Advances in Production Engineering & Management最新文献

筛选
英文 中文
A novel multiple criteria decision-making approach based on fuzzy DEMATEL, fuzzy ANP and fuzzy AHP for mapping collection and distribution centers in reverse logistics 基于模糊DEMATEL、模糊ANP和模糊AHP的逆向物流集散中心映射多准则决策方法
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.329
L. Ocampo, Celbert M. Himang, A. Kumar, M. Brezocnik
{"title":"A novel multiple criteria decision-making approach based on fuzzy DEMATEL, fuzzy ANP and fuzzy AHP for mapping collection and distribution centers in reverse logistics","authors":"L. Ocampo, Celbert M. Himang, A. Kumar, M. Brezocnik","doi":"10.14743/apem2019.3.329","DOIUrl":"https://doi.org/10.14743/apem2019.3.329","url":null,"abstract":"The strategic location of reverse logistics facilities enables organizations to obtain optimal performance to collect end-of-line (EOL) products and distribute remanufactured products effectively and efficiently. The planning of facility location entails consideration of multiple essential criteria rather than optimizing a single criterion. This paper develops a methodological framework based on an integrated multiple criteria decision-making (MCDM) approach that captures the complexity of location planning for collection and distribution centers under fuzzy conditions utilizing decision making trial and evaluation laboratory (DEMATEL), analytic network process (ANP), and analytic hierarchy process (AHP). This novel approach aids decision-makers to simultaneously select a separate location for collection and distribution through a holistic assessment of a location's viability for both purposes. It advances the reverse logistics literature by considering multiple criteria and their interrelationships in the location selection process, along with uncertainty and vague-ness in decision making. Additionally, the proposed approach allows flexibility for decision-makers as they retain the control in picking a site based on its priority on being a collection or distribution center. Results show that government policies and regulations play a vital role in the facility location decision as they interact mostly with other criteria. Moreover, results also suggest that quantity and quality uncertainties for remanufacturing are significant factors that must be taken into consideration in the collection function, while economic and market-oriented issues are major concerns for a distribution function. This finding was observed through the application of the proposed methodological framework in a case study of the furniture industry in the Philippines. The practical implications of this study focus on being an aid in organizing and improving the operations of the reverse logistics sector of the Philippines. Finally, the proposed approach can be used to address general facility location problems in other industrial applications where tradeoffs among stakeholders or entities are well pronounced and decision-makers find it imperative that such tradeoffs must be carefully considered.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"23 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87299690","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 26
An integrated system for scheduling of processing and assembly operations with fuzzy operation time and fuzzy delivery time 具有模糊作业时间和模糊交货时间的加工装配作业调度集成系统
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.334
M. S. Yang, L. Ba, H. Zheng, Y. Liu, X. F. Wang, J. He, Y. Li
{"title":"An integrated system for scheduling of processing and assembly operations with fuzzy operation time and fuzzy delivery time","authors":"M. S. Yang, L. Ba, H. Zheng, Y. Liu, X. F. Wang, J. He, Y. Li","doi":"10.14743/apem2019.3.334","DOIUrl":"https://doi.org/10.14743/apem2019.3.334","url":null,"abstract":"This paper integrates the processing scheduling with assembly scheduling, aiming to satisfy the requirements for just-in-time (JIT) production. Considering the uncertainty of time factors in actual production, the operation time of the jobs were represented as triangular fuzzy numbers and the delivery time of the final product as trapezoidal fuzzy numbers. An extended job-shop scheduling probl em (JSP) considering abov e factors was proposed in this paper. A mathematical model was established for processing and assembly scheduling, aiming to achieve the mean satisfaction degree on delivery time. In light of the complexity of the problem, a genetic algorithm (GA) was designed to realize the fuzzy integrated optimization of processing and assembly under uncertainty. The proposed algorithm includes selection, crossover, mutation operations, and reflects the spiri ts of two-section real number encoding and elite protection strategy. Each part of the GA was designed in detail. Finally, the proposed model and algorithm were verified through a case study on processing and assembly scheduling. The model enjoys high practical value by taking the customer satisfaction of the delivery period as the main goal. The results show that our scheduling strategy mirrors the actual production situation and provides a good reference for JSP scheduling under multiple uncertainties. The best solution obtained by our model is more feasible than basic JSP in real production environment. © 2019 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"31 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72895990","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
A novel approximate dynamic programming approach for constrained equipment replacement problems: A case study 约束设备更换问题的一种新的近似动态规划方法:一个实例研究
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.333
H. Sadeghpour, A. Tavakoli, M. Kazemi, A. Pooya
{"title":"A novel approximate dynamic programming approach for constrained equipment replacement problems: A case study","authors":"H. Sadeghpour, A. Tavakoli, M. Kazemi, A. Pooya","doi":"10.14743/apem2019.3.333","DOIUrl":"https://doi.org/10.14743/apem2019.3.333","url":null,"abstract":"This paper presents a novel Approximate Dynamic Programming (ADP) approach to solve large-scale nonlinear constrained Equipment Replacement (ER) problems. Since ADP requires accurate estimations of states for future periods, a heuristic estimator based on data clustering was developed for the case study of this paper with small number of sampling periods. This ADP approach uses a Rollout Algorithm to formulate the problem in a Rolling horizon. The model was solved using Genetic Algorithm (GA). This framework was successfully applied for the decision making process of replacement / maintenance of 497 transformers in a power distribution company, which led to a significant reduction in the expected costs. The proposed framework possesses favourable features such as minimizing the effect of uncertainties in the state variables and measurement inaccuracies, which make the model robust and reliable. This work provides a novel general approach that can be employed for other industrial cases and operations research problems. © 2019 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"96 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85227229","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Effect of aluminium and chromium powder mixed dielectric fluid on electrical discharge machining effectiveness 铝铬粉混合介质液对电火花加工效果的影响
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.330
Manoj Modi, G. Agarwal
{"title":"Effect of aluminium and chromium powder mixed dielectric fluid on electrical discharge machining effectiveness","authors":"Manoj Modi, G. Agarwal","doi":"10.14743/apem2019.3.330","DOIUrl":"https://doi.org/10.14743/apem2019.3.330","url":null,"abstract":"This article studied the impacts of using different powders on the productivity of electro discharge machining (EDM) of Nimonic 8OA alloy. The powders used for experiments are chromium (Cr) and aluminium (Al), though these powders are in contrasts in their thermo‐physical characteristics. With the mixing of these powders in dielectric fluid, effect on surface roughness (SR), material removal rate (MRR), and mechanism of the machining process have been studied in this research work. On going through the results of experi‐ ments, it was observed that even volumetric proportion of powders, size of molecules, its density, electric resistance, and heat conductivity of additives were vital parameters that altogether influenced the productivity of powder mixed‐electro discharge machining (PMEDM) process. With addition of prop‐ er ratio of powders in dielectric fluid, it enhanced the material removal rate, and consequently, reduced the surface roughness. Under a similar molecule volumetric proportion tests, the minutes suspended molecule size of powder prompted the largest material removal rate and consequently, the surface roughness increased. Conclusion is that adding chromium powder improves to the highest material removal rate, but poor surface finish while adding aluminium powder has the reverse effects. © 2019 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"13 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81741728","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Evaluation of the sustainability of the micro-electrical discharge milling process 微放电铣削过程的可持续性评价
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.332
G. Pellegrini, C. Ravasio
{"title":"Evaluation of the sustainability of the micro-electrical discharge milling process","authors":"G. Pellegrini, C. Ravasio","doi":"10.14743/apem2019.3.332","DOIUrl":"https://doi.org/10.14743/apem2019.3.332","url":null,"abstract":"The sustainability evaluation of an industrial process is an actual issue: a process should not only grant part quality and high production rates at the lowest cost, but it should minimize its impact on the environment as well. Micro‐EDM (Electrical Discharge Machining) is widely used in micro machining for its small force and high precision and environmental aspects related this technology are taken into account. In this paper, an evaluation of the micro‐ED milling process concerning the sustainability manufacturing was made. For this purpose, a method to assess the sustainability process was developed, taking into account the energetic consumption, the environmental impact, the dielectric consumption, the wear of the electrode and the machining performance. This method was applied for the execution of micro‐pockets using two workpiece materials, two types of electrode and five types of dielectric, both liquid and gaseous. This analysis permits the identification of the critical aspects of the micro‐ED milling process form the point of view of the sustainability. The comparison between the different solutions in terms of electrode material and dielectric underlines interesting considerations about the usage of non‐traditional dielectrics. As regards electrode material, the environmental impact process when brass electrode is adopted is lower than tungsten carbide electrode. As concerns dielectric, water reveals to be the most sustainable dielectric; vegetable oil and oxygen, proved to be valid substitutes to traditional dielectrics under several viewpoints, including sustainability.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"2 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77306777","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method 基于免疫算法和模拟退火方法的ETO装配过程动态调度
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.327
C. Jiang, J. Xi
{"title":"Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method","authors":"C. Jiang, J. Xi","doi":"10.14743/apem2019.3.327","DOIUrl":"https://doi.org/10.14743/apem2019.3.327","url":null,"abstract":"With the increasing demand for customization, the engineer‐to‐order (ETO) production strategy plays an increasingly important role in today’s manufac‐ turing industry. The dynamic scheduling problem in ETO assembly process was investigated. We developed the mathematical model to represent the problem. In order to reduce rescheduling frequency, we introduced the con‐ cept of starting time deviation and improved the rolling horizon driven strat‐ egy. We proposed the hybrid algorithm combining immune algorithm (IA) and simulated annealing (SA) with the minimization of the rescheduling cost as the objective. The IA was designed as the global search process and the SA was introduced to improve the local searching ability. The scenario‐based approach was used to model the disruptions affecting the tasks to be executed. Performance of the rolling horizon driven strategy and the hybrid algorithm were evaluated through simulations, the experiment analysis showed the best parameters of rolling horizon methods and demonstrated the feasibility of the hybrid algorithm. The hybrid algorithm was tested on different scale bench‐ mark instances and the case that collected from a steam turbine assembly shop. The quality of solution in terms of cost obtained by the hybrid algorithm was found superior to the other three algorithms proposed in the literature. © 2019 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"128 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89687247","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 11
Multi-objective scheduling of cloud manufacturing resources through the integration of Cat swarm optimization and Firefly algorithm 结合Cat群算法和Firefly算法的云制造资源多目标调度
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.331
Y. Du, J. Wang, L. Lei
{"title":"Multi-objective scheduling of cloud manufacturing resources through the integration of Cat swarm optimization and Firefly algorithm","authors":"Y. Du, J. Wang, L. Lei","doi":"10.14743/apem2019.3.331","DOIUrl":"https://doi.org/10.14743/apem2019.3.331","url":null,"abstract":"This paper attempts to minimize the makespan and cost and balance the load rate of the process scheduling of cloud manufacturing resources. For this purpose, a multiobjective scheduling model was established to achieve the minimal makespan, minimal cost and balanced load rate. Next, the cat swarm optimization (CSO) and the firefly algorithm (FA) were combined into a hybrid multi -objective scheduling algorithm. Finally, the hybrid algorithm was verified through CloudSim simulation. The simulation resul ts show that the algori thm output the optimal scheduling pl an in a short time. This research not only provides an effective way to find the global optimal solution, within the shortest possible time, to the process scheduling problem of cloud manufacturing resources with multiple objectives, but also promotes the application of swarm intelligence algorithms in job-shop scheduling problems. © 2019 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"65 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91393641","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 13
A blockchain-based smart contract trading mechanism for energy power supply and demand network 一种基于区块链的能源供需网络智能合约交易机制
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-09-30 DOI: 10.14743/apem2019.3.328
W. Hu, Y. Hu, W. Yao, W. Q. Lu, H. Li, Z. Lv
{"title":"A blockchain-based smart contract trading mechanism for energy power supply and demand network","authors":"W. Hu, Y. Hu, W. Yao, W. Q. Lu, H. Li, Z. Lv","doi":"10.14743/apem2019.3.328","DOIUrl":"https://doi.org/10.14743/apem2019.3.328","url":null,"abstract":"","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"66 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77669377","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
A new architecture model for smart manufacturing: A performance analysis and comparison with the RAMI 4.0 reference model 一种新的智能制造体系结构模型:与RAMI 4.0参考模型的性能分析与比较
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-06-09 DOI: 10.14743/APEM2019.2.318
M. Resman, M. Pipan, M. Šimic, N. Herakovič
{"title":"A new architecture model for smart manufacturing: A performance analysis and comparison with the RAMI 4.0 reference model","authors":"M. Resman, M. Pipan, M. Šimic, N. Herakovič","doi":"10.14743/APEM2019.2.318","DOIUrl":"https://doi.org/10.14743/APEM2019.2.318","url":null,"abstract":"In this paper we proposed a new architectural model of the smart factory to allow production experts to make easier and more exact planning of new, smart factories by using all the key technologies of Industry 4.0. The existing complex reference architectural model of Industry 4.0 (RAMI 4.0) offers a good overview of the smart-factory architecture, but it leads to some limitations and a lack of clarity for the users. To overcome these limitations, we have developed a simple model with the entire and very simple architecture of the smart factory, based on the concept of distributed systems with exact information and the data flows between them. The proposed architectural model enables more reliable and simple modelling of the smart factory than the existing RAMI 4.0 model. Our approach improves the existing methodolo-gy for planning the smart factory and makes all the necessary steps clearer. At the end of the paper a comparison of the proposed architectural model LASFA (LASIM Smart Factory) with the existing RAMI 4.0 model was made. The developed LASFA model was already successfully implemented in the laboratory environment for building the demo centre of a smart factory.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"14 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-06-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80842086","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 43
An improved flower pollination algorithm for optimization of intelligent logistics distribution center 一种用于智能物流配送中心优化的改进授粉算法
IF 3.6 3区 工程技术
Advances in Production Engineering & Management Pub Date : 2019-06-09 DOI: 10.14743/APEM2019.2.320
W. Hu
{"title":"An improved flower pollination algorithm for optimization of intelligent logistics distribution center","authors":"W. Hu","doi":"10.14743/APEM2019.2.320","DOIUrl":"https://doi.org/10.14743/APEM2019.2.320","url":null,"abstract":"It is easy to fall into local optimal solution in solving the optimal location of intelligent logistics distribution center by traditional method and the result of optimization is not ideal. For this, the study puts forward an optimization method of intelligent logistics distribution center based on improved flower pollination algorithm. This method uses the logic self-mapping function to carry out chaotic disturbance to the pollen grains, so that the pollen grain set lacking the mutation mechanism has strong self-adaptability, and the convergence of the optimal solution in the later stage of the algorithm is effectively prevented. The boundary buffer factor is used to buffer the cross-boundary pollen grains adaptively so as to prevent the algorithm from the local optimization, and the convergence speed and the optimization accuracy of the algorithm can be improved obviously in processing the optimal location of intelligent logistics distribution center. The convergence of the algorithm is analyzed theoretically by using the real number coding method, and the biological model and theoretical basis of the algorithm are given. The experimental results show that the proposed method has better performance than the traditional one, and the algorithm outperforms a genetic algorithm and particle swarm algorithm. It provides a feasible solution for the intelligent logistics distribution center location strategy. It affords a good reference for improving and optimizing the internal logistics of the manufacturing system and the operational efficiency of the entire intelligent logistics system. © 2019 CPE, University of Maribor. All rights reserved.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"24 1","pages":""},"PeriodicalIF":3.6,"publicationDate":"2019-06-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82247585","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 14
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信