PERBANDINGAN BEKISTING SISTEM SCAFFOLDING DENGAN BEKISTING SISTEM PERI UP UNTUK PEKERJAAN BALOK DAN PELAT DI TINJAU DARI SEGI BIAYA DAN WAKTU PELAKSANAAN PADA MPP PROJECT OFFICE BUILDING
Structure (Jurnal Sipil) Pub Date : 2022-09-25 DOI: 10.31000/civil.v1i2.6933
Sugeng Purwanto, B. Basirun, S. Suyatno
{"title":"PERBANDINGAN BEKISTING SISTEM SCAFFOLDING DENGAN BEKISTING SISTEM PERI UP UNTUK PEKERJAAN BALOK DAN PELAT DI TINJAU DARI SEGI BIAYA DAN WAKTU PELAKSANAAN PADA MPP PROJECT OFFICE BUILDING","authors":"Sugeng Purwanto, B. Basirun, S. Suyatno","doi":"10.31000/civil.v1i2.6933","DOIUrl":"https://doi.org/10.31000/civil.v1i2.6933","url":null,"abstract":"Dalam pekerjaan konstruksi beton, ada tiga komponen utama yang harus direncanakan dengan matang. Hal tersebut akan mempengaruhi keberhasilan suatu pekerjaan struktur. Ketiga komponen yang utama pada pekerjaan struktur tersebut adalah campuran beton, tulangan dan bekisting. Komponen bekisting adalah cetakan sementara yang harus dapat menahan lendutan yang akan timbul. Oleh karena itu penulis ingin mengetahui sistem bekisting yang efisien dalam pelaksanaan , biaya dan waktu untuk MPP Project Office Building. Dalam perbandingan penggunaan kedua jenis bekisting tersebut, dilakukan studi literature, studi proyek dan studi diskusi atau wawancara terhadap aspek teknis dan operasional dari masing – masing tipe bekisting tersebut. Aspek yang dijadikan sebagai bahan perbandingan meliputi aspek metode pemasangan , biaya, waktu, bahan dan upah pada pekerjaan di MPP Project Office Building. Untuk menentukan metode pelaksanaan yang akan diterapkan, terlebih dahulu di lakukan analisis waktu pelaksanaan maupun biaya pelaksanaan. Hasil analisa biaya didapat dari analisa harga satuan yang dikalikan dengan volume pekerjaan serta biaya sewa peralatan baik itu alat plat maupun balok dari kedua sistem biaya dari bekisting sistem Scaffolding dengan sistem Peri Up.Kata kunci:  Bekisting Sistem Scaffolding, Bekisting Sistem Peri Up, Biaya dan Waktu.","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114878823","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERENCANAAN HIGH RISE BUILDING ATAU BANGUNAN BERTINGKAT DENGAN PERMODELAN KOLOM DAN BALOK TRANSFER
Structure (Jurnal Sipil) Pub Date : 2022-09-25 DOI: 10.31000/civil.v1i2.6929
Brian Alfandi, Rully Angraeni Safitri, D. Purwanto
{"title":"PERENCANAAN HIGH RISE BUILDING ATAU BANGUNAN BERTINGKAT DENGAN PERMODELAN KOLOM DAN BALOK TRANSFER","authors":"Brian Alfandi, Rully Angraeni Safitri, D. Purwanto","doi":"10.31000/civil.v1i2.6929","DOIUrl":"https://doi.org/10.31000/civil.v1i2.6929","url":null,"abstract":"Pembangunan dalam jumlah banyak menyebabkan semakin sempitnya lahan yang dapat digunakan. Pembangunan gedung ke arah vertikal di kota-kota besar menjadi solusi masalah keterbatasan lahan. Suatu bangunan gedung yang berlantai banyak perlu direncanakan dengan tepat dan teliti agar memenuhi kriteria kekuatan (strength), kenyamanan (serviceability), keselamatan (safety), dan umur rencana bangunan (durability).Balok transfer adalah balok yang menerima beban dari kolom di atasnya karena kolom terhenti di atas balok tersebut. Pada dasarnya balok transfer memiliki tugas yang sama dengan balok yang lainnya, yakni menerima beban kerja yang berasal dari pelat. Akan tetapi, kolom terhenti pada balok, maka balok juga menerima beban yang berasal dari kolom diatasnya. Program yang digunakan dalam analisis untuk mendapatkan hasil kinerja struktur gedung bertingkat dengan balok transfer menggunakan program ETABS v.9.7.0. Respon struktur terhadap gempa dipengaruhi oleh bentuk dari struktur gedung tersebut, dimana akibat adanya pemutusan kolom pada lantai membutuhkan dimensi balok yang lebih besar yang disebut dengan balok transfer.Kata kunci: Kolom, balok transfer,pelat,dan analisis dinamik respon spektrum pada program Etabs V.9.7.0","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114747079","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
PERENCANAAN RESERVOIR PENGENDALI BANJIR KOMPLEK SEKNEG KOTA TANGERANG 策划唐郎镇SEKNEG水库洪水控制水库
Structure (Jurnal Sipil) Pub Date : 2019-03-22 DOI: 10.31000/civil.v1i1.6807
Brian Alfandi, Muahammad Ali Mu’min, Wahyu Bagus Prasetya
{"title":"PERENCANAAN RESERVOIR PENGENDALI BANJIR KOMPLEK SEKNEG KOTA TANGERANG","authors":"Brian Alfandi, Muahammad Ali Mu’min, Wahyu Bagus Prasetya","doi":"10.31000/civil.v1i1.6807","DOIUrl":"https://doi.org/10.31000/civil.v1i1.6807","url":null,"abstract":"Pertumbuhan pembangunan dan ekonomi yang pesat berpengaruh langsung terhadap lingkungan sekitar. Salah satunya pengaruh kurang baik pada kondisi lingkungan, timbulnya permasalahan seperti genangan air ataupun banjir menjadi contoh apabila kegiatan pembangunan yang dilakukan tidak memperhitungkan perkiraan debit air hujan, volume pembuangan air dan kebutuhan saluran yang dibutuhkan. Maka dari itu perencanaan pembangunan reservoir ini dilakukan, Perencanaan pembangunan reservoir di komplek Sekneg Kelurahan Panunggangan Utara sebagai salah satu badan penerima aliran air yang berlebih akibat air hujan pada saat musim hujan di Kota Tangerang khususnya sekitar Kelurahan Panunggangan Utara. Perencanaan reservoir itu sendiri diharapkan menjadi kerangka acuan dalam pembangunan, karena di dasari oleh identifikasi topografi, analisa hidrologi, analisa daya dukung tanah, dan lain lain sehingga pada akhirnya bisa di buat perencanaan untuk memudahkan pelaksanaan pembangunan.Kata kunci:  reservoir, topografi, hidrologi, daya dukung tanah","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124684890","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISA DAYA DUKUNG TIANG PONDASI DENGAN MENGGUNAKAN METODE DINAMIK 用动态方法分析地基的动力支持
Structure (Jurnal Sipil) Pub Date : 2019-03-16 DOI: 10.31000/civil.v1i1.6806
Rully Angraeni Safitri, Almufid Almufid, Faris Izzuddin Rusdiyanto3
{"title":"ANALISA DAYA DUKUNG TIANG PONDASI DENGAN MENGGUNAKAN METODE DINAMIK","authors":"Rully Angraeni Safitri, Almufid Almufid, Faris Izzuddin Rusdiyanto3","doi":"10.31000/civil.v1i1.6806","DOIUrl":"https://doi.org/10.31000/civil.v1i1.6806","url":null,"abstract":"Dalam merencanakan suatu bangun diatas tanah, perlu dilakukannya data penyelidikan tanah dilapangan (SPT), agar bisa ditentukan jenis pondasi apah yang digunakan. Pondasi merupakan bangunan struktur yang mentransfer beban dari bangunan atas ke tanah, Pondasi dalam jenis tiang pancang yang sering kita gunakan dan kita lihat. Uji pembebanan harus dilakukan agar mengetahui pondasi yang kita buat bisa atau tidak menahan beban rencana bangunan yang kita design. kapasitas daya dukung ijin tiang pondasi didapat dari data penyelidikan tanah SPT dan bisa dibuktikan dengan hasil interprestasi uji pembebanan dan dibandingkan dengan hasil perencanaan. Salah satu metode analisis perhitungan data penyelidikan tanah SPT mengunakan metode Mayorhof, Uji pembebanan dilakukan beracuan dengan ASTM 1143-81 approved 1994, analisis perhitungan hasil uji interprestasi uji pembebanan mengunakan metode PDA. Analisis perhitungan kapasitas daya dukung ijin tekan tiang pondasi pancang dianggap tunggal. Kata kunci: Mekanika tanah, Pondasi dalam,Mayorhof, Uji tiang pembebanaan PDA,","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"43 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132186703","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS STABILITAS DINDING PENAHAN TANAH APARTMENT TOWER C TRANSPARK 这是对塔外公寓公寓墙壁稳定性的分析
Structure (Jurnal Sipil) Pub Date : 2019-03-15 DOI: 10.31000/civil.v1i1.6805
Jeply Murdiaman, B. Basirun, Agus Rahmat Salim
{"title":"ANALISIS STABILITAS DINDING PENAHAN TANAH APARTMENT TOWER C TRANSPARK","authors":"Jeply Murdiaman, B. Basirun, Agus Rahmat Salim","doi":"10.31000/civil.v1i1.6805","DOIUrl":"https://doi.org/10.31000/civil.v1i1.6805","url":null,"abstract":"Indonesia berada dilokasi zona yang rawan gempa karena Indonesia adalah tempat bertemunya 4 lempeng dunia yaitu, lempeng indo-australia, lempeng eurasia, lempeng filipina, dan lempeng pacific. Maka dari itu jika mendesain bangunan Gedung tinggi bangunan Gedung harus memperhatikan tentang ketahanan gempa terutama pada struktur bawah, pemilihan dan perencanaan jenis pondasi sangatlah penting untuk didesain mampu memikul beban diatasnya. Pondasi juga harus didesain memperhatikan penurunan pada pondasi (differential settlement). Pada studi ini pondasi yang direncanakan adalah bangunan Gedung 10 lantai Universitas Muhammadiyah Klaten dengan menggunakan pondasi rakit dengan kombinasi pilecap menggunakan pondasi tiang bored pile D600 yang didesain melalui program ETABS v17, dengan mengetahui besaran daya dukung pondasi pada masing-masing group pondasi dan tiang pondasi yang kemudian di input pada program ETABS V17 dengan mengasumsikan pondasi sebagai tumpuan springs pada perencanaan ini pondasi rakit dan pile cap diasumsikan sebagai Area Springs dan pondasi tiang bored pile dimodelkan perletakan tumpuan Point Springs menggunakan nilai Kv dan Kh. Pada hasil perencanaan pondasi ini dapat diketahui kekuatan pondasi terhadap geser 1 arah dan geser 2 arah dan dimensi pondasi dengan jumlah tulangan yang yang dibutuhkan. Kata Kunci : Pondasi Rakit, Pilecap, Pondasi Tiang Bored Pile dan ETABS v17","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116755527","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISA PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PEKERJAAN PEMBANGUNAN PROYEK MASJID AL-ISTIGHFAR DI SINDANG PANON, KAB. TANGERANG 分析了KAB SINDANG PANON清真寺建设项目的成本和实施时间的劳动效率。唐人
Structure (Jurnal Sipil) Pub Date : 2019-03-13 DOI: 10.31000/civil.v1i1.6803
Sugeng Purwanto, Brian Alfandi, Elita Tiana
{"title":"ANALISA PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PEKERJAAN PEMBANGUNAN PROYEK MASJID AL-ISTIGHFAR DI SINDANG PANON, KAB. TANGERANG","authors":"Sugeng Purwanto, Brian Alfandi, Elita Tiana","doi":"10.31000/civil.v1i1.6803","DOIUrl":"https://doi.org/10.31000/civil.v1i1.6803","url":null,"abstract":"Dalam perencanaan konstruksi biaya dan waktu merupakan dua hal yang saling terkait. Perencanaan kontruksi yang baik dapat meminimalisir penggunaan biaya dan waktu tersebut. Berdasarkan perencanaan yang telah dilakukan maka saat pelaksanaan pekerjaan kontruksi, seorang kontraktor dapat memperkirakan biaya dan waktu pekerjaan sehingga mampu mengontrol dengan baik pekerjaan di lapangan. Dari perencanaan yang sudah dibuat, diketahui ongkos suatu pekerjaan serta waktu yang dibutuhkan untuk pengerjaannya. Selain itu dari perencanaan tersebut dapat diketahui produktivitas yang harus dicapai perharinya sehingga memudahkan dalam hal pengaturan penggunaan tenaga kerja serta pengontrolan ongkos pekerjaan di lapangan.Pengamatan ini menggunakan jenis data primer dan data sekunder yaitu data primer diperoleh melalui laporan pengamatan langsung di lapangan, dimana hal yang diamati adalah jumlah pekerja, volume pekerjaan dan waktu pengerjaan. Dan data sekunder diperoleh secara tidak langsung melalui sumber lain berupa rencana anggaran biaya, time schedule. Berdasarkan hasil analisa, produktivitas tenaga kerja pembangunan Masjid Al-Istighfar adalah sebesar 64,20%, sehingga produktivitas dilapangan dapat disimpulkan lebih menguntungkan dari produktivitastenaga kerja berdasarkan perencanaan.Berdasarkan analisa waktu yang dibutuhkan untuk menyelesaikan pembangunan Masjid Al-Istighfar berdasarkan perencanaan adalah 422 hari dengan rencana anggaran biaya untuk ongkos pekerjaan sebesar Rp. 362.022.692 sedangkan realisasi dilapangan waktu yang dibutuhkan untuk menyelesaikan Masjid Al-Istighfar adalah 378 hari dengan realisasi biaya pekerjaan sebesar Rp. 324,891,544, Maka dari itu bisa dikatakan dalam realisasi pelaksanaan dilapangan untuk pembangunan Masjid Al-Istighfar lebih cepat 44 hari dari waktu perencanaan dan menghemat pengeluaran ongkos pekerjaan sebesar Rp. 37,131,148Kata kunci:  Perencanaan, Produktivitas, Ongkos Pekerjaan, Perbandingan Rencana Dengan Realisasi.","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129055708","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISA OPTIMALISASI WAKTU PROYEK DENGAN METODE CRASH PROGRAM PADA PROYEK RUMAH SAKIT DI KOTA TANGERANG 利用唐郎市医院项目崩溃的方法进行优化项目时间分析
Structure (Jurnal Sipil) Pub Date : 2019-03-03 DOI: 10.31000/civil.v1i1.6772
S. Haq, Siti Abadiyah, Prandiko Dimastoro
{"title":"ANALISA OPTIMALISASI WAKTU PROYEK DENGAN METODE CRASH PROGRAM PADA PROYEK RUMAH SAKIT DI KOTA TANGERANG","authors":"S. Haq, Siti Abadiyah, Prandiko Dimastoro","doi":"10.31000/civil.v1i1.6772","DOIUrl":"https://doi.org/10.31000/civil.v1i1.6772","url":null,"abstract":"Proyek konstruksi merupakan suatu rangkaian kegiatan yang hanya satu kali dilaksanakan. Manajemen proyek adalah proses merencanakan, mengorganisir, memimpin, dan mengendalikan sumber daya perusahaan untuk mencapai sasaran jangka pendek yang telah ditentukan. Tujuan utama penelitian ini adalah untuk mengetahui jumlah waktu yang dapat dipercepat. Pada proyek Pembangunan Rumah Sakit Hermina Kotabumi dipilih sebagai tempat studi penelitian. Langkah  langkah yang dilakukan adalah menyusun network planning (jaringan kerja) dengan metode Critical Path Method (CPM), menentukan jalur kritis dan melakukan percepatan dengan menggunakan cara crash program untuk mengoptimalkan waktu proyek. Hasil perhitungan menunjukkan waktu pelaksanaan normal proyek adalah 312 hari dengan cara crash program yaitu dengan menambah 1 jam penambahan jam kerja lembur maka proyek dapat dipercepat sebanyak 24 hari. Penambahan jam kerja sebaiknya dilakukan pada pekerjaan-pekerjaan kritis, apabila dilakukan pada semua, maka hanya akan menambah biaya saja sementara waktu yang dipercepat tetap.","PeriodicalId":348812,"journal":{"name":"Structure (Jurnal Sipil)","volume":"77 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128856647","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书