{"title":"Recycling Services Using the Best Value Approach","authors":"D. Kashiwagi, Erik Brown","doi":"10.37265/japiv.v14i1.140","DOIUrl":"https://doi.org/10.37265/japiv.v14i1.140","url":null,"abstract":"The Best Value Approach (BVA) has been in research and development for 30 years [1992 – 2022]. The approach has been successfully tested in the procurement of over 2,000 projects [98% customer satisfaction, minimized contractor change orders to 1% and reduced cost of 5 to 30%]. The BVA has been successful in delivering construction projects but has not been tested in the delivery of contractual services. In 2018, a large organization tested the BVA on procuring recycling services. The BVA has two paradigm shifts: a new procurement and project management approach. The new approach minimizes the need for the client to direct and control the vendor and minimizes the need to depend on the relationship between the client and vendor. The BVA replaces the dependence on the relationship with performance information. The performance information creates transparency and minimizes the need for the client to direct and control the vendor. The objective of the BVA is efficiency: to reduce cost and increase profit, revenue and value. The paper tracks the performance of the BVA on recycling service for the first four years of the recycling service [2018 – 2022].","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"24 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122733767","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Implementing and Sustaining the Best Value Approach in a Large Organization","authors":"Joseph Kashiwagi","doi":"10.37265/japiv.v14i1.138","DOIUrl":"https://doi.org/10.37265/japiv.v14i1.138","url":null,"abstract":"In recent years, construction companies have lost millions of dollars due to poor project management performance on projects. The Best Value Approach (BVA) is one of the only documented systems to show an increase in the performance of project management. It has been used on over 2000 projects with a 98% customers satisfaction to cut costs, decrease time, reduce effort, and improve quality on projects. The BVA system is also the most licensed technology at Arizona State University with 65 licenses. The issue with the BVA is that professionals have struggled to implement and sustain the system in their own organizations. Research was conducted at SKEMA Business School as part of a Doctor of Business Administration (DBA) to resolve the sustainability issue. The research included a complete literature review of the BVA and 32 other buyer/supplier systems along with a practitioner’s survey (107 participants) and 10 test projects from a large organization that has been utilizing the BVA for over three years. The result of the study is 11 unique BVA characteristics, 6 identified issues by practitioners, and 15 modifications to improve the sustainability of the BVA. The research provides a foundational framework for how organizations can implement and sustain the BVA that has been tested and used with a large organization.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"102 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116105962","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Delivering Janitorial Supplies to a Large International Organization","authors":"J. Kashiwagi, J. Gunnoe","doi":"10.37265/japiv.v14i1.139","DOIUrl":"https://doi.org/10.37265/japiv.v14i1.139","url":null,"abstract":"The Best Value Approach (BVA) has been in research and development for 30 years [1992 – 2022]. The approach has been successfully tested in the procurement of over 2,000 projects [98% customer satisfaction, minimized contractor change orders to 1% and reduced cost of 5 to 30%] (PBSRG, 2022). The BVA has been successful in delivering construction projects but has not been sufficiently tested in the delivery of contractual services. In 2018, a large organization tested the BVA on procuring recycling services. In 2019, the organization ran a second BVA test to procure the delivery of janitorial products to 7,000 facilities. The BVA utilizes the use of performance information to identify and utilize expertise to dramatically reduce their cost. The case study shows how a vendor can use performance information to define their expertise and value. The paper tracks the performance of the expert vendor for three years [2019 – 2021]. The case study also shows the value of the expert vendor’s project manager as the project manager was the only person in the vendor’s organization who understood the importance of using performance information.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117078286","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Use of Customer Satisfaction to Measure Performance of Systems and Contractors: Post-Occupancy Evaluation (POE) Method","authors":"Dhaval Gajjar","doi":"10.37265/japiv.v14i1.137","DOIUrl":"https://doi.org/10.37265/japiv.v14i1.137","url":null,"abstract":"A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty program that measures the performance information of their systems and applicators. Moreover, the success of any project in the construction industry heavily relies upon the capability of the contractor(s) executing the project. Low-performing contractors are correlated with increased cost and delayed schedules, resulting in end-user dissatisfaction with the final product. Hence, the identification and differentiation of the high performing contractors from their competitors is also crucial. The purpose of this study is to identify and describe a new model for measuring manufacturer performance and differentiating contractor performance and capability for two roofing manufacturers (Manufacturer 1 and Manufacturer 2) in the roofing industry. The research uses multiple years of project data and customer satisfaction data collected for two roofing manufacturers for over 1,000 roofing contractors. The performance and end-user satisfaction were obtained for over 7,000 manufacturers' projects and each contractor associated with that project for cost, schedule, and quality metrics. The measurement process was successfully able to provide a performance measurement for the manufacturer based on the customer satisfaction and able to identify low performing contractors. This study presents the research method, the developed measurement model, and proposes a performance measurement process that entities in the construction industry can use to measure performance.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121378772","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Using the Best Value Approach to Improve Construction Project Performance in the Chinese Construction Industry","authors":"Yutian Chen, Oswald Chong","doi":"10.37265/japiv.v13i1.133","DOIUrl":"https://doi.org/10.37265/japiv.v13i1.133","url":null,"abstract":"The Chinese Construction Industry (CCI) is struggling with poor project performance (including cost overruns, delays, and lower satisfaction ratings). Previous research has identified that other developing countries are struggling with similar issues. According to the available economic data (GDP, growth, corruption, etc.) the CCI is very similar to construction industries in Vietnam and the Kingdom of Saudi Arabia. A literature review suggests that the CCI struggles with similar risks as these two countries. The primary difference between the CCI and other industries is the socialistic environment. Several research efforts have shown the Best Value Approach (BVA) to be a feasible solution to reconciling project performance in both Vietnam and Saudi Arabia. The research shown herein investigates whether the BVA is a feasible solution to performance issues in the CCI. Using available literature, the authors created an industry expert survey to investigate whether BVA concepts can address the performance issues in the CCI and if they can be implemented despite government policy. From 204 responses, the results suggest that most professionals are dissatisfied with the CCI performance, over 50% believe BVA concepts will improve the performance of the CCI, but only 40% believe that the BVA would be implementable in the CCI.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"123 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133711450","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Synthesis of Practices and Tools for Cost Estimation and Cost Management for Transportation Projects","authors":"M. Baek, B. Ashuri","doi":"10.37265/JAPIV.V13I1.132","DOIUrl":"https://doi.org/10.37265/JAPIV.V13I1.132","url":null,"abstract":"Cost escalation during project development is inevitable on transportation projects. The lack of a systematic process for establishing a baseline budget with the consideration of potential issues (risks) that negatively impact project cost throughout project development presents a major challenge for State Departments of Transportation (DOTs). The overarching objective of this paper is to identify best practices for cost estimation and management that can aid project managers and engineers throughout the project development process (PDP). To achieve the objective, this paper conducted a systematic literature review, comprehensive content analysis of cost estimation and cost management processes in other State DOTs, and interviews with transportation cost professionals. A systematic literature review identified four key areas for cost estimation and cost management, including: (1) risk analysis and contingency; (2) identification of cost escalation factors; (3) accuracy of preliminary cost estimate; (4) and constructability review. Cost estimation and control processes in Minnesota, California, Texas, Ohio, and Washington State DOTs are provided as examples of best practices for establishing reliable baseline cost estimates. This paper represents a current synthesis of state DOTs’ practices on cost estimation and cost management in the U.S.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"57 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128874947","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Using the Best Value Approach to Improve Project Performance in the Vietnam Construction Industry","authors":"Nguyen Le, Oswald Chong, D. Kashiwagi","doi":"10.37265/japiv.v13i1.131","DOIUrl":"https://doi.org/10.37265/japiv.v13i1.131","url":null,"abstract":"The Vietnam Construction Industry (VCI) has been facing risks that cause delays, budget overrun, and low customer satisfaction that required continuous research efforts on solutions. This paper focuses on how the Best Value Approach (BVA), a procurement and project management philosophy, could be utilized in VCI projects to improve overall performance. Analysis from six industry experts determined how current VCI conditions, namely risk and success factors, are related to the BVA. Sixteen BVA success principles were identified and ranked based on their perceived impact to project performance by an industry survey with 98 VCI practitioners. The results show high agreement rate with all sixteen BVA principles. Spearman’s rank-order correlation test determined relatively high agreement between owners and contractors, and lower agreement between owners and consultants on the ranking. The majority of participants agreed that the BVA would improve project performance and were interested in learning more about the BVA. The results encourage further BVA testing and education in the VCI. This approach is not limited to the VCI but could be followed by other developing nations.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114964570","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Dhaval Gajjar, Cayla Anderson, Vivek Sharma, E. Mousavi, William Good
{"title":"Curriculum Framework Development: A Case Study of Implementing a Construction Management Roofing Course","authors":"Dhaval Gajjar, Cayla Anderson, Vivek Sharma, E. Mousavi, William Good","doi":"10.37265/japiv.v13i1.134","DOIUrl":"https://doi.org/10.37265/japiv.v13i1.134","url":null,"abstract":"The U.S. construction industry is currently facing the significant challenge of a declining workforce. Studies of age-related demographics show that the construction industry will not be able to meet its future workforce demands. The roofing industry, one of the essential sectors within construction, faces a similar workforce challenge, presenting a need to build a platform to prepare the next generation of leaders within the industry. With this in mind, the objective of this study was to develop a curriculum framework for a three-credit course (not currently offered in the curriculum) on roofing at the undergraduate and graduate level. An industry-wide survey was developed and distributed to understand the industry’s perception regarding current workforce challenges and the perceived need for a course at the higher education level. The study further provides details on the involvement of industry professionals in the course development and implementation, the impact of the course on student’s learning and their perception regarding the roofing industry. The findings of the study addressed a current curriculum gap within construction management. The students indicated that they had significantly increased their knowledge about roofing and had generated an interest to explore career options in roofing.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117126170","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
M. Alzara, Mohammed Algahtany, J. Kashiwagi, Abdulrahman Al-Tassan, D. Kashiwagi
{"title":"Improving the Current Procurement System in Saudi Arabia: A University Case Study","authors":"M. Alzara, Mohammed Algahtany, J. Kashiwagi, Abdulrahman Al-Tassan, D. Kashiwagi","doi":"10.37265/japiv.v9i2.30","DOIUrl":"https://doi.org/10.37265/japiv.v9i2.30","url":null,"abstract":"Public projects in Saudi Arabia have faced performance issues. The primary procurement system used in Saudi Arabia (low-bid) does not consider the contractors’ performance. A case study conducted at a university campus in northern Saudi Arabia showed low project performance. The current procurement system was analyzed and modified to utilize the concepts of the Best Value Performance Information Procurement System (BV PIPS). BV PIPS has demonstrated high levels of project performance in previous tests. A large survey was conducted of 761 classified contractors and 43 universities’ representatives. Survey respondents were asked to quantify their view regarding the current procurement system, rate their level of agreement regarding Best Value principles, and rate their level of agreement with the newly proposed procurement system which integrates Best Value principles. The results of the survey show that both, clients and contractors, are dissatisfied with the current procurement system, and agree with the new procurement system. The survey also suggests that respondents agree with Best Value principles suggesting that contractors’ performance should be tracked, and procurement should be conducted using both price and past performance information. The authors recommend that the newly proposed procurement model should be implemented in more projects in Saudi Arabia to further validate the Best Value system and improve the performance of projects in the country.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"22 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-03-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122239567","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Exploring Company Performance Measurement for Truck Manufacturers","authors":"Q. Zeng, W. B. V. Blokland","doi":"10.37265/japiv.v10i1.25","DOIUrl":"https://doi.org/10.37265/japiv.v10i1.25","url":null,"abstract":"This paper aims to develop a quantitative model of company performance from an inventory perspective for truck manufacturers. With the inventory performance as a new dimension, fourteen indicators are identified to form a conceptual framework for truck manufacturers to measure their company performance. Accordingly, techniques of the fuzzy logic and the analytic network process (ANP) are used to generate the quantitative model, considering the interdependency between the indicators and the uncertainty arising from human qualitative judgments. A case study is conducted in nine truck manufacturers, with time series data from the fiscal year 2004 to 2015. The ranking result out of the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used as a validation, which proves the higher accuracy of the model developed.","PeriodicalId":401649,"journal":{"name":"Journal for the Advancement of Performance Information and Value","volume":"19 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114783230","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}