隧道工程中隧道盾构机进、出施工过程的风险分析

D. Yang, R. Guo
{"title":"隧道工程中隧道盾构机进、出施工过程的风险分析","authors":"D. Yang, R. Guo","doi":"10.1201/B10025-37","DOIUrl":null,"url":null,"abstract":"Based on Zhengzhou Metro M1 line project,the risk analysis method is presented in the paper,which evaluates risk level of working condition using expert investigation method and evaluates weights of the risk factors using analytical hierarchy process.Risk of tunneling machine driving-in and driving-out construction process is analyzed.Risk control measures are put forward based on the results of risk analysis.","PeriodicalId":57752,"journal":{"name":"低温建筑技术","volume":"98 1","pages":"199-204"},"PeriodicalIF":0.0000,"publicationDate":"2010-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"RISK ANALYSIS OF TUNNEL SHIELD MACHINE DRIVING-IN AND DRIVING-OUT CONSTRUCTION PROCESS IN TUNNELLING ENGINEERING\",\"authors\":\"D. Yang, R. Guo\",\"doi\":\"10.1201/B10025-37\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on Zhengzhou Metro M1 line project,the risk analysis method is presented in the paper,which evaluates risk level of working condition using expert investigation method and evaluates weights of the risk factors using analytical hierarchy process.Risk of tunneling machine driving-in and driving-out construction process is analyzed.Risk control measures are put forward based on the results of risk analysis.\",\"PeriodicalId\":57752,\"journal\":{\"name\":\"低温建筑技术\",\"volume\":\"98 1\",\"pages\":\"199-204\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"低温建筑技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1201/B10025-37\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"低温建筑技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1201/B10025-37","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文以郑州地铁M1线工程为例,提出了采用专家调查法评价工况风险等级,采用层次分析法评价风险因素权重的风险分析方法。对掘进机进、出施工过程中的风险进行了分析。根据风险分析的结果,提出了风险控制措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
RISK ANALYSIS OF TUNNEL SHIELD MACHINE DRIVING-IN AND DRIVING-OUT CONSTRUCTION PROCESS IN TUNNELLING ENGINEERING
Based on Zhengzhou Metro M1 line project,the risk analysis method is presented in the paper,which evaluates risk level of working condition using expert investigation method and evaluates weights of the risk factors using analytical hierarchy process.Risk of tunneling machine driving-in and driving-out construction process is analyzed.Risk control measures are put forward based on the results of risk analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
12408
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信