Hydrotechnical Construction最新文献

筛选
英文 中文
Results of an Inspection of the Hydraulic Structures of the Chirkey Hydroelectric Power Plant Chirkey水电站水工结构检查结果
Hydrotechnical Construction Pub Date : 2001-09-01 DOI: 10.1023/A:1013773424556
É. Bellendir
{"title":"Results of an Inspection of the Hydraulic Structures of the Chirkey Hydroelectric Power Plant","authors":"É. Bellendir","doi":"10.1023/A:1013773424556","DOIUrl":"https://doi.org/10.1023/A:1013773424556","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"51 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128717568","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Piezometric Observations and the Determination of Integral Parameters for Local and General Infiltration in a Dam-Base System 坝基系统局部和整体入渗的压测观测和积分参数的确定
Hydrotechnical Construction Pub Date : 2001-09-01 DOI: 10.1023/A:1013777525465
M. Pavchich, A. V. Stul'kevich
{"title":"Piezometric Observations and the Determination of Integral Parameters for Local and General Infiltration in a Dam-Base System","authors":"M. Pavchich, A. V. Stul'kevich","doi":"10.1023/A:1013777525465","DOIUrl":"https://doi.org/10.1023/A:1013777525465","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"80 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114781647","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Protecting External Rock Bodies from Blasting Damage 保护外部岩体免受爆破破坏
Hydrotechnical Construction Pub Date : 2001-09-01 DOI: 10.1023/A:1013733710444
M. Etkin, A. E. Azarkovich, A. Sapronov, V. G. Vartanov
{"title":"Protecting External Rock Bodies from Blasting Damage","authors":"M. Etkin, A. E. Azarkovich, A. Sapronov, V. G. Vartanov","doi":"10.1023/A:1013733710444","DOIUrl":"https://doi.org/10.1023/A:1013733710444","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127090093","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Investigation of Temperature Behavior of Concrete Used in the Slope Lining Slabs in the Upper Basin of the Zagorsk Nuclear Power Plant 扎戈尔斯克核电站上盆边坡衬砌板混凝土温度特性研究
Hydrotechnical Construction Pub Date : 2001-09-01 DOI: 10.1023/A:1013769323648
S. V. Sharkunov, P. M. Ermoshkin
{"title":"Investigation of Temperature Behavior of Concrete Used in the Slope Lining Slabs in the Upper Basin of the Zagorsk Nuclear Power Plant","authors":"S. V. Sharkunov, P. M. Ermoshkin","doi":"10.1023/A:1013769323648","DOIUrl":"https://doi.org/10.1023/A:1013769323648","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126721587","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Geodynamic Effects on the Dams in Cascade of the Sulak Hydraulic Power Systems 苏拉克水电站梯级坝的地球动力学效应
Hydrotechnical Construction Pub Date : 2001-09-01 DOI: 10.1023/A:1013721407718
A. Marchuk, A. Abakarov, M. Daniyalov, O. Asmanov, M. M. Mirzaliev, R. A. Levkovich
{"title":"Geodynamic Effects on the Dams in Cascade of the Sulak Hydraulic Power Systems","authors":"A. Marchuk, A. Abakarov, M. Daniyalov, O. Asmanov, M. M. Mirzaliev, R. A. Levkovich","doi":"10.1023/A:1013721407718","DOIUrl":"https://doi.org/10.1023/A:1013721407718","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129333124","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Evaluation of the Stress-Strain State and Strength of Reinforced-Concrete Structures of Compensation Sections in the Penstocks of the Zagorsk Pumped-Storage Power Plant 扎戈尔斯克抽水蓄能电站压力管道补偿断面钢筋混凝土结构应力-应变状态及强度评价
Hydrotechnical Construction Pub Date : 2001-09-01 DOI: 10.1023/A:1013717306809
O. Rubin, Yu. A. Il’in, S. Lisichkin, A. Nefedov, N. V. Rozanova, V. Chernenko
{"title":"Evaluation of the Stress-Strain State and Strength of Reinforced-Concrete Structures of Compensation Sections in the Penstocks of the Zagorsk Pumped-Storage Power Plant","authors":"O. Rubin, Yu. A. Il’in, S. Lisichkin, A. Nefedov, N. V. Rozanova, V. Chernenko","doi":"10.1023/A:1013717306809","DOIUrl":"https://doi.org/10.1023/A:1013717306809","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"52 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126629692","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Generalized Representation of Seismic Process for Dynamic Calculation of the Effect of Explosions 爆炸效应动力计算中地震过程的广义表示
Hydrotechnical Construction Pub Date : 2001-08-15 DOI: 10.1023/A:1012861908702
M. I. Shuifer
{"title":"Generalized Representation of Seismic Process for Dynamic Calculation of the Effect of Explosions","authors":"M. I. Shuifer","doi":"10.1023/A:1012861908702","DOIUrl":"https://doi.org/10.1023/A:1012861908702","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"33 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115810516","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Designing and Performing Water Drawdown Operations in the Construction of Major Power Plants 在大型发电厂的建设中设计和执行排水操作
Hydrotechnical Construction Pub Date : 2001-08-01 DOI: 10.1023/A:1012812305976
E. A. Lokhankova, V. A. Nepomnyashchii
{"title":"Designing and Performing Water Drawdown Operations in the Construction of Major Power Plants","authors":"E. A. Lokhankova, V. A. Nepomnyashchii","doi":"10.1023/A:1012812305976","DOIUrl":"https://doi.org/10.1023/A:1012812305976","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129705055","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Designing and Constructing Antileakage Devices in the Foundations of the Bureya Dam 布里亚大坝地基防渗装置的设计与施工
Hydrotechnical Construction Pub Date : 2001-08-01 DOI: 10.1023/A:1012801722814
É. S. Argal, G. G. Tuzhikhin
{"title":"Designing and Constructing Antileakage Devices in the Foundations of the Bureya Dam","authors":"É. S. Argal, G. G. Tuzhikhin","doi":"10.1023/A:1012801722814","DOIUrl":"https://doi.org/10.1023/A:1012801722814","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123489570","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Investigations of the Penetrability of Cement Grout into a Cavity Having a Small Opening 水泥浆液在小开口空腔中的渗透性研究
Hydrotechnical Construction Pub Date : 2001-08-01 DOI: 10.1023/A:1012866009610
V. A. Ashikhmen, L. Pronina
{"title":"Investigations of the Penetrability of Cement Grout into a Cavity Having a Small Opening","authors":"V. A. Ashikhmen, L. Pronina","doi":"10.1023/A:1012866009610","DOIUrl":"https://doi.org/10.1023/A:1012866009610","url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131309811","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信