Gas Turbine Combined Cycle Power Plants最新文献

筛选
英文 中文
What Next? 下一个什么?
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-20
S. C. Gülen
{"title":"What Next?","authors":"S. C. Gülen","doi":"10.1201/9780429244360-20","DOIUrl":"https://doi.org/10.1201/9780429244360-20","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115432692","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Operability 可操作性
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-15
S. C. Gülen
{"title":"Operability","authors":"S. C. Gülen","doi":"10.1201/9780429244360-15","DOIUrl":"https://doi.org/10.1201/9780429244360-15","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123736157","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Cogeneration 热电联产
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-14
S. C. Gülen
{"title":"Cogeneration","authors":"S. C. Gülen","doi":"10.1201/9780429244360-14","DOIUrl":"https://doi.org/10.1201/9780429244360-14","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"125 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121624445","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Maintenance 维护
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-16
S. C. Gülen
{"title":"Maintenance","authors":"S. C. Gülen","doi":"10.1201/9780429244360-16","DOIUrl":"https://doi.org/10.1201/9780429244360-16","url":null,"abstract":"Cooling fan is essential component in many drive products. It provides a thermal management by creating an airflow, thus lowering the temperature inside the drives. It provides high efficiency and performance by removing the heat generated inside the drive. There are several different fan options available: AC fan, DC fan and newest EC fan. They all have different characteristics in terms of operation.","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123989829","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Bare Necessities 生活必需品
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-3
S. C. Gülen
{"title":"Bare Necessities","authors":"S. C. Gülen","doi":"10.1201/9780429244360-3","DOIUrl":"https://doi.org/10.1201/9780429244360-3","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"185 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122161823","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrated Gasification Combined Cycle 综合气化联合循环
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-18
S. C. Gülen
{"title":"Integrated Gasification Combined Cycle","authors":"S. C. Gülen","doi":"10.1201/9780429244360-18","DOIUrl":"https://doi.org/10.1201/9780429244360-18","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132989132","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Gas Turbine 燃气轮机
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-4
S. C. Gülen
{"title":"Gas Turbine","authors":"S. C. Gülen","doi":"10.1201/9780429244360-4","DOIUrl":"https://doi.org/10.1201/9780429244360-4","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"80 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131827017","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Repowering 重新提供动力
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-17
S. C. Gülen
{"title":"Repowering","authors":"S. C. Gülen","doi":"10.1201/9780429244360-17","DOIUrl":"https://doi.org/10.1201/9780429244360-17","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133005506","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Construction and Commissioning 施工及调试
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-11
S. C. Gülen
{"title":"Construction and Commissioning","authors":"S. C. Gülen","doi":"10.1201/9780429244360-11","DOIUrl":"https://doi.org/10.1201/9780429244360-11","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"118 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127976630","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Economics 经济学
Gas Turbine Combined Cycle Power Plants Pub Date : 2019-12-06 DOI: 10.1201/9780429244360-13
S. C. Gülen
{"title":"Economics","authors":"S. C. Gülen","doi":"10.1201/9780429244360-13","DOIUrl":"https://doi.org/10.1201/9780429244360-13","url":null,"abstract":"","PeriodicalId":392515,"journal":{"name":"Gas Turbine Combined Cycle Power Plants","volume":"158 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116913684","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信