Control system brings the future to Childrens Hospital. 控制系统为儿童医院带来未来。
Consulting-specifying engineer Pub Date : 1989-03-01
H J McKew, P A Williams
{"title":"Control system brings the future to Childrens Hospital.","authors":"H J McKew,&nbsp;P A Williams","doi":"","DOIUrl":"","url":null,"abstract":"","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"5 3","pages":"72-6"},"PeriodicalIF":0.0,"publicationDate":"1989-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21163069","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Construction costs slashed with new management system. 新的管理制度大大削减了建筑成本。
Consulting-specifying engineer Pub Date : 1989-02-01
E Yaffee
{"title":"Construction costs slashed with new management system.","authors":"E Yaffee","doi":"","DOIUrl":"","url":null,"abstract":"","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"5 2","pages":"38-43"},"PeriodicalIF":0.0,"publicationDate":"1989-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21175782","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Economy/construction to continue growth, but at a slower pace. 经济/建设将继续增长,但增速放缓。
Consulting-specifying engineer Pub Date : 1989-01-01
K Baker, L A Gilmore, D Selsky
{"title":"Economy/construction to continue growth, but at a slower pace.","authors":"K Baker,&nbsp;L A Gilmore,&nbsp;D Selsky","doi":"","DOIUrl":"","url":null,"abstract":"","PeriodicalId":79582,"journal":{"name":"Consulting-specifying engineer","volume":"5 1","pages":"74-8"},"PeriodicalIF":0.0,"publicationDate":"1989-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"21158153","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信