{"title":"Coopetition capability of international joint ventures for high-speed railway projects","authors":"Yanliang Niu, Huimin Li, Bo Xia, Xiaopeng Deng","doi":"10.1080/15623599.2023.2289752","DOIUrl":"https://doi.org/10.1080/15623599.2023.2289752","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138601356","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Enhanced planning and scheduling in building construction projects: an innovative approach to overcome scheduling challenges","authors":"Qais Amarkhil, E. Elwakil","doi":"10.1080/15623599.2023.2286888","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286888","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138600246","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANN model predicting quality performance for building construction projects in Rwanda","authors":"Esperance Umuhoza, Sung-Hoon An","doi":"10.1080/15623599.2023.2286710","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286710","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139213047","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Didas S. Lello, Yongchun Huang, Fidelis Emuze, S. Alananga
{"title":"Professional knowledge infusion and service performance within outbound consultant-supplier interfaces in Tanzania’s construction industry: can networking and stakeholder support play cards?","authors":"Didas S. Lello, Yongchun Huang, Fidelis Emuze, S. Alananga","doi":"10.1080/15623599.2023.2286049","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286049","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139226661","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Key audit matters disclosure: do they reveal construction firm’s risk of financial distress? Evidence from Ethiopia","authors":"Fekadu Agmas Wassie, László Péter Lakatos","doi":"10.1080/15623599.2023.2286882","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286882","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139233481","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Investigating critical success factors and risks of construction technology startups: a systematic literature review","authors":"Busra Yucel, S. Azhar","doi":"10.1080/15623599.2023.2286109","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286109","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139229130","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Applying work measurements to identify productivity potentials: the case of prefabricated concrete elements","authors":"S. Lindhard","doi":"10.1080/15623599.2023.2286115","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286115","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139243796","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques","authors":"Yun-Xia Ye, Ming Shan, Xin Gao, Qin Li, Hua Zhang","doi":"10.1080/15623599.2023.2286046","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286046","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139249272","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Nan Zhang, Jingwen Wang, Mohamed Al-Hussein, Xianfei Yin
{"title":"BIM-based automated design of drainage systems for panelized residential buildings","authors":"Nan Zhang, Jingwen Wang, Mohamed Al-Hussein, Xianfei Yin","doi":"10.1080/15623599.2022.2085853","DOIUrl":"https://doi.org/10.1080/15623599.2022.2085853","url":null,"abstract":"Abstract The development of building information modelling has facilitated the improvement of cost and time management in panelized construction. This research proposes an automated method to design and draft drainage systems in the BIM environment. The proposed method can improve design efficiency, eliminate design errors, and reduce material waste. In order to improve production efficiency at the panelized construction plant, the drainage pipe network is separated into smaller components at the geometric boundaries of the plumbing panel which is a floor or wall panel through which pipes pass. Meanwhile, a bill of materials for each plumbing panel is generated for the purpose of further cutting optimization. A prototyped BIM extension application, an add-on to Autodesk Revit, is developed as a proof of concept. A case study of residential drainage system design and optimization is presented to illustrate the feasibility of the proposed framework. As the key contribution of this research, the integration of the BIM model with the automated design system, rule-based pipe route planning approach, and optimal cutting stock algorithm achieves the automation in drainage system design in the context of panelized construction to improve design and production efficiency.","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139262405","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Brian H. W. Guo, Vicente A. Gonzalez, T. Puolitaival, W. Enegbuma, Yang Zou
{"title":"Bridging the gap between building information modelling education and practice: a competency-based education perspective","authors":"Brian H. W. Guo, Vicente A. Gonzalez, T. Puolitaival, W. Enegbuma, Yang Zou","doi":"10.1080/15623599.2022.2077546","DOIUrl":"https://doi.org/10.1080/15623599.2022.2077546","url":null,"abstract":"Abstract This study reports a case study that investigates the gap between BIM tertiary education and the building industry’s needs in New Zealand (NZ). In specific, it aims to (1) identify the industry’s requirements on BIM competencies, (2) examine the status quo of BIM tertiary education in NZ, and (3) identify and analyse the gaps between current BIM education and the industry’s needs. Data were collected through BIM job advertisement to identify the industry’s requirements of BIM competencies and top BIM uses. Data of thirty-three courses were also collected from nine tertiary institutions. Results indicated that there were discrepancies between the type and level (i.e. cognitive levels) of BIM competencies. It was indicated that missing links existed in almost all BIM uses that were taught, except 4D modelling. A large proportion of learning outcomes were focused on ‘understanding’ for several BIM uses, while NZ BIM Handbook requires higher levels of application and evaluation. To bridge the gaps, core competence sets should be determined by disciplines. BIM competencies can also be classified based on BIM uses, BIM processes and phases, and project roles. This paper proposed a conceptual framework, which suggests the way ahead towards future competency-based BIM education.","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139260942","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}