Modular and Offsite Construction (MOC) Summit Proceedings最新文献

筛选
英文 中文
Mass Timber Modular Construction: Developments in Oregon 大规模木材模块化建筑:俄勒冈州的发展
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS97
J. Sheine, M. Donofrio, M. Gershfeld
{"title":"Mass Timber Modular Construction: Developments in Oregon","authors":"J. Sheine, M. Donofrio, M. Gershfeld","doi":"10.29173/MOCS97","DOIUrl":"https://doi.org/10.29173/MOCS97","url":null,"abstract":"With the mass timber industry taking off in 2015 in Oregon, when DR Johnson Lumber in Riddle, OR started producing CLT panels, government officials were eager to support it for its promise of economic development in rural communities and also had hopes of addressing the state’s affordable housing crisis using mass timber modular construction. While mass timber modular housing has had some success in Europe, the different construction standards and building culture in the United States make it more challenging. With few areas in Oregon in which housing is likely to be built over six stories tall or in large-scale developments, it did not seem possible that mass timber could solve the affordable housing crisis where it cannot compete in cost with standard light wood-frame construction. However, it did seem feasible that mass timber panels, which are so well-suited to customizable pre-fabrication through digital manufacturing, might be successful in an alternative building type for modular construction: classrooms. In successful models of mass timber modular classrooms in Austria and Germany, schools were built in much shorter timeframes and for 25% less cost than steel or concrete construction. The authors are now working with a modular building manufacturer in Oregon, Modern Building Systems (MBS), that produces custom-designed modular light wood-frame classrooms. While mass timber classrooms cannot compete in price with light wood-frame, particularly in single-story applications, they could be competitive for two story (or taller) schools, which are usually built using steel braced-frame and concrete block. Because MBS is 18 miles west of Freres Lumber, which is newly producing Mass Plywood Panels (MPP), and the MBS facility needs no modifications to use MPP instead of wood-frame, the authors are working with them to design an economically competitive mass timber module, with several potential clients interested in testing a prototype in 2019.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127027576","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Consequences of the BC Energy Step Code on Offsite Construction BC省能源步骤规范对非现场施工的影响
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS126
Guido Wimmers, A. Conroy
{"title":"Consequences of the BC Energy Step Code on Offsite Construction","authors":"Guido Wimmers, A. Conroy","doi":"10.29173/MOCS126","DOIUrl":"https://doi.org/10.29173/MOCS126","url":null,"abstract":"In Canada, off-site construction is still the exception rather than the norm when it comes to wood construction. In Europe’s Alpine Region or Scandinavian countries, off-site construction is standard when it comes to wood construction. This paper will focus on the reasons why Canada’s wood construction industry will shift from mainly on-site to mainly off-site construction over the next 10 to 15 years. In countries with relatively demanding requirements on energy efficiency and air tightness, off-site construction has been dominating the market for more than 20 years. British Columbia adopted the BC Energy Step Code in 2017, a roadmap defining the energy efficiency of buildings over the coming years leading up to 2032, when all new construction will be required to be Net Zero ready. It is expected that the National Building Code of Canada will also encourage higher energy performance levels in the near future. Consequently, thermally better-performing envelopes will have to be produced and rigorous air tightness levels will have to be achieved for the sustainability goals given by the province. Envelope assemblies will get thicker, bulkier and heavier to meet these requirements. In this regard, a market shift to a greater amount of off-site construction is likely to be experienced to meet these targets in a controlled environment. This study is exploring the direct and indirect connections between sustainability and energy efficiency requirements given by codes to technical and cost-efficient solutions offered by industry.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126513255","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm 基于BIM-GIS集成和车辆路径算法的模块化集成建设项目物流规划与可视化
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS141
Sanyuan Niu, Yezhou Yang, W. Pan
{"title":"Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm","authors":"Sanyuan Niu, Yezhou Yang, W. Pan","doi":"10.29173/MOCS141","DOIUrl":"https://doi.org/10.29173/MOCS141","url":null,"abstract":"Logistics planning is a critical part of developing supply chain for modular integrated construction (MiC) projects in Hong Kong where high-rise, high density and hilly landscape is the norm. It is important to minimize the total logistics and to guarantee timely delivery of modules, especially for several MiC projects being constructed during the same period. Nevertheless, there is a significant lack of studies on logistics planning, optimization and visualization for MiC projects. The aim of this paper is to establish an integrated MiC logistics planning and visualization platform, which is grounded on the integration of building information modeling (BIM), geographical information system (GIS) and vehicle routing problem (VRP) algorithm. The framework is then presented and evaluated using a case study to identify optimal logistics scenario of trailer routes to meet the installation time window of MiC projects in Hong Kong. The paper finds that the proposed platform has the ability to make optimized logistics scenario for MiC projects, and to visualize the logistics scenario in a 3-dimentional interactive environment. Future study will focus on adopting flexible control strategies and including more decision-making criteria of logistics planning in MiC projects such as road width limitation, travel speed and different module types","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"81 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124531536","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 21
Cross-Laminated Timber Shear Walls in Balloon Construction: Seismic Performance of Steel Connections 气球结构中的交叉层合木材剪力墙:钢连接的抗震性能
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS120
H. Daneshvar, Jan Niederwestberg, C. Dickof, Jean-Philippe Letarte, Y. Chui
{"title":"Cross-Laminated Timber Shear Walls in Balloon Construction: Seismic Performance of Steel Connections","authors":"H. Daneshvar, Jan Niederwestberg, C. Dickof, Jean-Philippe Letarte, Y. Chui","doi":"10.29173/MOCS120","DOIUrl":"https://doi.org/10.29173/MOCS120","url":null,"abstract":"In the context of the global trend of designing sustainable structures, the attention towards high-rise timber buildings of 8 to 25 storeys has been increasing in recent years. Balloon construction technique using a relatively new heavy timber material, cross-laminated timber (CLT), has been shown to be promising for high-rise building applications, given its compatibility with off-site construction techniques and its desirable mechanical characteristics. To date, tall timber buildings using CLT have been built mainly in non-seismic or low-seismic locations around the world, whereas their application in high seismic regions has been limited to platform construction. More research on the behaviour of CLT structures during seismic events in terms of system behaviour as well as the behaviour of components, particularly connections, is required. The research presented in this paper seeks to initiate the process of seismic design of tall wood buildings using a balloon construction technique. Two buildings, one three-storey fictitious building and one to-be-constructed ten-storey building, both located on the west coast of Canada, were considered and designed based on the NBCC 2015 seismic provisions. The loads on the shear walls, which span over three storeys, were extracted in order to estimate realistic demands on lateral load resisting systems (LLRS) in the balloon construction. Different connections, including base shear connections, panel-to-panel shear connections, as well as high-capacity hold-downs, were designed accordingly. An experimental program was developed to investigate the behaviour of these connections, focusing on yielding and failure mechanisms in each connection category. This paper explains different phases of the experimental program and introduces connection details designed to achieve the research goals. The results of this study will contribute to the body of knowledge on seismic behaviour of prefabricated mass timber buildings, and will benefit engineers and practitioners using timber to design high-rise structures.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132676774","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach 非现场建筑制造产品质量控制规范自动选择工具:基于bim的本体模型方法
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS87
P. Martinez, Rafiq Ahmad, M. Al-Hussein
{"title":"Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach","authors":"P. Martinez, Rafiq Ahmad, M. Al-Hussein","doi":"10.29173/MOCS87","DOIUrl":"https://doi.org/10.29173/MOCS87","url":null,"abstract":"Construction manufacturing specifications play an important role in assessing quality requirements on a construction project. However, working with these specifications can be overly complicated and error prone to the large amount of regulations and codes that need to be considered and their inter-dependencies. In building information modelling (BIM), the model is a digital representation of a complex construction product and contains precise product information data. The data is currently embedded into the model as properties for parametric building objects that are exchangeable among project operators. Some effort has been previously done to enhance the BIM model to obtain construction-oriented data and linking information that is crucial to manufacturing and quality control and assurance with BIM modelling still remains a challenge. This study proposes an extension to the current BIM-based product-oriented ontology model to include manufacturing processes and inspection, and quality control specifications. By automatically identifying which specifications are applicable to certain products and to extract the requirements imposed, this approach can support and enable automatic decision making in quality inspection and control tasks, which solely depend on information and knowledge from construction specifications. This approach is tested and validated using a light-gauge steel frame wall under Canadian construction standards and regulations.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130227958","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Case Study: Program Management of Volume Modules 案例研究:卷模块的程序管理
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS139
Gregory F. Starzyk
{"title":"Case Study: Program Management of Volume Modules","authors":"Gregory F. Starzyk","doi":"10.29173/MOCS139","DOIUrl":"https://doi.org/10.29173/MOCS139","url":null,"abstract":"Volume module systems in the refining and petrochemical industries are large, multi-level systems that are fabricated offsite and stacked onsite, with integral piping and wiring interconnections. This is a case study in a program management system that was introduced for a particular volume module system. Modular design and fabrication suffer from inherent shortcomings: it is neither cheap nor fast nor does it result in any meaningful increase in quality. Lessons learned reveal cheaper, faster and better methods that overcome the inherent shortcomings of modular design and construction. These lessons can inform current trends in modular design and fabrication in the USA and Canada.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132572354","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Data Analytics of Production Cycle Time for Offsite Construction Projects 非现场施工项目生产周期时间的数据分析
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS73
Angat Pal Singh Bhatia, SangHyeok Han, O. Moselhi, Z. Lei, Claudio Raimondi
{"title":"Data Analytics of Production Cycle Time for Offsite Construction Projects","authors":"Angat Pal Singh Bhatia, SangHyeok Han, O. Moselhi, Z. Lei, Claudio Raimondi","doi":"10.29173/MOCS73","DOIUrl":"https://doi.org/10.29173/MOCS73","url":null,"abstract":"Offsite construction has been widely used in the construction industry. The process improves productivity that leads to shortened project schedule and lower budget. Over the decades, offsite construction industry has continuously evolved with the aspects of management and technology. However, offsite construction companies still have various challenges such as accurately obtaining productivity metrics, which helps in production planning. These challenges result from lack of understanding the process itself because of high variation of wall panel design specifications along with high variability of cycle time at each work station. To solve the problem, productivity data needs to be collected in context to offsite construction. In this paper, a time study was conducted in one of Alberta’s-based offsite construction factory. From the collected data and product design specifications, multiple linear regression models were developed to represent the actual work station time. The comparison between actual collected duration and modeled duration for assembly station demonstrate its accuracy that ranges from 80 -99%. In the near future, findings will be used for simulation to forecast factory production and optimize the utilization of the resources.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"15 3","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"113964642","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Research Trends in Off-Site Construction Management: Review of Literature at the Process Level 非现场施工管理的研究趋势:过程层面的文献综述
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS113
Junyoung Jang, Chansik Lee, J. I. Kim, Tae Wan Kim
{"title":"Research Trends in Off-Site Construction Management: Review of Literature at the Process Level","authors":"Junyoung Jang, Chansik Lee, J. I. Kim, Tae Wan Kim","doi":"10.29173/MOCS113","DOIUrl":"https://doi.org/10.29173/MOCS113","url":null,"abstract":"Off-Site Construction (OSC) is a new construction method based on factory production. Due to its advantages over traditional methods, such as high productivity, economic efficiency, and excellence in quality, OSC research has actively been conducted worldwide ranging from design and production standardization, transportation method, to construction planning. Thus, to understand what knowledge has been developed to improve the management of OSC projects, this study reviewed OSC papers that focus on improving a specific project management area (e.g., time, cost, and quality) in a specific phase of a project, i.e., “process-level research.” This study found 94 papers with such a focus, out of 222 OSC project management papers published from 1986 to 2018, and assessed the trends of the research with multiple dimensions, including project phases, OSC types, application types, and management areas. Main findings are as follows: (1) process-level research has been increasing fast since 2006. (2) Non-volumetric pre-assembly type contributes the most to the increase of process-level OSC management research. (3) Research focuses vary depending on the application type (e.g., living quality issues for residential, economics issues for non-residential, productivity issues for plant). (4) Wider project management areas (e.g., quality, human resources, risk) have gained attention from OSC papers since 2006. (5) Non-volumetric type gained interests in residential and non-residential buildings, whereas modular type was studied frequently in plants. This study would help project management researchers understand the trends in OSC and plan and conduct future OSC project management research.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"71 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126804528","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Structural Design and Modelling Method for the Post-tensioned CLT Shear Wall Structures 后张拉CLT剪力墙结构设计与建模方法
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS80
Minjuan He, Xiaofeng Sun, Zheng Li
{"title":"Structural Design and Modelling Method for the Post-tensioned CLT Shear Wall Structures","authors":"Minjuan He, Xiaofeng Sun, Zheng Li","doi":"10.29173/MOCS80","DOIUrl":"https://doi.org/10.29173/MOCS80","url":null,"abstract":"This paper presents the direct displacement-based design (DDD) procedure, structural modelling method, and structural performance calibration for post-tensioned CLT shear wall structures (PT-CLTstrs). Numerical models of the post-tensioned (PT) CLT shear walls were developed and calibrated with the experimental results. Based on the developed shear wall models, parametric analysis were conducted to investigate the lateral performance influencing factors. Then, a DDD procedure was developed and demonstrated by the design examples of a set of 8-, 12-, and 16-storey PT-CLTStrs. The corresponding simplified structural models were developed, and then a series of pushover and time-history dynamic analysis were conducted to calibrate the calculated structural performance objectives with the design targets of the DDD procedure. Finally, the empirical cumulative distribution functions (CDFs) of the maximum inter-storey drift (MaxISDR) were constructed. It is found that when the width of the PT CLT shear walls increases from 1.8 m to 3.0 m, the base shear at the drift of 2.0 % increases by twice accordingly. When the diameter of the PT strand increases from 15.2 mm to 34.6 mm, the base shear at the drift of 2.0 % increases by up to five times. Additionally, the MaxISDR limitation of the PT-CLTStrs is recommended as 2.2 % under the collapse prevention (CP) hazard level. The study results can serve as guidelines for the development of engineering design methods for the PT-CLTStrs.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"100 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116749339","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Calibrating CII RT283’s Modularization Critical Success Factor Accomplishments 校准CII RT283的模块化关键成功因素成就
Modular and Offsite Construction (MOC) Summit Proceedings Pub Date : 2019-05-24 DOI: 10.29173/MOCS99
Jin Ouk Choi, J. O’Connor, Y. Kwak, Rajarshi Ghimire
{"title":"Calibrating CII RT283’s Modularization Critical Success Factor Accomplishments","authors":"Jin Ouk Choi, J. O’Connor, Y. Kwak, Rajarshi Ghimire","doi":"10.29173/MOCS99","DOIUrl":"https://doi.org/10.29173/MOCS99","url":null,"abstract":"Modularization is a well-known construction technique where sections of the job are moved from on-site to a fabrication shop. Previously, the researchers identified the 21 most influential Critical Success Factors (CSFs) for successful modularization and quantified the degree of each CSF’s accomplishment by conducting a survey with 19 subject matter experts, and a case study with three modular projects. Through this methodology, the findings relied on the experience of experts. However, still missing from the understanding of modularization CSFs is a validation of the current degree of each CSF’s accomplishment by examining actual modular projects using a sufficient number of samples. This paper presents a comparison of CSF accomplishment degree between 25 actual sample projects (project based) and the industry experts’ survey results (experience-based estimation). The study results indicate that the industry experts made a good estimation of the current occurrence degree of each CSF. The study did identify, however, three significantly overestimated CSFs and three underestimated CSFs. The three most overestimated CSFs are Owner-Furnished/Long Lead Equipment Specification, Cost Savings Recognition, and O&M Provisions. The three most underestimated CSFs are Contractor Experience, Management of Execution Risks, and Transport Delay Avoidance. This study will help the industry to 1) better understand modularization CSFs and their accomplishment statuses; 2) achieve higher modular project performance by accomplishing the CSFs","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116490111","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信