International Journal of Construction Management最新文献

筛选
英文 中文
Ranking the benefits of early contractor involvement: a client’s perspective 早期承包商参与的好处排序:客户的观点
IF 3.9
International Journal of Construction Management Pub Date : 2024-05-20 DOI: 10.1080/15623599.2024.2355766
Tausif Ahmed Ishtiaque, P. Wondimu, Nadina Memić, Bjørn Sørskot Andersen, O. Lædre, O. J. Klakegg
{"title":"Ranking the benefits of early contractor involvement: a client’s perspective","authors":"Tausif Ahmed Ishtiaque, P. Wondimu, Nadina Memić, Bjørn Sørskot Andersen, O. Lædre, O. J. Klakegg","doi":"10.1080/15623599.2024.2355766","DOIUrl":"https://doi.org/10.1080/15623599.2024.2355766","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141120658","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Investigating construction delays in cold storage projects in the Philippines 菲律宾冷藏项目施工延误调查
IF 3.9
International Journal of Construction Management Pub Date : 2024-05-20 DOI: 10.1080/15623599.2024.2350279
Fiehl Amor R. Laroza
{"title":"Investigating construction delays in cold storage projects in the Philippines","authors":"Fiehl Amor R. Laroza","doi":"10.1080/15623599.2024.2350279","DOIUrl":"https://doi.org/10.1080/15623599.2024.2350279","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141120863","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Developing a framework for mitigating pilfering: a case study of selected Nigeria’s construction sites via soft system methodology 制定减少偷窃行为的框架:通过软系统方法对尼日利亚部分建筑工地进行案例研究
IF 3.9
International Journal of Construction Management Pub Date : 2024-05-20 DOI: 10.1080/15623599.2024.2352177
Andrew Ebekozien, C. Aigbavboa, M. S. Samsurijan, W. Thwala
{"title":"Developing a framework for mitigating pilfering: a case study of selected Nigeria’s construction sites via soft system methodology","authors":"Andrew Ebekozien, C. Aigbavboa, M. S. Samsurijan, W. Thwala","doi":"10.1080/15623599.2024.2352177","DOIUrl":"https://doi.org/10.1080/15623599.2024.2352177","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141120420","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Developing preliminary cost estimates for foundation systems of high-rise buildings 编制高层建筑地基系统的初步成本估算
IF 3.9
International Journal of Construction Management Pub Date : 2024-05-17 DOI: 10.1080/15623599.2024.2352180
Ahmed Rashad, Hosam Hegazy, Jiansong Zhang, Ibrahim M. Mahdi, Ibrahim Abdel-Rasheed, Ahmed M. Ebid
{"title":"Developing preliminary cost estimates for foundation systems of high-rise buildings","authors":"Ahmed Rashad, Hosam Hegazy, Jiansong Zhang, Ibrahim M. Mahdi, Ibrahim Abdel-Rasheed, Ahmed M. Ebid","doi":"10.1080/15623599.2024.2352180","DOIUrl":"https://doi.org/10.1080/15623599.2024.2352180","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141127009","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Automatic generation of pipelines from 2D CAD drawings to 3D IFC models using a parametric method 使用参数法自动生成从二维 CAD 图纸到三维 IFC 模型的管线
IF 3.9
International Journal of Construction Management Pub Date : 2024-05-15 DOI: 10.1080/15623599.2024.2353927
Dixian Yin, Xueyuan Deng, Kun Lu
{"title":"Automatic generation of pipelines from 2D CAD drawings to 3D IFC models using a parametric method","authors":"Dixian Yin, Xueyuan Deng, Kun Lu","doi":"10.1080/15623599.2024.2353927","DOIUrl":"https://doi.org/10.1080/15623599.2024.2353927","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140974462","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Current benefits and future possibilities with digital field reporting 数字实地报告的当前优势和未来可能性
IF 3.9
International Journal of Construction Management Pub Date : 2024-04-25 DOI: 10.1080/15623599.2024.2340923
Linda Cusumano, Orestis Farmakis, Mats Granath, Nilla Olsson, R. Jockwer, R. Rempling
{"title":"Current benefits and future possibilities with digital field reporting","authors":"Linda Cusumano, Orestis Farmakis, Mats Granath, Nilla Olsson, R. Jockwer, R. Rempling","doi":"10.1080/15623599.2024.2340923","DOIUrl":"https://doi.org/10.1080/15623599.2024.2340923","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140654351","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Machine learning unveils the complex nonlinearity of concrete materials’ uniaxial compressive strength 机器学习揭示了混凝土材料单轴抗压强度的复杂非线性特性
IF 3.9
International Journal of Construction Management Pub Date : 2024-04-25 DOI: 10.1080/15623599.2024.2345008
Siddhi Pandey, Satish Paudel, Kabin Devkota, Kushum Kshetri, P. G. Asteris
{"title":"Machine learning unveils the complex nonlinearity of concrete materials’ uniaxial compressive strength","authors":"Siddhi Pandey, Satish Paudel, Kabin Devkota, Kushum Kshetri, P. G. Asteris","doi":"10.1080/15623599.2024.2345008","DOIUrl":"https://doi.org/10.1080/15623599.2024.2345008","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140658730","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A comprehensive study incorporating structural equation modeling and factor analysis study on the evaluation of performance criteria for infrastructure development projects 关于基础设施开发项目绩效标准评估的结构方程模型和因素分析综合研究
IF 3.9
International Journal of Construction Management Pub Date : 2024-04-24 DOI: 10.1080/15623599.2024.2343505
Kumkum Bhattacharya, Debasis Sarkar, Shobhit Chaturvedi
{"title":"A comprehensive study incorporating structural equation modeling and factor analysis study on the evaluation of performance criteria for infrastructure development projects","authors":"Kumkum Bhattacharya, Debasis Sarkar, Shobhit Chaturvedi","doi":"10.1080/15623599.2024.2343505","DOIUrl":"https://doi.org/10.1080/15623599.2024.2343505","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140662210","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects 调查阿富汗建筑项目时间延误和成本超支原因的综合方法
IF 3.9
International Journal of Construction Management Pub Date : 2024-04-24 DOI: 10.1080/15623599.2024.2344892
Hafizullah Sadat, Nivea Thomas
{"title":"An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects","authors":"Hafizullah Sadat, Nivea Thomas","doi":"10.1080/15623599.2024.2344892","DOIUrl":"https://doi.org/10.1080/15623599.2024.2344892","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140663103","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A framework for evaluation of construction and demolition waste management alternatives using MCDA techniques in the context of Dhaka City 在达卡市使用 MCDA 技术评估建筑和拆除废物管理替代方案的框架
IF 3.9
International Journal of Construction Management Pub Date : 2024-04-24 DOI: 10.1080/15623599.2024.2337083
Dewan Sabbir Ahammed Rayhan, I. Bhuiyan
{"title":"A framework for evaluation of construction and demolition waste management alternatives using MCDA techniques in the context of Dhaka City","authors":"Dewan Sabbir Ahammed Rayhan, I. Bhuiyan","doi":"10.1080/15623599.2024.2337083","DOIUrl":"https://doi.org/10.1080/15623599.2024.2337083","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140659945","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信