{"title":"MULTI-DISCIPLINARY FRAMEWORK FOR IPPD IN AERONAUTICAL INDUSTRY","authors":"U. Menon, M. Graham, G. Thompson","doi":"10.1615/faim1996.490","DOIUrl":"https://doi.org/10.1615/faim1996.490","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116842657","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"FIXTURE ORIENTATED PLANNING WITHIN FLEXIBLE MACHINING SYSTEMS","authors":"S. Rahimifard, S. Newman","doi":"10.1615/faim1996.840","DOIUrl":"https://doi.org/10.1615/faim1996.840","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"108 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116081375","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DESIGN OF A MODULAR PRODUCT ARCHITECTURE AND A CELLULAR MANUFACTURING LAYOUT: A CONCURRENT ENGINEERING APPROACH","authors":"J. Slomp","doi":"10.1615/faim1996.560","DOIUrl":"https://doi.org/10.1615/faim1996.560","url":null,"abstract":"This paper formalizes the problem of a concurrent design of a modular product architecture and a cellular manufacturing layout and presents a way to deal with this design problem. First, the different types of a modular product architecture are explained as well as important implications of modularity for the manufacturing process. Several advantages of a modular product architecture refer to the manufacturing process of the product. Second, it is shown that the extent in which assembly tasks are performed in the cells strongly determines the advantages of a cellular manufacturing layout. These two facts ask for a simultaneous consideration of modular product design and the design of the manufacturing layout (i.e., manufacturing cells in which parts are manufactured and modules are assembled). The relation between product design and manufacturing process is described in this paper by means of four relation matrices: a module-module matrix, a module-machine matrix, a machine-part matrix, and a part-part matrix. On the basis of this description, a systematic approach is developed to support the concurrent design of modules and manufacturing cells. The experiences of two firms are included in the paper and illustrate the advantages of including assembly activities in manufacturing cells.","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127827780","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"WEB-BASED GRAPHICAL USER INTERFACES TO MONITOR AND CONTROL DISTRIBUTED CIM SYSTEMS","authors":"William G. Davis, J. Heim","doi":"10.1615/faim1996.670","DOIUrl":"https://doi.org/10.1615/faim1996.670","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"384 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122092850","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"AUTOMATIC GENERATION OF ALL GEOMETRICALLY FEASIBLE ASSEMBLY SEQUENCES USING SOLID MODELLING","authors":"S. Golabi, K. Abhary, L. Luong","doi":"10.1615/faim1996.720","DOIUrl":"https://doi.org/10.1615/faim1996.720","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"22 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123835500","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ENHANCING VISION DATA USING PRIOR KNOWLEDGE","authors":"A. Redford, K. Khalili","doi":"10.1615/faim1996.210","DOIUrl":"https://doi.org/10.1615/faim1996.210","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131354404","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"SCHEDULING OPTIMIZATION IN AN ACTUAL JOB-SHOP","authors":"C. Sheahan, Peter Williams, Michael T. Hillery","doi":"10.1615/faim1996.880","DOIUrl":"https://doi.org/10.1615/faim1996.880","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"737 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133609463","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"INTEGRATION OF AN MRP II SOFTWARE AND CIM COMPONENTS","authors":"G. Barbarosoglu, Emre Kabas","doi":"10.1615/faim1996.630","DOIUrl":"https://doi.org/10.1615/faim1996.630","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132078583","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"A 3-STEP METHOD TO DESIGN A TESTING SYSTEM FACING TESTING PROBLEMS","authors":"P. Lutz","doi":"10.1615/faim1996.480","DOIUrl":"https://doi.org/10.1615/faim1996.480","url":null,"abstract":"","PeriodicalId":380191,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1996","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114868305","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}