L. A. Martin, J. A. Steele, Stephen McArthur, A. Moyes, James R. McDonald, D. Howie, R. Elrick
{"title":"A structured methodology for intelligent system selection in nuclear power industry applications","authors":"L. A. Martin, J. A. Steele, Stephen McArthur, A. Moyes, James R. McDonald, D. Howie, R. Elrick","doi":"10.1109/LESCPE.2001.941624","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941624","url":null,"abstract":"As the number of successful implementations of intelligent systems (ISs) to perform nonsafety related operations increases, so the desire has grown to assess the possibility for use of ISs to support safety related functions. This interest has been recognised by the nuclear industry who wish to determine if ISs can be successfully and reliably used for performing condition monitoring of critical data. Therefore, in order to test the applicability of ISs in the nuclear domain, it is necessary to create a structured development methodology that explains why and how development decisions have been made. At the top level of this IS development methodology, it has consequently been necessary to develop a generic IS selection methodology which can be applied to any relevant problem. This paper has presented a methodology, to aid a decision maker in choosing an appropriate intelligent system as the solution to a given problem. This methodology provides a formal framework for justification of the decisions made and provides the facility for traceability and subsequent justification of these decisions. This is therefore useful for nuclear power software applications where it is desirable to make well-planned and justifiable decisions when the IS is to be used in safety-related applications.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125179636","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
J. A. Steele, L. A. Martin, S. Mcarthur, A. Moyes, J. McDonald, D. Howie, R. Elrick
{"title":"An intelligent system for monitoring the nuclear refuelling process","authors":"J. A. Steele, L. A. Martin, S. Mcarthur, A. Moyes, J. McDonald, D. Howie, R. Elrick","doi":"10.1109/LESCPE.2001.941625","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941625","url":null,"abstract":"Certain types of nuclear reactors contain over 300 fuel assemblies that over time will become depleted and require replacement with new fuel assemblies-this process is known as refuelling. When refuelling a nuclear reactor, the data produced must be evaluated to ensure that the fuel assembly has landed properly in its position, thereby allowing the continued and safe operation of the station. The process of evaluation is time consuming because of the manual interpretation required and the large amount of data produced. This manual interpretation also requires considerable domain experience due to the nature of the domain. This paper presents an intelligent system to automate the process of the data analysis, thereby shortening the evaluation time and providing an explanation of the reasoning behind its conclusions. The intelligent system utilises a knowledge based system, neural network based classification, K-means clustering techniques and rule induction methods to evaluate the data and inform the operator of any errors encountered.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128471798","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Distribution network reconfiguration and reactive power compensation","authors":"J. Jerome","doi":"10.1109/LESCPE.2001.941647","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941647","url":null,"abstract":"Electric utilities and customers are all interested in power quality. The use of automation and energy efficient equipment with electronic control would greatly improve industrial production. These new devices are more sensitive to supply voltage deviation and the characteristics of the power system that was previously ignored are now very important. Hence the benefits of distribution automation have been widely acknowledged in recent years. This paper proposes an efficient load flow solution technique extended to find optimum location for reactive power compensation and network reconfiguration for planning and day-to-day operation of distribution networks. This is required as a part of the distribution automation system (DAS) for taking various control and operation decisions. The method exploits the radial nature of the network and uses forward and backward propagation technique to calculate branch currents and node voltages. The proposed method has been tested to analyze several practical distribution networks of various voltage levels and also having high R/X ratio.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"192 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114809574","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Effect of distributed generation on protective device coordination in distribution system","authors":"","doi":"10.1109/LESCPE.2001.941636","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941636","url":null,"abstract":"Protection of a power system is an extremely important aspect as the duality and scheme of protection decides system reliability, controllability and stability. This paper concentrates on the protection of a distribution system in the light of developments in distributed generation (DG). The conventional distribution system is radial in nature, characterized by a single source feeding a network of down-stream feeders. The protection system has traditionally been designed assuming the system to be radial. After connecting DG, part of the system may no longer be radial, which means the coordination might not hold. The effect of DG on coordination will depend on size, type and placement of DG. This paper explores the effect of DG on protective device coordination such as fuse-fuse, fuse-recloser and relay-relay. In each case, depending on size and placement of DG, there are some margins in which the coordination may hold and certain cases, where no margin is available. These conditions are identified for each case through coordination graphs.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117314631","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"An approach for optimal units start-up during bulk power system restoration","authors":"A. Ketabi, H. Asmar, A. Ranjbar, R. Feuillet","doi":"10.1109/LESCPE.2001.941649","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941649","url":null,"abstract":"This paper describes an approach for unit start-up sequence determination during power system restoration. This approach is based on the backtracking search method, which determines the generating starting times to maximize the MWh load served over a restoration period and guarantee optimality of the start up sequence. The dynamic characteristics of different types of units and system constraints have to be considered. The shortest path, i.e., the path that requires the minimal number of switching actions, between the supplying unit and load is selected unless it is not feasible. Simulation tests, carried out on 39-bus New England test system, verify the effectiveness of the proposed method.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121940914","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Modeling of legacy intelligent electronic devices for UCA based substation integration systems","authors":"A. Apostolov","doi":"10.1109/LESCPE.2001.941622","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941622","url":null,"abstract":"Intelligent electronic devices (IED) are the standard protection and control equipment in today's substations. UCA2 based protection and control systems integrate devices that are designed to support the UCA object models. However, there is a huge installed base of legacy protection and control IEDs that are still going to be available for many years and will have to be integrated in UCA based systems. The paper describes in detail the complex object model of multifunctional legacy protection and control IEDs. The models are based on the existing UCA 2 documents (Generic Object Models for Substation and Feeder Equipment-GOMSFE). It presents the basic building blocks and their grouping in order to model such a protective device. The challenges of modeling different multifunctional legacy devices in a single gateway are discussed. The object-oriented approach to peer-to-peer communications for high speed protection and control functions and issues related to gateway based applications are covered in another section of the paper. They are based on Generic Object Oriented Substation Event (GOOSE) messages exchanged between protective relays connected to the substation LAN.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121234881","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"On the application of /spl alpha//spl beta/-transformation for power systems frequency relaying","authors":"S. Soliman, R. Alammari, M. El-Hawary","doi":"10.1109/LESCPE.2001.941637","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941637","url":null,"abstract":"This paper presents a new and very accurate algorithm for power system frequency measurement. The proposed algorithm is based on /spl alpha//spl beta/-transformation of the three phase voltages or current waveforms in the relay location, where digital samples are available for the three phase waveforms. Having obtained the digital samples of one of the components, /spl alpha/-/spl beta/ components, the finite divided difference formulae are used to calculate the parameters of one of these components; the magnitude, the frequency and phase angle. The necessary formulae are derived within the text and effects of imbalance and harmonics contamination on the waveforms are discussed within the text.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"75 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115100976","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
A. Watson, J. McDonald, G. Burt, A. Ferguson, A. Hill
{"title":"Challenges and opportunities facing electricity distribution utilities","authors":"A. Watson, J. McDonald, G. Burt, A. Ferguson, A. Hill","doi":"10.1109/LESCPE.2001.941645","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941645","url":null,"abstract":"UK electricity distribution utilities will be faced with a number of challenges and opportunities as a result of distributed generation appearing on their networks. It is argued that the current approach to distribution network design, which relies on network reinforcement practices, will not be conducive for designing networks in the future. Especially to take advantage of the opportunities while at the same time mitigating the challenges, network designers should be in a position to consider all solutions that can solve a particular design problem. This means that they should consider both network reinforcement and contemporary design solutions. Contemporary solutions include the wide range of power electronic controller devices on the market. A new framework is presented to facilitate the design of distribution networks in the future.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114387973","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"GENCOs portfolio management using \"STRATEGIST\" in deregulated power markets","authors":"H. Yamin, J. Finney, W. Rutz, H. Holly","doi":"10.1109/LESCPE.2001.941618","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941618","url":null,"abstract":"STRATEGIST is a software package that is coded in FORTRAN and C++ for GENCOs' portfolio management in deregulated power markets utilizing COUGER which is a unit commitment software package coded in FORTRAN for profit maximization. STRATEGIST incorporates a probabilistic approach for the evaluation of composite reliability of generation, load forecast and fuel prices using different probability distributions. STRATEGIST analyses the risk in an uncertain power market. This package is to be used by GENCOs to maximize their profit as well as to hedge the GENCOs to against crucial loss of profit. A typical scenario for applying this package is a GENCO which tries to supply its native load and trade bilateral transactions and would be interested in determining the risk associated with different alternatives. STRATEGIST is designed based on a comprehensive analysis of various risks in a portfolio.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122088892","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Voltage stability constrained VAr planning-a case study for New Zealand","authors":"B. Chakrabarti, D. Chattopadhyay, C. Krumble","doi":"10.1109/LESCPE.2001.941632","DOIUrl":"https://doi.org/10.1109/LESCPE.2001.941632","url":null,"abstract":"This paper discusses a VAr planning optimisation model that takes into account voltage stability constraint, and proposes an efficient solution algorithm to solve it. A contingency constrained optimal power flow (OPF) based model incorporating (static) voltage stability constraints is developed to analyse optimal VAr support decisions. Given a set of contingencies, the model performs the contingency ranking, decides optimal location and quantity of VAr support to simultaneously cover all the contingencies. DICOPT++, a state-of-the-art mixed integer nonlinear programming (MINLP) algorithm, is proposed to solve the model efficiently. The model is implemented for a 17 bus reduced New Zealand North Island system. The modal analysis is also conducted and the result is discussed.","PeriodicalId":419863,"journal":{"name":"LESCOPE 01. 2001 Large Engineering Systems Conference on Power Engineering. Conference Proceedings. Theme: Powering Beyond 2001 (Cat. No.01ex490)","volume":"59 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117056175","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}