Explosion Risk Modelling 爆炸风险建模
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5207-1_8
J. Vinnem
{"title":"Explosion Risk Modelling","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5207-1_8","DOIUrl":"https://doi.org/10.1007/978-1-4471-5207-1_8","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"82 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121980908","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Lessons from Macondo Accident 马孔多事故的教训
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5207-1_5
J. Vinnem
{"title":"Lessons from Macondo Accident","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5207-1_5","DOIUrl":"https://doi.org/10.1007/978-1-4471-5207-1_5","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126327187","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Use of Risk Indicators for Major Hazard Risk 对重大灾害风险使用风险指标
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5213-2_22
J. Vinnem
{"title":"Use of Risk Indicators for Major Hazard Risk","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5213-2_22","DOIUrl":"https://doi.org/10.1007/978-1-4471-5213-2_22","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134000740","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Evaluation of Personnel Risk Levels 人员风险等级评估
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5213-2_17
J. Vinnem
{"title":"Evaluation of Personnel Risk Levels","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5213-2_17","DOIUrl":"https://doi.org/10.1007/978-1-4471-5213-2_17","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115425728","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Marine Systems Risk Modelling 海洋系统风险建模
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5207-1_10
J. Vinnem
{"title":"Marine Systems Risk Modelling","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5207-1_10","DOIUrl":"https://doi.org/10.1007/978-1-4471-5207-1_10","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128506096","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Fire Risk Modelling 火险模型
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5207-1_7
J. Vinnem
{"title":"Fire Risk Modelling","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5207-1_7","DOIUrl":"https://doi.org/10.1007/978-1-4471-5207-1_7","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131320903","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Approach to Risk Based Design 基于风险的设计方法
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5213-2_19
J. Vinnem
{"title":"Approach to Risk Based Design","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5213-2_19","DOIUrl":"https://doi.org/10.1007/978-1-4471-5213-2_19","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"66 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127208218","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Risk Due to Miscellaneous Hazards 杂项风险
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5207-1_11
J. Vinnem
{"title":"Risk Due to Miscellaneous Hazards","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5207-1_11","DOIUrl":"https://doi.org/10.1007/978-1-4471-5207-1_11","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129744413","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Use of Risk Analysis During the Operations Phase 在操作阶段使用风险分析
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-5213-2_21
J. Vinnem
{"title":"Use of Risk Analysis During the Operations Phase","authors":"J. Vinnem","doi":"10.1007/978-1-4471-5213-2_21","DOIUrl":"https://doi.org/10.1007/978-1-4471-5213-2_21","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121965899","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Presentation of Risk Results from Studies 报告研究的风险结果
Springer Series in Reliability Engineering Pub Date : 2019-09-12 DOI: 10.1007/978-1-4471-7448-6_16
J. Vinnem, W. Røed
{"title":"Presentation of Risk Results from Studies","authors":"J. Vinnem, W. Røed","doi":"10.1007/978-1-4471-7448-6_16","DOIUrl":"https://doi.org/10.1007/978-1-4471-7448-6_16","url":null,"abstract":"","PeriodicalId":344910,"journal":{"name":"Springer Series in Reliability Engineering","volume":"48 11","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132708531","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信