{"title":"Reducing Human Error Through Automatic Kick Detection, Space Out and Dynamic Well Monitoring","authors":"Francesco Curina, Elia Abdo, Hadi Mustapha","doi":"10.2118/208784-ms","DOIUrl":"https://doi.org/10.2118/208784-ms","url":null,"abstract":"\u0000 Influx detection and well control are critical situations where the traditional human reaction has been the accepted standard for years. This paper discusses the results of the driller stress tests and the implementation of a system to assist the operator in kick detection, space out and preparation for well shut in. The system implements dynamic well monitoring to reduce the risk of false alarms. The objective is to prove how automation helps mitigate human factors.\u0000 A stress analysis test was conducted on a variety of experienced drillers to identify the specific operations with the highest risk factors influenced by operator stress. Once the target operations were identified, an automation algorithm was designed and tested to mitigate the human factor during these specific instances. The resulting system detects drilling kicks and automatically performs the space out operation. Dynamic trip and active tank monitoring were implemented to reduce false alarms. This provides the driller with an assistant for tripping operations. The package can be adapted to any type of rigs or blow out preventer (BOP) stacks without requiring additional hardware.\u0000 Testing was conducted in both simulated and real-life situations, during tripping and drilling operations. The system was able to predict tool joint positions in the well with a mean error consistently below 1%. The automation of the space out operation allowed the system to perform the operation in significantly shorter times and with higher accuracy, eliminating the risk of any tool joint being placed across BOP elements. During tripping operations, dynamic tank tracking effectively eliminated risks of kicks helping the driller keep a constant and adequate filling of the well. Finally, a comparison of the operator stress levels with and without the use of the automation package shows the positive impact such a system can have on situational awareness and concentration. The plug and play aspect of the system proved critical for easy and fast implementation, as well as ensuring a quick familiarization of the driller with the different functionalities. The tests also highlighted the importance of accurate and high-resolution sensors to ensure optimal working conditions.\u0000 Automation in the field of well control is a relatively new subject. This paper showcases the impacts this type of systems can have on operations and proposes an implementation method to profit from automation while minimizing its impact on critical operations. The field implementation showed how different sensor configurations can lead to different degrees of automation and, thus, different impacts on the operations.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124941313","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
M. Yi, P. Ashok, D. Ramos, Spencer Bohlander, T. Thetford, Mojtaba Shahri, Mickey Noworyta, T. Peroyea, M. Behounek
{"title":"Automated Merging of Time Series and Textual Operations Data to Extract Technical Limiter Re-Design Recommendations","authors":"M. Yi, P. Ashok, D. Ramos, Spencer Bohlander, T. Thetford, Mojtaba Shahri, Mickey Noworyta, T. Peroyea, M. Behounek","doi":"10.2118/208745-ms","DOIUrl":"https://doi.org/10.2118/208745-ms","url":null,"abstract":"\u0000 During the construction planning phase of any new well, drilling engineers often look at offset well data to identify information that could be used to drill the new well more efficiently. This is generally a time-consuming process. The objective was to develop a recommender system that would automate the process of identifying potential hazards and current technical limiters.\u0000 The developed methodology consisted of three parts. First, a system is developed that can parse textual information found in daily reports to identify key events that occurred in offset wells. Second, time series data from these same offset wells is processed to identify events directly from the patterns in the data, and a reconciliation is done between the time-series data and the contextual data wherever there is a conflict between the two datasets. Finally, KPIs are computed that enable the comparison of various drilling choices and their consequences across the set of offset wells and recommendation are automatically generated for improvements in the construction of a new well.\u0000 The system was developed on a set of 7 recently drilled wells chosen from a specific North American land operation. The recommendations were compared to recommendation made through manual processing of the data for validation of the approach. The recommender identified invisible lost time (ILT) and potential non-productive time (NPT) scenarios, optimal depth-based drilling parameter for the new well, and recommendations on BHA and flat time improvement areas. Open-source natural language processing libraries were used in this project and were very effective in extracting events from textual data.\u0000 An automated system was built to guide the drilling engineers in the planning phase of a well construction activity. Given a set of offset wells, the system combined both the time series data and textual data to arrive at these recommendations. The approach upon further refinement is expected to save 30 to 40 hours of the engineer's time per well and shorten the learning curve.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"34 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127765366","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Influx Management Decision Tree for Deep Water Managed Pressure Drilling Operations with a Below Tension Ring Surface Back Pressure System","authors":"R. van Noort, P. Spriggs, L. Arseneault","doi":"10.2118/208717-ms","DOIUrl":"https://doi.org/10.2118/208717-ms","url":null,"abstract":"\u0000 Managed Pressure Drilling (MPD) in Surface Back Pressure (SBP) mode can recover from an influx efficiently if well conditions, MPD system capabilities and recovery procedures are understood and executed accordingly. A considerable number of operational and contingency procedures are required to execute MPD on a deepwater rig. The Driller remains responsible for well safety and he/she must work with the MPD Operator to conduct these procedures expediently to remain within the agreed MPD operational envelope. Changes in conditions, especially when an influx is detected, requires an immediate and correct response between the Driller and MPD Operator. It can be challenging to have multipage procedures for rig floor personnel to react to an influx. By the time the procedure is referenced, the influx may have exceeded the agreed MPD Operations Matrix’ limits.\u0000 This paper's authors have developed a concise decision tree to better enable the Driller and MPD Operator's response to a potential influx. Certain steps need to be taken quickly by both members to limit influx size and stay within the agreed MPD Operations Matrix. Depending on influx size, water depth and well depth, further decisions may need to be taken to either circulate the influx up the riser or perform a MPD assisted shut in. The aid that has been developed and implemented on a recent deepwater well, is the MPD Influx Management Decision Tree (IMDT).\u0000 The IMDT is a single page, graphical representation of a multipage procedure normally written for influx management in MPD operations. Using decision tree logic shapes, as well as an assigned color scheme, the Driller and MPD Operator can quickly navigate the MPD influx management procedure to bring the well under control.\u0000 The IMDT:\u0000 Prescribes who does what action and in what sequence. Is consistent with the MPD Operations Matrix color scheme (yellow, red). Illustrates decision points to be made by the Driller / MPD Operator as they execute the procedure.\u0000 IMDT specific content may vary from project to project. The value of IMDT is in how the agreed steps are clearly, concisely and logically conveyed to the Driller and MPD Operator. The one-page format means both the Driller and MPD Operator can have it readily available should it be required.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"62 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134111066","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
I. Ceyhan, N. Pilisi, P. Suryanarayana, R. Krishnamurthy
{"title":"Design of Carbon Capture and Sequestration CCS Wells","authors":"I. Ceyhan, N. Pilisi, P. Suryanarayana, R. Krishnamurthy","doi":"10.2118/208738-ms","DOIUrl":"https://doi.org/10.2118/208738-ms","url":null,"abstract":"\u0000 This paper discusses a methodology for the design of wells in carbon capture and sequestration (CCS) projects. In addition to carbon dioxide (CO2) injection wells, CCS wells include observation or monitoring wells, as well as utility wells, which are used to reduce pressure by removing formation water.\u0000 The paper first outlines the differences between CCS wells and conventional oil and gas wells. These differences include much longer regulatory lifetimes, increasing pressure over well lifetimes, inherently corrosive environment, intermittent operation and large variation of CO2 injection stream properties depending on its impurities. These differences require a different approach to well design for CCS projects. A well design philosophy, which has been developed to address these differences, is presented. The paper outlines the material selection guidelines and tubular load cases. The design philosophy, material guidelines and load cases are illustrated through several example well designs.\u0000 For CCS wells, the design should start with the completion size required to achieve the desired CO2 injection rate, and progress outwards. Dual containment is essential; the second barrier must not only be designed for the corrosive environment, but the second barrier and its associated equipment must be periodically inspected or tested. All CCS wells, including injection, monitoring and utility wells, must be designed for potential CO2 exposure. Highest loads may be imposed during transient or upset operations, and may originate from changing thermal conditions. Cement integrity is essential to prevent undetected migration of stored CO2 out of the storage zones. Finally, it is necessary to have pre-prepared contingency plans to detect, shut-in, kill, repair and/or P&A failed wells.\u0000 The differences between CCS wells and conventional oil and gas wells require a different approach to well design. If CCS wells were to be designed using conventional methods, the wells might fail to maintain their integrity, thus resulting in the failure to contain injected CO2 in the sequestration zone.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117013726","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Anwesha Mal, Sven Inge Ødegård, Stig Helgeland, Samuel Zulkhifly Sinaga, Morten Svendsen
{"title":"Prediction of Stuck Pipe Incidents Using Models Powered by Deep Learning and Machine Learning","authors":"Anwesha Mal, Sven Inge Ødegård, Stig Helgeland, Samuel Zulkhifly Sinaga, Morten Svendsen","doi":"10.2118/208778-ms","DOIUrl":"https://doi.org/10.2118/208778-ms","url":null,"abstract":"\u0000 One of the most common issues faced in the Drilling industry is a Stuck Pipe situation. Stuck Pipes lead to huge losses in cost, energy and productive time. The objective of this paper is to predict stuck pipe incidents prior to their occurrence by harnessing the power of machine learning and deep learning models.\u0000 Stuck incidents are some of the most difficult and challenging situations. The proposed method uses a two-step model and available historical data from prior drilling operations to predict the occurrence of such an incident well in advance so that it can be avoided. The first step of the model performs time series predictions using a Recurrent Neural Network (RNN) with Walk Forward Validation. The second part of the model uses a Random Forest Classifier to classify the predictions from the previous step and determine if a stuck situation is likely. The classification model is pre-trained using historical drilling operational data collected from old wells. It is possible to determine how far back the model should look at the data and how far ahead it should predict. For the purpose of this paper, the model looks back 5000 timesteps and predicted 3000 timesteps ahead. One timestep is 2 seconds in this case.\u0000 This model would be able to reduce nonproductive time, and help make drilling operations cleaner, faster and greener. The biggest benefit of such a model is that it can learn on the go and would not require manual intervention. Also, the model can upgrade and modify itself to changes in the drilling operations.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"128 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127391984","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
S. S. Yalamarty, Kriti Singh, M. Kamyab, C. Cheatham, Vladimir Crkvenjakov, Kelly Flurry
{"title":"Early Detection of Well Control Kick Events by Applying Data Analytics on Real Time Drilling Data","authors":"S. S. Yalamarty, Kriti Singh, M. Kamyab, C. Cheatham, Vladimir Crkvenjakov, Kelly Flurry","doi":"10.2118/208770-ms","DOIUrl":"https://doi.org/10.2118/208770-ms","url":null,"abstract":"\u0000 Kick events are some of the most life-threatening and environmentally disastrous events during drilling. Identifying potential kick events in time is valuable. Several hybrid algorithms combining physics and data analytics have been developed to help identify potential kick events from trends in real-time drilling data. These algorithms encompass all drilling operations like drilling, tripping, circulating, and making connections. The goal is to enable management by exception in real-time monitoring of wells.\u0000 Real-time drilling data acquired from the sensors on the rig and other static metadata like drill string and casing specifications are used in these hybrid algorithms. The exact data channels from the real-time data used differ based on the drilling operation the algorithm is associated with, but the most important ones are flow rate in (FLOWIN), flow out percentage (FLOWOUT), pump strokes per minute (SPM), active pit volume (PITACT), and trip tank volumes (TTKVOL). Additional data channels like lag depth and rig states are computed from these existing channels to help the algorithms. Other provisions have been made in the algorithms to automatically account for human operations like lining up with trip tanks and addition/removal of pits from active pit volume. To identify the potential kicks: data from trip tank volumes are utilized while tripping, flowback signatures calculated from PITACT are used during connections, and real-time hole displacement (HDISP) calculated from PITACT and lag depth is used while drilling. All the algorithms have been parameterized to facilitate easy tuning of thresholds. An alerting system has been implemented that triggers an alarm when the algorithms identify a potential kick event. This system can also send notifications to a real-time support team or field personnel.\u0000 Historical offset wells provided by an operator were used for testing the algorithms and fine-tuning the thresholds. We achieved a 12% false-positive rate while correctly identifying all the true well control kick events. False positives are defined as events identified by the algorithms as potential kicks but were due to some explainable operation that was accounted for in the algorithm scope. The user feedback from the alerting system was also used to improve the accuracy of the algorithms. The calculated data channels used to identify the potential kicks can also be displayed as real-time traces or in other suitable visualizations like a trip sheet or flowback fingerprints.\u0000 These algorithms were designed to be run with minimal user input. This makes them suitable for use by real-time support centers and field personnel. The ability to calculate the lag depth and incorporate that into the analysis is novel and improves the accuracy. The provisions in the algorithm to account for human operations that affect pit volumes also add to the novelty.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125334388","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Yifan Zhang, Zeyu Yan, P. Ashok, Dongmei Chen, E. van Oort
{"title":"Drilling Hard Abrasive Rock Formations with Differential Hydraulic Hammers: Dynamic Modeling of Drillstring Vibrations for ROP Optimization","authors":"Yifan Zhang, Zeyu Yan, P. Ashok, Dongmei Chen, E. van Oort","doi":"10.2118/208670-ms","DOIUrl":"https://doi.org/10.2118/208670-ms","url":null,"abstract":"\u0000 In deep oil, gas, and geothermal well construction, percussion drilling is sometimes used to improve rate of penetration (ROP) and promote drilling efficiency when breaking hard abrasive rocks (with a uniaxial compressive strength (UCS) > 25 kpsi). Down-the-hole (DTH) differential pressure hydraulic hammers can be used to convert the hydraulic energy of the drilling mud into the percussion energy necessary for rock destruction. The appeal of using DTH hammers for deep hard rock drilling is that this is a highly mature, low-cost, and proven technology. Lacking, however, is a good model to describe mud hammer operation, allowing mud hammer parameters to be tuned for ROP optimization in hard rock environments.\u0000 In this study, bond graph models are used to investigate the hydraulic and mechanical dynamics of typical DTH hammer stroking cycles. The Colebrook-White equation is used to derive the Darcy-Weisbach friction factor for pressure loss caused by the turbulent flow between hammer chambers. The interactions between the hammer, the bit, and the formation are represented by three mass-spring mechanical systems with various degrees-of-freedoms (DOFs). Rock breaking is modeled using an anisotropic non-linear spring, which can represent the depth of the penetration of the hammer's indenters into the rock. This spring model also allows for seamless integration with the system model.\u0000 Dynamic percussion drilling behavior is simulated for various rock stiffness values while varying hammer parameters, such as input hydraulic pressure and piston-bit mass ratio. The simulation results provide estimations of both ROP and system energy transfer efficiency (ETE) expected for given hard rock drilling scenarios. The developed model can be used to optimize mud hammer parameters, which in turn will benefit ROP optimization in hard rock environments encountered while drilling deep oil and gas or geothermal wells.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129277715","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"New-Generation Geothermal Wells – How the Upstream Oil and Gas Industry Can Bring Its Experience to Bear","authors":"John J. Clegg, S. Krase","doi":"10.2118/208747-ms","DOIUrl":"https://doi.org/10.2118/208747-ms","url":null,"abstract":"\u0000 As renewables are forecast to take a larger and larger slice of the energy mix going forward, the upstream oil and gas industry needs to look at whether and how it can be involved with these new sources of energy in order to maintain its share of the energy mix. Providers of services and technology to the industry should be thinking about how they might be able to apply their skills and capabilities in other, adjacent industries and should begin to think of themselves as energy service companies and not oilfield service and oilfield equipment supply companies.\u0000 As the world searches for and attempts to bring on alternative sources of energy, the \"holy grail\" is a renewable energy source that can provide 24/7 baseload power without releasing greenhouse gases. Wind and solar both have issues with intermittency and therefore with capacity, and will require additional storage capacity – for example, batteries – in order to be able to deliver baseload. More traditional energy sources suffer from significant greenhouse gas emissions. Geothermal is currently the only source of energy which has the potential to provide clean power at scale and in a way that can provide uninterrupted baseload for an electrical grid – without the requirement for storage and the unnecessary consumption of resources this would entail. Serendipitously, geothermal drilling also has many similarities with drilling for oil and gas. The paper will review how geothermal installations are evolving beyond traditional hydrothermal wells and how they will include closed loop systems which seek to extract heat, and not hot water or steam, from the Earth.\u0000 This paper describes the various types of new geothermal systems that have been proposed with some commentary on what has been achieved to date. It identifies both similarities and differences between the various well types required for these \"unconventional\" geothermal systems and the many different challenges in terms of well design and construction that our industry has developed, and perfected over more than 100 years. The similarities that are identified can be thought of as near-term opportunities for the oil and gas drilling industry to apply its skills, technologies and people to this new and growing sector.\u0000 The differences can be thought of as challenges that our industry will have to overcome in order to be a valuable part of the inevitable transition that will take place in the near future.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"11 2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123663580","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Advanced Transient Hydraulic Simulations to Safely Optimise Tripping Speeds","authors":"R. Bacon","doi":"10.2118/208763-ms","DOIUrl":"https://doi.org/10.2118/208763-ms","url":null,"abstract":"\u0000 There are many factors that contribute to non productive time, these include but are by no means limited to Lost circulation, formation influx, pack-offs and other stuck pipe events which cause delays, problems, lost time, and generally increase risk, and cost of the well, during drilling operations. Such situations can, sometimes, escalate into serious problems that may result in expensive and undesirable technical sidetracks. Couple this with ever more complex wells, (whether they be long horizontal sections, multi-laterals, etc), drilled in ever smaller and more challenging reservoirs, such as those which are depleted, or at high pressure and or high temperature.\u0000 The modelling software offers forward-looking simulations that can be used to predict drilling problems and assess the likely effects of remedial options. During real-time monitoring, advanced monitoring and trend analysis software can use downhole conditions and mud properties to forecast hole cleaning, equivalent circulating density (ECD), and temperature changes for the next depth/time interval, based on three tightly coupled real-time dynamic models – hydraulic, mechanical and thermodynamic – that simulate wellbore condition and characterize improvement or deterioration during drilling. These models continuously assess drilling performance, borehole conditions, and associated risks based on real-time symptom detection.\u0000 The solution and concept presented in this paper showcases a modelling approach which allows all of these situations to be accurately modelled in a transient setting, and then also compared and back modelled using all the available real time high frequency data. This coupled with an automated drilling control system has resulted in safe, record-breaking drilling achievements in the North Sea. The models allow updated safeguards to be applied to the drilling control system to maintain a downhole pressure within the acceptable limits of the open hole formations. It also automatically stops the movement of the drill string in case of abnormal hook loads or surface torques. Since automatic actions can be triggered in case of an unexpected situation, some standard procedures have been fully automated, including friction tests and back-reaming.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130377346","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
B. Pelton, Derek Adam, Garrett Granier, W. Turner, D. Téllez, J. Willis
{"title":"Unconventional Bradenhead Cementing in the Delaware Basin – Case History","authors":"B. Pelton, Derek Adam, Garrett Granier, W. Turner, D. Téllez, J. Willis","doi":"10.2118/208756-ms","DOIUrl":"https://doi.org/10.2118/208756-ms","url":null,"abstract":"\u0000 This Delaware Basin case history describes a bradenhead cementing method that improves zonal isolation and top of cement (TOC). Common solutions for cementing depleted formations include stage tools, low-density slurries and reverse circulation. For this bradenhead method, cement is pumped through the wellhead valves and down the annulus to a target loss zone. Field data, lab data and the engineering model support the improvement bradenhead cementing provides across depleted formations.\u0000 The depleted Brushy Canyon formation serves as an injection interval for a two-stage bradenhead cement job. This approach isolates formations below the Brushy Canyon with a conventional first stage, while achieving TOC with the second stage pumped down the annulus. Fracture gradients of the injection interval and casing shoe constrain the cement design. To achieve adequate cement placement, the design phase includes the pressure calculations required to initiate flow and injection for the bradenhead stage. Reactive spacers are utilized to prevent annulus fluid level drop in extreme cases. A benchmarked cement bond log (CBL) quantifies the results and validates this unconventional cementing method.\u0000 More than 50 two-stage bradenhead cement jobs were executed with a TOC success rate of 100% in intermediate and production hole applications. CBL data obtained after cementing the intermediate casing confirms the two-stage bradenhead as a placement method. In areas constrained by casing shoe pressures, CBL data identified potential areas of shallow injection. These data resulted in a modification of the fluids pumped. Use of these re-engineered fluids reduced injection initiation pressures and improved cement bonding across salt and anhydrite formations. Cementing costs were reduced by eliminating stage tools, annular casing packers, and low-density cement slurries. Pumping the bradenhead job offline (off the rig's critical path) reduces cost further. These features support bradenhead cementing as an effective solution for wellbore sections with a potential injection zone.\u0000 The regulatory requirement to place cement above depleted formations resulted in many innovative cementing methods. Stage tools, low-density slurries, and reverse circulation are attempts to avoid formation breakdown, but these methods increase cost and have limited reliability and integrity. Bradenhead cementing takes advantage of the depleted interval to aid in cement placement. Although counterintuitive, bradenhead cementing has proved to be a cost-effective solution that improves zonal isolation and eliminates integrity risks associated with stage tool failures.","PeriodicalId":340337,"journal":{"name":"Day 2 Wed, March 09, 2022","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133479404","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}