Proceedings of 10th World Construction Symposium 2022最新文献

筛选
英文 中文
The impact of procurement method on construction time waste 采购方式对施工时间浪费的影响
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.73
K. Hewamulla, H. Jayasena, K. Guruge
{"title":"The impact of procurement method on construction time waste","authors":"K. Hewamulla, H. Jayasena, K. Guruge","doi":"10.31705/wcs.2022.73","DOIUrl":"https://doi.org/10.31705/wcs.2022.73","url":null,"abstract":"Selection of the most appropriate procurement method for a proposed project is challenging because there are many factors to be evaluated in deciding. This study focuses on the impact of procurement method on construction time waste, and it was conducted to find how the time wastage varies according to the selected procurement route. Such knowledge is important in making better decisions when selecting a procurement method. Accordingly, the research aim was set to find the significant differences of time waste between traditional and design and build procurement methods. this research was conducted from a quantitative approach, deductive theory data collected through an online survey, and for data analysis using descriptive statistics. Twenty-two (22) number of time waste factors were identified through literature review. survey respondents weighted the significance of each factor between traditional and design and build procurement methods. Ten (10) factors caused significantly higher time waste in traditional method and none of the factors caused higher time waste in design and build method. Accordingly, the study concludes that time waste in traditional procurement is generally higher in traditional procurement method compared to design and build procurement method.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123641805","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Exploring the lesson learnt by implementing e-tendering: A review of literature 探讨实施电子投标的经验教训:文献综述
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.39
K. Kajendran
{"title":"Exploring the lesson learnt by implementing e-tendering: A review of literature","authors":"K. Kajendran","doi":"10.31705/wcs.2022.39","DOIUrl":"https://doi.org/10.31705/wcs.2022.39","url":null,"abstract":"For the success of a construction project, the selection of the most suitable contractor is vital. The process of selecting the most suitable contractor is called tendering. Unexceptional to other industries, the construction industry all over the world is also being urged to move to advanced information technologies to compete in the global market. Addressing globalization along with the introduction of Building Information Modelling (BIM), it becomes crucial for the tendering process to move from traditional to electronic tendering (e-tendering). This study identifies the application of e-tendering in different countries and the outcomes and readiness of Sri Lanka to accept e-tender through an extant literature review. It was concluded that e-tendering benefits through high transparency and accountability, less corruption, less cost, time and paperwork, and easy evaluation of submitted tenders if rightly implemented addressing the challenges such as legal and security issues, resistance to change, less investment in Information Technology, unawareness of the process of e-tendering and non-identical software and formats. Further, considering Sri Lanka’s readiness in adopting etendering, the country’s government has considerably progressed towards e-government but not has been fully implemented. This study would be beneficial for the government and private clients who are willing to practice e-tendering.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129796058","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Level of risk management knowledge among construction project managers in Sri Lanka 斯里兰卡建筑项目经理的风险管理知识水平
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.51
D.S.M. Welikala, H. Jayasena, Bkc Perera
{"title":"Level of risk management knowledge among construction project managers in Sri Lanka","authors":"D.S.M. Welikala, H. Jayasena, Bkc Perera","doi":"10.31705/wcs.2022.51","DOIUrl":"https://doi.org/10.31705/wcs.2022.51","url":null,"abstract":"Risk management often becomes a significant concern among the construction professionals especially due to the complex nature of the industry. Though it is a popular subject in project management discipline, it was observed that authentic application of the principles of risk management at times is arguable in practice. As a Project Manager who is a key role player in a project, it is vital to have a solid knowledge on risk management and its related arena. Evidence was found of limited risk management knowledge among construction professionals. Therefore, a study was conducted to find the status of risk management knowledge among the construction Project Managers in Sri Lanka. A mixed method approach was followed by a comprehensive literature review on elements of body of knowledge of risk management and later a questionnaire survey to contextualise the status of the knowledge gap of Project Managers in real. According to the findings of the study, it could be concluded that Sri Lankan Project Managers are not fully confident on their risk management knowledge. It was primarily likely to be due to the limited learning in the subject area when pursuing higher studies. The study also identifies the options to device appropriate strategies to improve risk management knowledge among the Construction Project Managers in Sri Lanka","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122631367","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Factors affecting construction time performance in high-rise building projects in Sri Lanka. 斯里兰卡高层建筑项目施工时间绩效的影响因素
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.40
K. Kilintan, B. Perera, P. Kajavathani
{"title":"Factors affecting construction time performance in high-rise building projects in Sri Lanka.","authors":"K. Kilintan, B. Perera, P. Kajavathani","doi":"10.31705/wcs.2022.40","DOIUrl":"https://doi.org/10.31705/wcs.2022.40","url":null,"abstract":"On-time completion is one of the most important criteria for recent successful construction projects. High-rise building projects face significant risks and time constraints due to the complexity and dynamic nature of their environments. Demand for high rise buildings has been fuelled by economic advancements, rapid suburbanization, and increased consumer spending in Sri Lanka. High-rise building developments require a large amount of funding, permissions and procedures, advanced construction methods, and collaboration between many project participants. Delays have been observed regularly in high-rise buildings, yet studies on factors affecting construction time performance (CTP) are scarce in the Sri Lankan context. Therefore, this study focused on the factors affecting CTP in high-rise building projects in Sri Lanka. If the factors were identified at early stages, they could be minimised or even mitigated and the chance of future occurrences can be minimised. The study used a qualitative approach. Factors affecting CTP were identified through the literature review. The required data were collected from a series of semi-structured interviews identified from purposive sampling. The data were analysed using manual content analysis and validated for high-rise building projects using semi-structured interviews. Fifty-four factors were identified under six categories, including owner, contractor, consultant, contract, contractual relationships and external factors. New additional factor mismatches between the design and budgets are identified. Further, interviewees endorsed 49 factors that were considered as factors that significantly affect CTP. The study would help raise awareness to improve CTP in high-rise building projects.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131937759","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Functional characteristics of an early warning system to minimise the risks of dam breaks in Sri Lanka 早期预警系统的功能特点,以尽量减少斯里兰卡大坝溃坝的风险
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.41
Lnk Weerasinghe, M. Thayaparan, T. Fernando
{"title":"Functional characteristics of an early warning system to minimise the risks of dam breaks in Sri Lanka","authors":"Lnk Weerasinghe, M. Thayaparan, T. Fernando","doi":"10.31705/wcs.2022.41","DOIUrl":"https://doi.org/10.31705/wcs.2022.41","url":null,"abstract":"Dams have become a very important infrastructure that provides enormous benefits to the economy of the country. Even though dams are very important and significant structures within a country, their breaks can cause severe damage to the country’s economy, society, and environment. Other than that, it can be impacted human life by causing deaths. As a come-up strategy, early warning systems can be used to reduce the severe impacts of dam breaks. Early warning systems (EWS) have been identified as a very important tool used to save lives and properties from disasters. Hence, this paper attempts to identify the functional characteristics of an EWS that can be used to reduce the impacts of dam breaks in Sri Lanka. An extensive literature survey was conducted to achieve the primary objective of this paper. Accordingly, the paper has identified the major purposes of dams, the causes for the dam breaks, and the impacts of dam breaks on the economy, society, and the environment. Then, the paper explores the functional characteristics of the EWS which is used for dam breaks. Finally, a conceptual framework has been developed with the key literature findings of the paper in order to minimise the social, economic, and environmental impacts created by dam breaks using early warning systems in Sri Lanka. As such, this paper will be a value addition to support the country’s economy, society, as well as environment.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"21 36","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114043819","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A methodology to study the complexity of buildability in construction projects: Phenomenological research perspective 建筑项目可建造性复杂性的研究方法:现象学研究视角
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.2
P. Wimalaratne, U. Kulatunga
{"title":"A methodology to study the complexity of buildability in construction projects: Phenomenological research perspective","authors":"P. Wimalaratne, U. Kulatunga","doi":"10.31705/wcs.2022.2","DOIUrl":"https://doi.org/10.31705/wcs.2022.2","url":null,"abstract":"The construction industry is crucial to the economic development of any nation. However, the achievement of the project objectives has become challenging in the construction industry. Thus, research on improving the construction project performance is often appealed. One of the reasons for poor performance in the construction industry has been identified as lack of buildability. Buildability is expected to give a boost to construction project performance throughout the entire project life cycle. Even though the existing knowledge domain suggests various buildability guidelines, appraisal systems, and concepts targeting different phases or different elements of construction, there is no established set of practices or directives that can be incorporated into a construction project throughout its various stages to improve construction project performance. This is mainly due to the absence of clear identification of the deep meaning of the key drivers of the buildability concept. Therefore, it is important to obtain a clear picture of the key drivers of this concept. This challenge may be handled by obtaining perception from the industry experts with regard to their lived experience concerning buildability. This paper utilises works of literature related to research methodology to design a suitable research framework for this study. The research onion model was adopted for the framework development and phenomenological philosophy was proposed with Interpretative Phenomenological Analysis (IPA). The paper highlights the importance of adherence to micro-interactions and a systematic approach to research work throughout the research process to maintain the quality of the study.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116897085","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Efficient workplace planning and designing strategies to reduce waiting time in the outpatient departments (OPD) of government hospitals in Sri Lanka 有效的工作场所规划和设计战略,以减少斯里兰卡政府医院门诊部的等待时间
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.33
D. Pathirana, N. De Silva
{"title":"Efficient workplace planning and designing strategies to reduce waiting time in the outpatient departments (OPD) of government hospitals in Sri Lanka","authors":"D. Pathirana, N. De Silva","doi":"10.31705/wcs.2022.33","DOIUrl":"https://doi.org/10.31705/wcs.2022.33","url":null,"abstract":"The waiting time is a major challenge for government hospitals around the world, particularly in developing countries, due to inefficient design and limited facilities. This waiting time causes long queues, especially in service providing facilities. Hence, queuing is considered a key performance indicator when evaluating the performance of healthcare facilities. The outpatient department (OPD) is the main division of a hospital that handles a large number of patients daily. This research aimed to provide solutions for minimising waiting time in OPD premises through efficient planning and designing strategies. This study applied the queuing theory for two case studies to analyse the waiting time of the patients at the OPD. Hospital records and field observations were used to gather data. Further solutions for minimising the waiting time were identified using semi-structured interviews with hospital management and a questionnaire survey with patients at OPD. Field observations revealed that there were long waiting queues and long waiting times at the registration counter and the consultant rooms. Due to increased demand for OPD services, unnecessary arrivals, a lack of resources, and patients’ ignorance of OPD procedures were identified as causes of overcrowding. Further, to minimise waiting time at the OPD, it should leverage the efficient designs with properly placed inquiry counters, walkways, and directions; provide adequate facilities such as a spacious waiting area, and restructuring should be implemented. The findings of the research mark valuable insights into government hospitals, and the proposed solutions will be useful for hospital management.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114731829","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Strategies adopted by design and build contractors to enhance the implementation of sustainable construction practices 设计及建造承建商采取的策略,以加强可持续建筑的实施
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.60
B.K.M. Nadeetharu, U. Kulatunga
{"title":"Strategies adopted by design and build contractors to enhance the implementation of sustainable construction practices","authors":"B.K.M. Nadeetharu, U. Kulatunga","doi":"10.31705/wcs.2022.60","DOIUrl":"https://doi.org/10.31705/wcs.2022.60","url":null,"abstract":"Despite of design and build (D&B) procurement being a feasible solution, the status of the implementation of sustainable construction practices (SCP) in the Sri Lankan construction industry is below the trend. Since unwillingness and unawareness of the D&B contractors have identified as a cause for the issue, strategies to overcome the problem are required. Accordingly, an extensive literature review was conducted to identify the SCP, and D&B concepts to provide a basis for a reliable set of strategies. Subsequently, the survey strategy under the qualitative research approach was accompanied to derive strategies. Accordingly, collected data from nine expert interviews from the purposively selected clients, contractors, consultants, and subcontractors have been analysed using deductive thematic analysis under eight main pre-defined themes. Appointment of a sustainability manager, market survey to recognise the status of sustainability, concern on passive construction technologies and identification of sustainable design requirements have identified as key strategies. Finally, this can be used by D&B contractors to identify the loopholes and enhance sustainable development","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121605952","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Electricity generation through municipal solid waste in Sri Lanka: Drivers and barriers 斯里兰卡通过城市固体废物发电:驱动因素和障碍
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.34
T. Karunarathna, P. Sridarran, M. Gowsiga
{"title":"Electricity generation through municipal solid waste in Sri Lanka: Drivers and barriers","authors":"T. Karunarathna, P. Sridarran, M. Gowsiga","doi":"10.31705/wcs.2022.34","DOIUrl":"https://doi.org/10.31705/wcs.2022.34","url":null,"abstract":"The rapid increase in population and urbanisation has led to an increase in per capita consumption and the generation of waste. Thus, the need of having improved management strategies for Municipal Solid Waste (MSW) has aroused. Waste to Energy (WtE) was a concept that came up as a solution for waste management and as an ideal solution for energy crises as well. WtE is a process of generating energy mainly in terms of electricity and heat by giving MSW as the input where it will become the fuel for this process. Most countries like Denmark, England, Australia, etc. use this as a successful Municipal Solid Waste Management (MSWM) strategy and as a sustainable energy producing mechanism too. But, in Sri Lankan WtE has become unsuccessful in many instances due to the influence of barriers to implementing WtE mega-scale projects. Thus, this study aims to explore existing barriers in light of expanding WtE projects in Sri Lanka. In addition, it proposes strategies to mitigate those barriers. Data was collected through expert interviews and manual content analysis was used for data analysis. Some identified key barriers and strategies in the frame of political, economic, social, technological, legal, and environmental are lack of having government infrastructure, high initial investments, social burdens, lack of technical knowledge on WtE, disposal of bottom and fly ash as barriers and providing infrastructure by the government, introducing debt financing, social awareness, getting foreign technical experts, using bottom ash and fly ash to produce some necessary bi-products as strategies.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"118 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122154717","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Policy-level consideration on marginalised communities in the post-disaster context: A desk study 灾后背景下对边缘化社区的政策层面考虑:案头研究
Proceedings of 10th World Construction Symposium 2022 Pub Date : 2022-06-24 DOI: 10.31705/wcs.2022.54
A. Mendis, P. Disaratna, M. Thayaparan, Y. Kaluarachchi
{"title":"Policy-level consideration on marginalised communities in the post-disaster context: A desk study","authors":"A. Mendis, P. Disaratna, M. Thayaparan, Y. Kaluarachchi","doi":"10.31705/wcs.2022.54","DOIUrl":"https://doi.org/10.31705/wcs.2022.54","url":null,"abstract":"Natural disasters have a disproportionate influence on the lives of those impacted, with the most marginalised often bearing the brunt of the repercussions. As a result, marginalised communities should be expressly considered in post-disaster policy development. While the international community has adopted the concepts of resilience and inclusion, marginalised communities are frequently disregarded in post-disaster management. There is a dearth of literature on the engagement of marginalised communities in Sri Lanka's post-disaster context. Moreover, the policies to support the marginalised communities need to be reviewed to explore the extent to which such policies are implemented to benefit the disadvantaged groups in a disaster situation. Therefore, this paper aims to review the existing policies to improve the engagement of marginalised communities during the post-disaster context in Sri Lanka. To achieve the aim, a comprehensive desk study on significant global and national policies was carried out. Through the desk study, the policies and frameworks related to disaster management were explored in order to identify the inclusion of marginalised communities in the postdisaster context. The policies related to marginalised communities were further explored in order to identify the inclusion of them in post-disaster situations. Finally, the study confirmed that a refinement of the policies in the Sri Lankan context is crucial. Furthermore, as a way forward, the study suggested assessing the current level of implementation of existing policies as well as barriers to implementation in order to increase the inclusion of marginalised communities in Sri Lanka's post-disaster context.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126812699","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书