{"title":"Multi-objective optimisation of profile accuracy in two point incremental forming using Taguchi-based grey relation analysis","authors":"A. Ragab","doi":"10.1504/IJCENT.2018.10013327","DOIUrl":"https://doi.org/10.1504/IJCENT.2018.10013327","url":null,"abstract":"This study investigates the effect of four key process parameters in two point incremental forming (TPIF) on the profile accuracy of the manufactured parts. The experiment was applied to A1050-H14 commercial aluminium sheets under different values for tool diameter, feed rate, vertical step size, and sheet thickness. The experiments were designed using the Taguchi L8 orthogonal array. Profile accuracy was estimated by measuring four quality parameters, namely, circularity error, waviness error, depth error, and side wall angle error. Analysis of variance (ANOVA) was used for studying the significance of each process parameter. Grey relational analysis (GRA) was then used to perform a multi-objective optimisation of the four quality parameters simultaneously. The results showed that while each quality parameter may be optimised separately, it is considerably difficult to optimise all of them together. In practice, a compromise must be made based on the profile feature necessary in a given situation.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"34 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123822311","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Developing a genetic-based multi-objective algorithm to optimise job shop scheduling problems","authors":"Mohammed M. Hussein, Abdelrahman Elgendy","doi":"10.1504/IJCENT.2018.10013226","DOIUrl":"https://doi.org/10.1504/IJCENT.2018.10013226","url":null,"abstract":"Dynamic job shop scheduling is one of the problems that get little attention in literature as it is known as an NP-hard combinatorial optimisation problem. Few researchers handled the mathematical model and the approaches of optimising the schedule efficiency and stability. As events such as (machine breakdown, arriving new jobs or processing time variation) are hard to be formulated in a mathematical model, this research introduces a dynamic multi-objective genetic algorithm based on partial repair reactive strategy. The reactive strategy is selected to deal with the dynamic nature of job shop by applying partial repair policy for optimising the scheduling efficiency and the schedule stability simultaneously. Experimental results show that the proposed algorithm provided better solutions than key problem solutions in dynamic job shop scheduling problems published in literature.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"51 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131146665","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Improvement of refinery maintenance and mechanical services: application of lean manufacturing principles","authors":"B. Chowdary, K. Ojha, Arlene Alexander","doi":"10.1504/IJCENT.2018.10013311","DOIUrl":"https://doi.org/10.1504/IJCENT.2018.10013311","url":null,"abstract":"Purpose: The aim of this paper is to show a successful improvement in operations with the implementation of lean manufacturing strategies in a Caribbean oil and gas company. Design/Methodology: Initially, a review of literature was performed on lean manufacturing (LM) tools. Then interviews and GEMBA walkthrough was carried out in the selected case organisation followed by the problems faced were analysed using value stream map (VSM) together with root cause analysis tools. At the end, future state VSM was developed and the benefits due to implementation of LM principles were quantified. Findings: The study revealed that a traditional approach is currently being used on the shop floor thus increasing the opportunity for hidden wastes between the processes as well as increased repair time due to defective equipment. The results concluded that improved shop floor utilisation, reduction in preparation time and hidden wastes were identified on the shop floor. Originality/value: The review of literature indicated that implementation of the lean principles in the Caribbean oil and gas sector has not been explored. Further, the study results provide a road map for similar organisations to achieve operational improvement but also is valuable for academic and research community for practical implementation of lean principles.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128736815","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"An empirical investigation of enterprise systems adoption in small and medium enterprises","authors":"Amin A. Shaqrah","doi":"10.1504/IJCENT.2018.10013316","DOIUrl":"https://doi.org/10.1504/IJCENT.2018.10013316","url":null,"abstract":"Enterprise systems (ES) has intensely automated and integrated the whole business functions if adopted. The most critical of the ES adoption criteria: environmental pressure; perceived ease of use; readiness; and perceived usefulness. The mentioned criteria were studied along with 60 several kinds small and medium-sized enterprises (SMEs). To investigate the data were collected researcher applying convergent and discriminant factor analyses using EQS 6.3 and SPSS 21. The study has concluded that all suggested criteria play the main factors of ES adoption in SMEs. Results, implications for the SMEs managers, and government role are discussed.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"24 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133907538","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Challenges to implementing additive manufacturing in globalised production environments","authors":"I. F. Ituarte, Siavash H. Khajavi, J. Partanen","doi":"10.1504/IJCENT.2016.082335","DOIUrl":"https://doi.org/10.1504/IJCENT.2016.082335","url":null,"abstract":"This paper presents the current state of additive manufacturing (AM) implementation in complex supply chains, focusing especially on the globalised consumer electronics industry. A literature review sought to identify bottlenecks to technology transfer, while a qualitative study was carried out using interviews with case company personnel. Finally, an industry survey was used to quantitatively evaluate current production costs and delivery times for AM units. The results highlight the considerable barriers to transferring AM technology to engineering applications. However, there is an untapped potential for manufacturing applications in small-series and pre-series production at the product refinement stages. Furthermore, future projections of AM production throughput and cost reductions will disrupt organisational supply chains. This will lead organisations to create faster design, development and manufacturing cycles, unlocking novel applications and introducing new possibilities to change product architecture at any stage of the product development while compressing the supply chain and allowing for quick responses to changing customer demands.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"15 12 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127661579","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Causes of cost overruns on infrastructure projects in Saudi Arabia","authors":"F. Allahaim, Li Liu","doi":"10.1504/ijcent.2015.073176","DOIUrl":"https://doi.org/10.1504/ijcent.2015.073176","url":null,"abstract":"This paper reports an up-to-date ranked list of causes of cost overrun in Saudi Arabia from a survey of 160 project managers of infrastructure projects. The top five causes were market conditions, design changes, the practice of assigning a contract to the lowest bidder, delays and design error. Assigning a contract to the lowest bidder is not ranked in the top five reasons in other countries. Other factors contributing to cost overrun of Saudi infrastructure projects include lack of contractor and consultant planning before the project, poor coordination with government agencies and parallel contracts, inconsistent management strategy, poor client staff communication and stakeholders' lack of participation during the conceptual phase. A cause unique to Saudi Arabia is due to the time it takes the Labour Ministry to issue labour visas to non-national workers.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2015-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122353255","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Economic production of VAc and VEOVA 10 emulsion polymer using factorial design","authors":"I. A. Sabbah, Tamer A. Mohamed, H. Nasr, S. Emam","doi":"10.1504/ijcent.2015.073184","DOIUrl":"https://doi.org/10.1504/ijcent.2015.073184","url":null,"abstract":"Emulsion polymerisation of vinyl acetate (VAc) and vinyl ester of versatic acid (VEOVA 10) was carried out using different feed composition ratios. The copolymer emulsion was characterised by measuring the morphological properties (average particle diameter, D) by using the transmission electron microscope (TEM), minimum film forming temperature (MFFT) and filtration residue (ppm). The results of the study indicate that the average particle diameter of emulsion (D) decreases with the increase of the amount of VEOVA 10 content (and subsequently decreases the amount of VAc), also the ppm and the MFFT is decreased. These results were illustrated using response surface methodology and contour plots. In this paper, the economic production of VAc and VEOVA 10 emulsion polymer was studied to ensure the best performance of all properties at minimum cost utilising multi-objective optimisation methodology.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2015-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124196524","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Arafa S. Sobh, Sameh A. Salem, R. Darwish, Mohammed Hussein, O. Karam
{"title":"Unsupervised clustering of materials properties using hierarchical techniques","authors":"Arafa S. Sobh, Sameh A. Salem, R. Darwish, Mohammed Hussein, O. Karam","doi":"10.1504/ijcent.2015.073182","DOIUrl":"https://doi.org/10.1504/ijcent.2015.073182","url":null,"abstract":"Data mining (DM) algorithms arose as a promising and flourishing discipline at manufacturing and industrial engineering. This paper proposes an efficient decision support approach for manufacturing engineering. The proposed approach tackles clustering challenges for engineering materials properties. It adopts the hierarchal clustering for mining engineering materials properties. Extensive experiments and comparisons are conducted on three different real-world datasets for engineering materials properties. In addition, a study of different similarity measures is carried out to choose the best fit similarity measure to engineering material datasets. A comparison of the results with other competitors clearly shows the robustness of the proposed approach. Therefore, it is highly recommended to use the proposed approach as a scalable engineering material properties tool.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2015-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123275768","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Developing online approaches to visually inspect quality characteristics with known tolerances","authors":"Mohammed Hussein, S. Diab","doi":"10.1504/IJCENT.2015.073175","DOIUrl":"https://doi.org/10.1504/IJCENT.2015.073175","url":null,"abstract":"In this work, new approaches for online 100% visual inspection are introduced. Unlike the traditional visual inspection approaches that testing the complete similarity of the inspected unit with a master one, the developed approaches test whether each quality characteristic in the product falls within its specified tolerance band. In the first approach, some statistical indices were used, e.g., correlation, to decide whether the dimensions of the inspected product are within specs. This approach is then modified, and each key dimension is treated alone to know which one (if any) falls beyond its tolerance zone. A third approach is introduced in which a feature of each quality characteristic is developed, and a NN model is used to determine whether this quality characteristic comply with its specs. The decision is released in the real time such that an out of control situation can be treated immediately.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"103 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2015-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128154329","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Managing the uncertainty in time scheduling of public construction works in Greece","authors":"D. Giannoulis, K. Salonitis","doi":"10.1504/IJCENT.2015.073177","DOIUrl":"https://doi.org/10.1504/IJCENT.2015.073177","url":null,"abstract":"The construction of public works in Greece usually faces in practice significant deviations from its time scheduling. The aim of this paper is to study and evaluate the possibilities of managing these uncertainties by applying a probabilistic approach mainly based on the method of Monte Carlo simulation. State-of-the-art software was used allowing a better integration of different sources of uncertainty into the time scheduling. The software was applied in an already constructed work and the results were compared with real recorded data. The application demonstrated the strong performance of the Monte Carlo Method and its ability to deal efficiently with uncertainty. The divergence between the results of the Monte Carlo Method and the real data disclosed some structural weaknesses of the ruling framework of public works in Greece that extent the uncertainties. Finally, suggestions are discussed for institutional changes that will assist in a more efficient and accurate time scheduling of the Greek public works.","PeriodicalId":390935,"journal":{"name":"International Journal of Collaborative Enterprise","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2015-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134497997","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}