Visualization in Engineering最新文献

筛选
英文 中文
Deconstruction waste management through 3d reconstruction and bim: a case study 基于三维重建和bim的建筑垃圾管理案例研究
Visualization in Engineering Pub Date : 2017-07-14 DOI: 10.1186/S40327-017-0050-5
X. Ge, P. Livesey, Jun Wang, Shoudong Huang, Xian-Chen He, Chengqi Zhang
{"title":"Deconstruction waste management through 3d reconstruction and bim: a case study","authors":"X. Ge, P. Livesey, Jun Wang, Shoudong Huang, Xian-Chen He, Chengqi Zhang","doi":"10.1186/S40327-017-0050-5","DOIUrl":"https://doi.org/10.1186/S40327-017-0050-5","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0050-5","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41796582","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 65
Reasoning about accessibility for disabled using building graph models based on BIM/IFC 基于BIM/IFC的建筑图形模型对残疾人无障碍的推理
Visualization in Engineering Pub Date : 2017-06-15 DOI: 10.1186/S40327-017-0048-Z
B. Strug, G. Ślusarczyk
{"title":"Reasoning about accessibility for disabled using building graph models based on BIM/IFC","authors":"B. Strug, G. Ślusarczyk","doi":"10.1186/S40327-017-0048-Z","DOIUrl":"https://doi.org/10.1186/S40327-017-0048-Z","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0048-Z","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41399087","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 18
Impact of linear correlation on construction project performance using stochastic linear scheduling 基于随机线性调度的线性相关性对建设项目绩效的影响
Visualization in Engineering Pub Date : 2017-04-27 DOI: 10.1186/S40327-017-0045-2
R. Eiris Pereira, I. Flood
{"title":"Impact of linear correlation on construction project performance using stochastic linear scheduling","authors":"R. Eiris Pereira, I. Flood","doi":"10.1186/S40327-017-0045-2","DOIUrl":"https://doi.org/10.1186/S40327-017-0045-2","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0045-2","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42817476","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
GIS-based visualization of integrated highway maintenance and construction planning: a case study of Fort Worth, Texas 基于GIS的公路养护与建设综合规划可视化研究——以德克萨斯州沃斯堡市为例
Visualization in Engineering Pub Date : 2017-04-26 DOI: 10.1186/S40327-017-0046-1
J. France-Mensah, William J. O'brien, N. Khwaja, Loyl C. Bussell
{"title":"GIS-based visualization of integrated highway maintenance and construction planning: a case study of Fort Worth, Texas","authors":"J. France-Mensah, William J. O'brien, N. Khwaja, Loyl C. Bussell","doi":"10.1186/S40327-017-0046-1","DOIUrl":"https://doi.org/10.1186/S40327-017-0046-1","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0046-1","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44444003","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 27
BIM-Driven components library for Islamic Facilities (BIM-IF) bim驱动的伊斯兰设施组件库(BIM-IF)
Visualization in Engineering Pub Date : 2017-04-18 DOI: 10.1186/S40327-017-0041-6
A. Almaimani, N. Nawari
{"title":"BIM-Driven components library for Islamic Facilities (BIM-IF)","authors":"A. Almaimani, N. Nawari","doi":"10.1186/S40327-017-0041-6","DOIUrl":"https://doi.org/10.1186/S40327-017-0041-6","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0041-6","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43134040","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization 资源加载的管段制造进度安排:材料供应驱动的优化
Visualization in Engineering Pub Date : 2017-04-11 DOI: 10.1186/S40327-017-0044-3
Jing Liu, M. Soleimanifar, Ming Lu
{"title":"Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization","authors":"Jing Liu, M. Soleimanifar, Ming Lu","doi":"10.1186/S40327-017-0044-3","DOIUrl":"https://doi.org/10.1186/S40327-017-0044-3","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-04-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0044-3","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49244726","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Data completion in building information management: electrical lines from range scans and photographs 建筑信息管理中的数据完成:测距扫描和照片中的电线
Visualization in Engineering Pub Date : 2017-03-21 DOI: 10.1186/S40327-017-0042-5
Ulrich Krispel, H. Evers, M. Tamke, T. Ullrich
{"title":"Data completion in building information management: electrical lines from range scans and photographs","authors":"Ulrich Krispel, H. Evers, M. Tamke, T. Ullrich","doi":"10.1186/S40327-017-0042-5","DOIUrl":"https://doi.org/10.1186/S40327-017-0042-5","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0042-5","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44221017","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Barriers and facilitators for BIM use among Swedish medium-sized contractors - “We wait until someone tells us to use it” 瑞典中型承包商使用BIM的障碍和促进因素——“我们等待,直到有人告诉我们使用它”
Visualization in Engineering Pub Date : 2017-03-21 DOI: 10.1186/S40327-017-0040-7
P. Bosch-Sijtsema, Anders Isaksson, M. Lennartsson, Henrik C. J. Linderoth
{"title":"Barriers and facilitators for BIM use among Swedish medium-sized contractors - “We wait until someone tells us to use it”","authors":"P. Bosch-Sijtsema, Anders Isaksson, M. Lennartsson, Henrik C. J. Linderoth","doi":"10.1186/S40327-017-0040-7","DOIUrl":"https://doi.org/10.1186/S40327-017-0040-7","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0040-7","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46726516","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 83
A logic-based representation and tree-based visualization method for building regulatory requirements 用于构建法规需求的基于逻辑的表示和基于树的可视化方法
Visualization in Engineering Pub Date : 2017-03-16 DOI: 10.1186/S40327-017-0043-4
Jiansong Zhang
{"title":"A logic-based representation and tree-based visualization method for building regulatory requirements","authors":"Jiansong Zhang","doi":"10.1186/S40327-017-0043-4","DOIUrl":"https://doi.org/10.1186/S40327-017-0043-4","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2017-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-017-0043-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45190344","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
A review of tertiary BIM education for advanced engineering communication with visualization 基于可视化的高等工程沟通BIM教育综述
Visualization in Engineering Pub Date : 2016-06-16 DOI: 10.1186/S40327-016-0038-6
Amarnath Chegu Badrinath, Y. Chang, S. Hsieh
{"title":"A review of tertiary BIM education for advanced engineering communication with visualization","authors":"Amarnath Chegu Badrinath, Y. Chang, S. Hsieh","doi":"10.1186/S40327-016-0038-6","DOIUrl":"https://doi.org/10.1186/S40327-016-0038-6","url":null,"abstract":"","PeriodicalId":37417,"journal":{"name":"Visualization in Engineering","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2016-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1186/S40327-016-0038-6","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"65854598","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 63
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信