Geotechnical Engineering最新文献

筛选
英文 中文
Excavations in gassy soils 在含气土壤中挖掘
IF 0.3
Geotechnical Engineering Pub Date : 2002-07-01 DOI: 10.1680/GENG.155.3.159.38674
R. K. Rowe, L. Goveas, J. Dittrich
{"title":"Excavations in gassy soils","authors":"R. K. Rowe, L. Goveas, J. Dittrich","doi":"10.1680/GENG.155.3.159.38674","DOIUrl":"https://doi.org/10.1680/GENG.155.3.159.38674","url":null,"abstract":"Gassy soils are soils that contain gases under positive pressure. They can have a significant impact on the stability of excavations. This briefing note summarises two cases in southern Ontario, Canada, that highlight the importance of continued research into the behaviour of gassy soils.","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"159-161"},"PeriodicalIF":0.3,"publicationDate":"2002-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67400972","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Pilot in situ auger mixing treatment of a contaminated site. Part 4. Performance at five years 试验现场螺旋钻混合处理污染场地。第4部分。五年的表现
IF 0.3
Geotechnical Engineering Pub Date : 2002-07-01 DOI: 10.1680/GENG.2002.155.3.187
A. Al-Tabbaa, N. Boes
{"title":"Pilot in situ auger mixing treatment of a contaminated site. Part 4. Performance at five years","authors":"A. Al-Tabbaa, N. Boes","doi":"10.1680/GENG.2002.155.3.187","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.3.187","url":null,"abstract":"Parts 1, 2 and 3 of this series of publications gave details of the development and application of a pilot in situ auger mixing treatment on a contaminated site in West Drayton, Middlesex. The trea...","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"187-202"},"PeriodicalIF":0.3,"publicationDate":"2002-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.3.187","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401941","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 27
Three-dimensional effects in the construction of a long retaining wall 长挡土墙施工中的三维效应
IF 0.3
Geotechnical Engineering Pub Date : 2002-07-01 DOI: 10.1680/GENG.155.3.163.38682
S. Gourvenec, W. Powrie, E. Moor
{"title":"Three-dimensional effects in the construction of a long retaining wall","authors":"S. Gourvenec, W. Powrie, E. Moor","doi":"10.1680/GENG.155.3.163.38682","DOIUrl":"https://doi.org/10.1680/GENG.155.3.163.38682","url":null,"abstract":"Although long retaining walls are usually analysed in the permanent condition by means of a plane strain analysis, three-dimensional effects may be significant in limiting ground movements at certain stages during construction. This is particularly true for embedded diaphragm-type retaining walls propped at formation level. In this paper, a three-dimensional finite element analysis representing a typical construction sequence for such a wall is compared with a corresponding plane strain analysis and field data from the A4/A46 Batheaston–Swainswick bypass. The results are used to assess the significance of three-dimensional effects during construction, and suggest how these can be utilised to minimise ground movements.","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"163-173"},"PeriodicalIF":0.3,"publicationDate":"2002-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67400981","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 14
IMPROVED USE OF PULVERISED FUEL ASH AS GENERAL FILL 改进了粉状燃料灰作为一般填料的使用
IF 0.3
Geotechnical Engineering Pub Date : 2002-04-01 DOI: 10.1680/GENG.2002.155.2.133
M. Winter, B. Clarke
{"title":"IMPROVED USE OF PULVERISED FUEL ASH AS GENERAL FILL","authors":"M. Winter, B. Clarke","doi":"10.1680/GENG.2002.155.2.133","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.2.133","url":null,"abstract":"In the UK, the introduction of a tax on landfill and the tightening of planning consents for disposal provided powerful incentives for the use of industrial by-products such as pulverised fuel ash (PFA) in construction. PFA (known as fly ash in some parts of the world) has a long history of successful use as general fill, including applications in environmentally sensitive locations. However, the current commonly used Specification for Highway Works treats PFA as a manufactured material, and applies an end-product specification for compaction. This form of specification is restrictive as it requires that the maximum dry density and optimum moisture content be determined for each consignment of PFA delivered to site, a process that can take up to two days. In addition, the Specification requires testing to determine effective shear strength parameters under fully saturated conditions for embankment design. No guidance is given on whether peak or post-peak parameters are to be selected for design purposes o...","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"133-141"},"PeriodicalIF":0.3,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.2.133","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401863","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 13
Soils and Foundations 土壤和地基
IF 0.3
Geotechnical Engineering Pub Date : 2002-04-01 DOI: 10.1680/GENG.155.2.147.38658
V. Hope
{"title":"Soils and Foundations","authors":"V. Hope","doi":"10.1680/GENG.155.2.147.38658","DOIUrl":"https://doi.org/10.1680/GENG.155.2.147.38658","url":null,"abstract":"","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"147-148"},"PeriodicalIF":0.3,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67400937","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Briefing: Geotechnical engineering and building research: the early days of soil mechanics at BRS—Part 4, 1948–1957 简介:岩土工程和建筑研究:brs的早期土力学,第4部分,1948-1957
IF 0.3
Geotechnical Engineering Pub Date : 2002-04-01 DOI: 10.1680/GENG.2002.155.2.93
A. Penman
{"title":"Briefing: Geotechnical engineering and building research: the early days of soil mechanics at BRS—Part 4, 1948–1957","authors":"A. Penman","doi":"10.1680/GENG.2002.155.2.93","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.2.93","url":null,"abstract":"An essay on the foremost British government soil mechanics laboratory from earliest times to 1957.","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"93-99"},"PeriodicalIF":0.3,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.2.93","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401931","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Foundation design for the refloat of the Maureen steel gravity platform 莫林钢重力平台复浮基础设计
IF 0.3
Geotechnical Engineering Pub Date : 2002-04-01 DOI: 10.1680/GENG.2002.155.2.111
P. Broughton, R. Davies, T. Aldridge, T. Carrington
{"title":"Foundation design for the refloat of the Maureen steel gravity platform","authors":"P. Broughton, R. Davies, T. Aldridge, T. Carrington","doi":"10.1680/GENG.2002.155.2.111","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.2.111","url":null,"abstract":"The Maureen Oil Field, located in the UK sector of the North Sea, was developed in the early 1980s, with the installation of the world's largest steel gravity platform, together with the installation of an export pipeline to an offshore concrete articulated loading column. Production in the field ceased in October 1999, and the facilities at the Maureen location were removed in the summer of 2001 as part of the decommissioning process. The largest element for removal and decommissioning was the steel gravity platform of about 1100 MN (110 000 t). This paper describes all the geotechnical engineering works, associated with the hydraulic skirt extraction/jacking of the gravity platform from the seabed, which were executed prior to the refloat and tow of the platform to deep water inshore moorings, together with a summary of results from the actual skirt extraction/jacking process, which was executed in June 2001.","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"111-118"},"PeriodicalIF":0.3,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.2.111","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401801","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Active and passive earth pressure coefficients by a kinematical approach 主动和被动土压力系数的运动学方法
IF 0.3
Geotechnical Engineering Pub Date : 2002-04-01 DOI: 10.1680/GENG.2002.155.2.119
A. Soubra, B. Macuh
{"title":"Active and passive earth pressure coefficients by a kinematical approach","authors":"A. Soubra, B. Macuh","doi":"10.1680/GENG.2002.155.2.119","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.2.119","url":null,"abstract":"A simple method is proposed for calculating the active and passive earth pressure coefficients in the general case of an inclined wall and a sloping backfill. The approach used is based on rotational log-spiral failure mechanisms in the framework of the upper-bound theorem of limit analysis. It is shown that the energy balance equation of a rotational log-spiral mechanism is equivalent to the moment equilibrium equation about the centre of the log-spiral. Numerical optimisation of the active and passive earth pressure coefficients is performed automatically by a spreadsheet optimisation tool. The implementation of the proposed method is illustrated using an example. The predictions by the present method are compared with those given by other authors.","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"119-131"},"PeriodicalIF":0.3,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.2.119","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401812","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 135
THE USE OF COMPENSATION GROUTING IN TUNNELLING: A CASE STUDY 补偿注浆在隧道施工中的应用:一个实例研究
IF 0.3
Geotechnical Engineering Pub Date : 2002-04-01 DOI: 10.1680/GENG.2002.155.2.101
S.W. Lee
{"title":"THE USE OF COMPENSATION GROUTING IN TUNNELLING: A CASE STUDY","authors":"S.W. Lee","doi":"10.1680/GENG.2002.155.2.101","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.2.101","url":null,"abstract":"At the London Docklands Light Railway Lewisham Extension (DLR-LWE) twin tunnelling project, compensation grouting was carried out beneath sensitive structures to prevent excessive settlement due to tunnelling. However, excessive grout injections might exert extra loads on the tunnels underneath. This issue has become a major concern for tunnelling and grouting contractors after a report by the UK's Health and Safety Executive in 2000, which listed grouting force as one of the possible factors that might have caused the collapse of the London Heathrow Express tunnels in 1994. This paper presents the extensive field monitoring data compiled by the tunnelling contractor on surface and building settlements as well as tunnel lining deformations caused by compensation grouting. It will be shown that the final corrected building settlements, incorporating compensation grouting, were about 5 mm. In the case of greenfield settlement the maximum observed settlement was less than 15 mm, a criterion specified by Lond...","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"101-109"},"PeriodicalIF":0.3,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.2.101","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401771","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Geotechnical engineering and building research: the early days of soil mechanics at BRS?Part 3, 1944?1948 岩土工程与建筑研究:BRS早期的土力学?第三部分,1944年?1948
IF 0.3
Geotechnical Engineering Pub Date : 2002-01-01 DOI: 10.1680/GENG.2002.155.1.27
A. Penman
{"title":"Geotechnical engineering and building research: the early days of soil mechanics at BRS?Part 3, 1944?1948","authors":"A. Penman","doi":"10.1680/GENG.2002.155.1.27","DOIUrl":"https://doi.org/10.1680/GENG.2002.155.1.27","url":null,"abstract":"An essay on the foremost British government soil mechanics laboratory from earlies times to 1957.","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"155 1","pages":"27-34"},"PeriodicalIF":0.3,"publicationDate":"2002-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2002.155.1.27","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67401670","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信