{"title":"Internal performance contracts: A case of the National Water and Sewerage Corporation in Uganda","authors":"Marine Colon, S. Mugisha","doi":"10.2166/9781780405964_0023","DOIUrl":"https://doi.org/10.2166/9781780405964_0023","url":null,"abstract":"","PeriodicalId":366606,"journal":{"name":"Performance-Based Contracts (PBC) for Improving Utilities Efficiency","volume":"52 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132655823","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Performance-based contracts (PBC) and regulatory issues","authors":"S. Berg, R. N. Gakubia","doi":"10.2166/9781780405964_0103","DOIUrl":"https://doi.org/10.2166/9781780405964_0103","url":null,"abstract":"","PeriodicalId":366606,"journal":{"name":"Performance-Based Contracts (PBC) for Improving Utilities Efficiency","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132701014","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Performance-based service contracts in Navi Mumbai","authors":"V. Padmanabhan","doi":"10.2166/9781780405964_0033","DOIUrl":"https://doi.org/10.2166/9781780405964_0033","url":null,"abstract":"","PeriodicalId":366606,"journal":{"name":"Performance-Based Contracts (PBC) for Improving Utilities Efficiency","volume":"94 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122407085","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Performance-based contracts in Malawi: Teamwork works","authors":"S. Veenstra, Alfonso Chikuni, Andrew Thawe","doi":"10.2166/9781780405964_0121","DOIUrl":"https://doi.org/10.2166/9781780405964_0121","url":null,"abstract":"","PeriodicalId":366606,"journal":{"name":"Performance-Based Contracts (PBC) for Improving Utilities Efficiency","volume":"13 8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132498529","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}