地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-37
R. Galli, T. Ireland, C. Howard
{"title":"City Rail Link, New Zealand – reduction of land acquisition time and risk on the City Rail Link Project","authors":"R. Galli, T. Ireland, C. Howard","doi":"10.1201/9780429424441-37","DOIUrl":"https://doi.org/10.1201/9780429424441-37","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87579515","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-472
H. Ertl
{"title":"Risk allocation in the FIDIC forms of contract, and the Emerald Book’s place in the Rainbow Suite","authors":"H. Ertl","doi":"10.1201/9780429424441-472","DOIUrl":"https://doi.org/10.1201/9780429424441-472","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"108 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88036524","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-506
N. Faggioni, S. Franzoni, F. Devia
{"title":"Fire ventilation systems in a metro station equipped platform screen doors","authors":"N. Faggioni, S. Franzoni, F. Devia","doi":"10.1201/9780429424441-506","DOIUrl":"https://doi.org/10.1201/9780429424441-506","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"172 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82939318","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-458
O. Carbone, G. Molisso, S. Riccio
{"title":"The Naples Line 6 underground metro system works: From the feasibility study to the construction","authors":"O. Carbone, G. Molisso, S. Riccio","doi":"10.1201/9780429424441-458","DOIUrl":"https://doi.org/10.1201/9780429424441-458","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89206329","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-167
Y. Tan, K. Koo, D. Ting
{"title":"Deep intervention shaft excavation in Kuala Lumpur limestone formation with pre-tunnelling construction method","authors":"Y. Tan, K. Koo, D. Ting","doi":"10.1201/9780429424441-167","DOIUrl":"https://doi.org/10.1201/9780429424441-167","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"21 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90184268","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-309
S. Reid, E. Bernard
{"title":"De-bonding of shotcrete linings at the substrate boundary","authors":"S. Reid, E. Bernard","doi":"10.1201/9780429424441-309","DOIUrl":"https://doi.org/10.1201/9780429424441-309","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"45 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88948255","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-142
M. Ferrero, S. Torresani, R. Zurlo
{"title":"Analysis of jet-grouting-consolidation in wide and deep shafts in alluvial soil","authors":"M. Ferrero, S. Torresani, R. Zurlo","doi":"10.1201/9780429424441-142","DOIUrl":"https://doi.org/10.1201/9780429424441-142","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"81 5 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83157030","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-575
L. Carli, P. Galvanin, G. Peri, A. Carrettucci, M. Lodico
{"title":"Milan Metro Line 4: The Dateo underground station","authors":"L. Carli, P. Galvanin, G. Peri, A. Carrettucci, M. Lodico","doi":"10.1201/9780429424441-575","DOIUrl":"https://doi.org/10.1201/9780429424441-575","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"192 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83730993","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-574
V. Capata, M. Repetto, F. Bircolotti
{"title":"Bucarest Metro Line M5: Underpassing of existing Eroilor1 subway station during regular train transit","authors":"V. Capata, M. Repetto, F. Bircolotti","doi":"10.1201/9780429424441-574","DOIUrl":"https://doi.org/10.1201/9780429424441-574","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"116 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79225171","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
地下工程与隧道Pub Date : 2019-04-17DOI: 10.1201/9780429424441-158
G. Pittaro
{"title":"Discussion of selection of ground improvement parameters from back analysis of monitored excavation in Singapore","authors":"G. Pittaro","doi":"10.1201/9780429424441-158","DOIUrl":"https://doi.org/10.1201/9780429424441-158","url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"163 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83227103","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}