A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY 南非建筑业项目延误和中断的原因和影响的比较研究
Journal of Construction Engineering and Project Management Pub Date : 2017-03-01 DOI: 10.6106/JCEPM.2017.3.30.013
Oluwaseun Olumide Oshungade
{"title":"A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY","authors":"Oluwaseun Olumide Oshungade","doi":"10.6106/JCEPM.2017.3.30.013","DOIUrl":"https://doi.org/10.6106/JCEPM.2017.3.30.013","url":null,"abstract":": Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants – clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor’s experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"64 5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133486511","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 14
The Ancient Construction Materials and Methods: The Great Wall of China in Jinshanling as a Case Study 古代建筑材料与方法——以中国金山岭长城为例
Journal of Construction Engineering and Project Management Pub Date : 2017-03-01 DOI: 10.6106/JCEPM.2017.3.30.037
J. Yang, F. Tan, A. Tan
{"title":"The Ancient Construction Materials and Methods: The Great Wall of China in Jinshanling as a Case Study","authors":"J. Yang, F. Tan, A. Tan","doi":"10.6106/JCEPM.2017.3.30.037","DOIUrl":"https://doi.org/10.6106/JCEPM.2017.3.30.037","url":null,"abstract":": The Jinshanling section of the Great Wall of China is a series of fortifications in northern China that was constructed for strategic military defenses. This section was first built in the beginning of the Ming Dynasty in AD 1368 and then underwent major construction, reconstruction and renovation during the late Ming Dynasty, approximately in AD 1569. The Jinshanling section is 10.5 km long, a very short section compared with the entire 21,200 km wall. The wall section is located in Luanping County, Hebei province, China. This research paper focuses on the construction methods and materials of the wall and the towers in the area. The research methodology includes site visits, knowledge acquisition of experts and 3D graphic modeling. This study reveals that the materials selected for the structure include rubbles and rammed earth, bricks, stones, timber, and mortar. The erection sequence of the wall and the towers was a bottom-up fashion using various ancient construction techniques, such as the fire-setting rock blasting techniques and the surveying techniques from the Sea Island Mathematical Manual.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122328212","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Experimental Investigation of Chloride Ion Penetration and Reinforcement Corrosion in Reinforced Concrete Member 钢筋混凝土构件氯离子渗透与钢筋腐蚀试验研究
Journal of Construction Engineering and Project Management Pub Date : 2017-03-01 DOI: 10.6106/JCEPM.2017.3.30.026
M. Mamun, M. Islam
{"title":"Experimental Investigation of Chloride Ion Penetration and Reinforcement Corrosion in Reinforced Concrete Member","authors":"M. Mamun, M. Islam","doi":"10.6106/JCEPM.2017.3.30.026","DOIUrl":"https://doi.org/10.6106/JCEPM.2017.3.30.026","url":null,"abstract":": This paper represents the experimental investigation of chloride penetration into plain concretes and reinforced concretes. The main objective of this work is to study the main influencing parameters affecting corrosion of steel in concrete. Plain cement concrete and reinforced cement concrete with different water-cement ratios and different cover depth were subjected to ponding test. Ponding of specimens were done for different periods into 10% NaCl solution. Depth of penetration of chloride solution into specimens was measured after ponding. Specimens were crushed and reinforcements were washed using HNO 3 solution and weight loss due to corrosion was calculated accordingly. There was a linear relationship between depth of penetration and water-cement ratio. It was also observed that, corrosion of reinforcing steel increases with chloride ponding period and with water-cement ratio. Corrosion of steel in concrete can be minimized by providing good quality concrete and sufficient concrete cover over the reinforcing bars. Water-cement ratio has to be low enough to slow down the penetration of chloride salts into concrete.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"175 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127006043","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Practical Approach for Pavement Treatment Decisions for Local Agencies 地方机构路面处理决策的实用方法
Journal of Construction Engineering and Project Management Pub Date : 2017-03-01 DOI: 10.6106/JCEPM.2017.3.30.030
A. Abdelaty, H. D. Jeong, O. Smadi
{"title":"Practical Approach for Pavement Treatment Decisions for Local Agencies","authors":"A. Abdelaty, H. D. Jeong, O. Smadi","doi":"10.6106/JCEPM.2017.3.30.030","DOIUrl":"https://doi.org/10.6106/JCEPM.2017.3.30.030","url":null,"abstract":": Most local agencies such as counties and small cities continuously express difficulties in making technically and financially defensible decisions on their pavement infrastructure maintenance and rehabilitation. Unlike pavement systems managed by state highway agencies, the total lane-miles of many local pavements are significantly short and they are managed by a limited number of staff who typically have multiple responsibilities. Most local agencies also do not have historical pavement performance data and the lack of a systematic decision making framework exacerbates the problem. A structured framework and an easily accessible decision support tool that reflects their local requirements, practices and operational conditions would greatly assist them in making consistent and defensible decisions. This study fills this gap by developing a systematic pavement treatment selection framework and a spreadsheet based tool for local agencies. It is expected that the proposed framework will significantly help local agencies to improve their pavement asset management practices at the project level.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130757344","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Construction Delays in Developing Countries: A Review 发展中国家的建设延误:综述
Journal of Construction Engineering and Project Management Pub Date : 2017-03-01 DOI: 10.6106/JCEPM.2017.3.30.001
Muhammad Saiful Islam, B. Trigunarsyah
{"title":"Construction Delays in Developing Countries: A Review","authors":"Muhammad Saiful Islam, B. Trigunarsyah","doi":"10.6106/JCEPM.2017.3.30.001","DOIUrl":"https://doi.org/10.6106/JCEPM.2017.3.30.001","url":null,"abstract":": Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors’ cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132094438","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 31
Success Factors of Highway Construction Projects in Egypt: AHP Approach 埃及公路建设项目成功因素:层次分析法
Journal of Construction Engineering and Project Management Pub Date : 2016-12-01 DOI: 10.6106/JCEPM.2016.12.4.007
A. E. A. El-Maaty, Saad El-Hamrawy, A. Y. Akal
{"title":"Success Factors of Highway Construction Projects in Egypt: AHP Approach","authors":"A. E. A. El-Maaty, Saad El-Hamrawy, A. Y. Akal","doi":"10.6106/JCEPM.2016.12.4.007","DOIUrl":"https://doi.org/10.6106/JCEPM.2016.12.4.007","url":null,"abstract":": While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"141 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115429868","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 11
Authentic Leadership and Construction Superintendent Effectiveness 真正的领导和建筑监督效能
Journal of Construction Engineering and Project Management Pub Date : 2016-12-01 DOI: 10.6106/JCEPM.2016.12.4.015
Benjamin J. Broughton, Soon-Jae Lee, Jay Sang Ryu, K. Talley
{"title":"Authentic Leadership and Construction Superintendent Effectiveness","authors":"Benjamin J. Broughton, Soon-Jae Lee, Jay Sang Ryu, K. Talley","doi":"10.6106/JCEPM.2016.12.4.015","DOIUrl":"https://doi.org/10.6106/JCEPM.2016.12.4.015","url":null,"abstract":": The construction industry suffers from declining productivity and lack of trust between stakeholders and among the public. Increasing technical, regulatory, environmental and ethical challenges face the sector and necessitate a new type of leader. Authentic leadership is a relatively new construct that focuses on a leader demonstrating self-awareness, relational transparency, an internalized ethical and moral perspective and balanced processing. This study uses the Authentic Leadership Questionnaire to measure construction superintendent's levels of authentic leadership and compares them to effectiveness ratings. There is a correlation between higher authentic leadership scores and effectiveness and this study concludes that authentic leaders are more effective superintendents.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121623605","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan 影响巴基斯坦开伯尔-普赫图赫瓦省建设项目成功的因素
Journal of Construction Engineering and Project Management Pub Date : 2016-12-01 DOI: 10.6106/JCEPM.2016.12.4.001
M. A. Musarat, M. Ahad
{"title":"Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan","authors":"M. A. Musarat, M. Ahad","doi":"10.6106/JCEPM.2016.12.4.001","DOIUrl":"https://doi.org/10.6106/JCEPM.2016.12.4.001","url":null,"abstract":"","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"204 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114291441","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 17
Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects 影响无争议绩效的关键因素:以埃塞俄比亚公共建设项目为例
Journal of Construction Engineering and Project Management Pub Date : 2016-12-01 DOI: 10.6106/JCEPM.2016.12.4.024
Ephrem Girma Sinesilassie, S. Tabish, K. N. Jha
{"title":"Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects","authors":"Ephrem Girma Sinesilassie, S. Tabish, K. N. Jha","doi":"10.6106/JCEPM.2016.12.4.024","DOIUrl":"https://doi.org/10.6106/JCEPM.2016.12.4.024","url":null,"abstract":": Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126860358","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN) 基于人工神经网络(ANN)的加沙地带建筑承包商评标系统开发
Journal of Construction Engineering and Project Management Pub Date : 2016-09-01 DOI: 10.6106/JCEPM.2016.6.3.001
N. El-Sawalhi, Yousef J H Abu Hajar
{"title":"Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)","authors":"N. El-Sawalhi, Yousef J H Abu Hajar","doi":"10.6106/JCEPM.2016.6.3.001","DOIUrl":"https://doi.org/10.6106/JCEPM.2016.6.3.001","url":null,"abstract":"الغرض من هذه الورقة هو تطوير نموذج لاختيار أفضل مقاول في قطاع غزة باستخدام \u0000الشبكة العصبية الاصطناعية (ANN). \u0000 تم تحديد طرق ومعايير اختيار المقاول باستخدام مسح ميداني. أربعة وخمسون مهندسا \u0000طلب منهم ملء استبيان يغطي العوامل المتعلقة بمعايير اختيار المقاولين الذين يمارسون في قطاع غزة. ال \u0000أظهرت النتائج أن الجزء المهيمن من المجيبين (91 ٪) أكد أن طريقة ترسية العطاء الحالية هي \"أدنى سعر \" هى \u0000تعتبر واحدة من المشاكل الرئيسية في قطاع البناء ،اما طريقة \"منح العطاء لأعلى وزن بعد الجمع بين \u0000النتائج الفنية والمالية فقد اكد \"50٪ من المشاركين انها الانسب. \u0000تم استخدام معيار الاهمية و ذلك خلال دراسة واحد و تسعون عرض سعر من ثلاثة عشر مشروع و المعلومات المرصوده من هذه المشاريع استخدمت في تدريب و فحص و بناء نموذج باستخدام شبكات الاعصاب و هذه العملية تمت بعد اعادة تقييم العروض المقدمة من المقاولين بالاعتماد على اوزان العوامل وذلك لاختيار افضل مقاول و الذةى حصل على اعلى الدرجات. تم استخدام برنامج كمبيوتر . \u0000يسمى نيروسليوشن لتجهيز و تدريب النموذج. اوضحت النتائج انه بسبة نجاح 95.96% تمكن النموذج من اختيار افضل مقاول.و قد اوضح تحليل الحساسية ان كل من الربحية و رائس المال هي من اكثر العوامل تاثيرا في اختيار المقاول. و قد افاد هذا النموذج في جعل المالك اكثر دقة في اختيار المقاول المناسب.","PeriodicalId":400982,"journal":{"name":"Journal of Construction Engineering and Project Management","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117111220","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书