低温建筑技术最新文献

筛选
英文 中文
RISK ANALYSIS OF TUNNEL SHIELD MACHINE DRIVING-IN AND DRIVING-OUT CONSTRUCTION PROCESS IN TUNNELLING ENGINEERING 隧道工程中隧道盾构机进、出施工过程的风险分析
低温建筑技术 Pub Date : 2010-10-06 DOI: 10.1201/B10025-37
D. Yang, R. Guo
{"title":"RISK ANALYSIS OF TUNNEL SHIELD MACHINE DRIVING-IN AND DRIVING-OUT CONSTRUCTION PROCESS IN TUNNELLING ENGINEERING","authors":"D. Yang, R. Guo","doi":"10.1201/B10025-37","DOIUrl":"https://doi.org/10.1201/B10025-37","url":null,"abstract":"Based on Zhengzhou Metro M1 line project,the risk analysis method is presented in the paper,which evaluates risk level of working condition using expert investigation method and evaluates weights of the risk factors using analytical hierarchy process.Risk of tunneling machine driving-in and driving-out construction process is analyzed.Risk control measures are put forward based on the results of risk analysis.","PeriodicalId":57752,"journal":{"name":"低温建筑技术","volume":"98 1","pages":"199-204"},"PeriodicalIF":0.0,"publicationDate":"2010-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81318634","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信