Day 2 Tue, August 28, 2018最新文献

筛选
英文 中文
Thailand Joint Development Project Delivers 200°C M/LWD Triple Combo: Eliminating Wireline, Driving World Class Efficiency and Slashing Days Per Well 泰国联合开发项目提供200°C M/LWD三重组合:消除电缆,提高世界级效率,减少每口井的作业时间
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-27 DOI: 10.2118/191054-MS
Thakornpol Kleawyothatis, J. Pruimboom, S. Dendandome, N. Pisarnbut, P. Thipmongkolsilp
{"title":"Thailand Joint Development Project Delivers 200°C M/LWD Triple Combo: Eliminating Wireline, Driving World Class Efficiency and Slashing Days Per Well","authors":"Thakornpol Kleawyothatis, J. Pruimboom, S. Dendandome, N. Pisarnbut, P. Thipmongkolsilp","doi":"10.2118/191054-MS","DOIUrl":"https://doi.org/10.2118/191054-MS","url":null,"abstract":"\u0000 There is no longer a requirement to run wireline Triple Combo logs in deep, high temperature wells. A joint development project has successfully delivered the world's first high-temperature M/LWD Triple Combo suite rated for 200°C [392°F]. Results to date are compared with previous performance in the Gulf of Thailand (GoT).\u0000 The new suite required a ground-up redesign of printed circuit board (PCB) electronics in order to meet the temperature qualification criteria of 200 hours at 200°C [392°F], with a survivability of 210°C [410°F] for four hours. The suite's sensors were developed in two phases, each with four milestones, over a period of 36 months. Initial rigorous thermal qualification was followed by harsh thermal vibration qualification testing routines. Several PCB redesigns were required in order to finally pass this testing. Ultimately, five prototype triple combo suites of tools were delivered to Thailand, on time and on budget, for in-situ field testing.\u0000 M/LWD Triple Combo field trials commenced offshore in the GOT, in fields exhibiting some of the global industry's most demanding drilling environments with respect to high rates of penetration [and accompanying punishing levels of vibration], extreme temperatures and significant well complexity. Compared to adjacent platforms with similar wells in the most challenging field, the new suite, together with other drilling efficiency measures, played a pivotal role in helping to reduce average days per well over 50% a considerable improvement. To date, more than 475,000 ft [145,000 m] have now been drilled in 71 GoT wells using this Triple Combo M/LWD technology. Furthermore, the new high-temperature Triple Combo M/LWD tools have been one of several key contributing factors in establishing two notable drilling records: drilling the GoT's longest well at 17,559 ft [5,532 m] and the longest single-bit run in the production section at 8,952 ft [2,729 m], without any failures at a maximum temperature of 199°C [391°F]. The suite provides additional benefits such as the provision of real-time annular pressure while drilling.\u0000 With this feature, engineers can closely monitor the equivalent circulating density (ECD) an important parameter for avoiding kicks and losses at up to 200°C [392°F].\u0000 The proven step change in drilling efficiency arising from this joint development can be attributed to the elimination of temperature mitigation measures and Triple Combo wireline logging, the problems associated with acquiring the wireline data, and an overall improvement in drilling practices.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"50 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134532664","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Development of Low Toxicity and High Temperature Polymer Drilling Fluid for Environmentally Sensitive Offshore Drilling 海洋环境敏感钻井用低毒高温聚合物钻井液的研制
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-27 DOI: 10.2118/190967-MS
Liu Xiaodong, Binqiang Xie, Yonghui Gao, Huilin Gu, Ma Yongle, Zhang Yong, Ruxin Zhang, Qingyang Li
{"title":"Development of Low Toxicity and High Temperature Polymer Drilling Fluid for Environmentally Sensitive Offshore Drilling","authors":"Liu Xiaodong, Binqiang Xie, Yonghui Gao, Huilin Gu, Ma Yongle, Zhang Yong, Ruxin Zhang, Qingyang Li","doi":"10.2118/190967-MS","DOIUrl":"https://doi.org/10.2118/190967-MS","url":null,"abstract":"\u0000 It brings severe challenges to drilling fluids when drilling high temperature deep well in environmentally sensitive sea area and facing strict environmental protection laws and regulation requirements meanwhile, the toxic value of drilling fluid must reach up the standard requirement of 30,000 mg/L.A new, environmentally safe water-based polymer system has been developed for drilling applications with temperatures resistance to 200°C and biological toxicity value LC50 more than 100,000 mg/L.\u0000 The new system consists of two basic polymeric components for high temperature rheology and filtration control, along with a special nano-plugging agent, glycol shale inhibitor, extreme pressure lubricant, and barite or formate weight material, providing superior performance for a variety of drilling environments. The system shows the base slurry is light colored and non-toxic to the marine environment, which can be discharged directly into the sea. The environmental friendly feature is a significant superiority over traditional high-temperature systems, such as sulfonated drilling fluid and oil-based drilling fluid which normally require the use of a large number of poisonous additives.\u0000 Experiments show that the new system has three important characteristics. Firstly, thermal stability time is more than 72h when aging at 200°C, HTHP filtrate loss is in the range of 12 to 25mL between temperature of 150 and 200°C, and sodium chloride and calcium chloride pollution resistance reach up to 200,000ppm and 5,000ppm, respectively. Secondly, the characteristic of excellent lubricity and inhibition can be comparable to oil based drilling fluids. Thirdly, the low biological toxicity also is one the most important characteristic, 96h LC50 semi lethal concentration of artemia is more than 100,000 mg/L, and EC50 median effective concentration of luminescent bacteria is more than 300,000 mg/L, which meet the biological toxicity discharge requirements for the first level sea area.\u0000 The extensive testing results of this new drilling fluid demonstrated its superiority characteristic and low biological toxicity to marine environment. Good results from field testing in Bohai offshore oil field are also presented, the deepest test well depth is 6066m, and the highest downhole temperature is 204°C.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125469853","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Overcoming the Challenges During Cementing Spacer Design for Deep Deviated HPHT Wells Containing Heavy Oil Based Muds 克服含稠油基泥浆的大斜度高温高压井固井隔离剂设计中的挑战
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191084-MS
A. Brandl, A. Doan, A. Alegria
{"title":"Overcoming the Challenges During Cementing Spacer Design for Deep Deviated HPHT Wells Containing Heavy Oil Based Muds","authors":"A. Brandl, A. Doan, A. Alegria","doi":"10.2118/191084-MS","DOIUrl":"https://doi.org/10.2118/191084-MS","url":null,"abstract":"\u0000 Insufficient wellbore cleaning prior the cementing job is considered to be the biggest single factor leading to poor zonal isolation results. A mud-spacer-cement program with suitable fluid needs to be carefully engineered for the given wellbore conditions to improve cementing quality. We discuss optimum spacer design features which are critical for the successful cementation of deep deviated HPHT wells containing heavy oil based muds and review a simulated scenario. Advanced lab test methodologies beyond industry standards are utilized to model more accurately the given complex downhole conditions.\u0000 A simulated >20,000 ft highly deviated wellbore was characterized by HPHT bottomhole conditions and the rheological performance of the cement spacer was critical to job success. The well needed a stable cement spacer that would not settle-out on the low side of the >14,000 ft horizontal section, which would potentially put the well at risk. The 16.17 ppg mud required an even higher-density spacer system to clean it effectively. But conventional high-density spacer systems only compound the settling challenge and the well's anticipated bottomhole temperature of 350°F was expected to compromise any additives that might stabilize the fluid systems. Therefore a lab study about spacer stability was performed using a HPHT rheometer and the dynamic settling test – an industry standard which was actually established for cement slurries but not for spacer fluids. We found that a conventional spacer failed at 350°F by showing a rapid decline in rheology to almost zero viscosity and severe settling. To overcome the settling issue, provide stability, and maintain a sufficiently high rheology profile at given 350°F, we re-designed the spacer by using a modified biopolymer which shows a delayed hydration and viscosification over time successfully counteracting the destructive thermal effects.\u0000 The mud-spacer-cement fluid train was eventually optimized showing good fluid compatibility and maintaining within the narrow, 1.6 ppg margin that separated the pore pressure from the fracture gradient. The cementing job was designed using an advanced fluid displacement software, which predicted high mud removal efficiency under these challenging conditions. In order to enable proper mud displacement, the Friction Hierarchy—a key design factor that is often difficult to achieve under the extreme HPHT well conditions—was achieved with the new spacer concept.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126155659","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Conical Diamond Element PDC Bit as a Breakthrough to Drill Hard Geothermal Formation in Indonesia 锥形金刚石元件PDC钻头是印尼硬地热地层钻井的突破
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191100-MS
Fatah Gunawan, Widoyo Krisnanto, M. Mardiana, Bonar Noviasta, Hendriyan Febriarto
{"title":"Conical Diamond Element PDC Bit as a Breakthrough to Drill Hard Geothermal Formation in Indonesia","authors":"Fatah Gunawan, Widoyo Krisnanto, M. Mardiana, Bonar Noviasta, Hendriyan Febriarto","doi":"10.2118/191100-MS","DOIUrl":"https://doi.org/10.2118/191100-MS","url":null,"abstract":"\u0000 In geothermal drilling application, one of the challenges faced by drilling engineers is the optimization of drilling bit which govern the key success of drilling performance. It should be aligned with recent key performance indicator such as meet the subsurface target comprehensively while optimizing the drilling cost. A typical formation in geothermal wells that consists of various types of volcanic and igneous rock should be identified carefully because the high range of hardness and abrasiveness value will respectively affect the bit. Hence, the improvement of conventional drilling bit should be carried out to enhance the drilling performance.\u0000 For so many years, Tungsten Carbide Insert (TCI) bits were implemented in the geothermal drilling application because it is believed to be the most effective bit to drill hard formation. However, the TCI bits are limited by the maximum revolution the bit can achieve before the bearing seal fails. In some application, it needs 3 to 4 TCI runs to finish 9.875-in section. Some of the bits were also pulled out of the hole with undergauged condition due to formation abrasiveness. Implementing a conical diamond element (CDE) on a PDC can increase the bit durability. CDE provides significant improvement of wear and impact resistance to the bit. The point loading of this cutter is more concentrated to the formation, allows the bit to remove the rock in more efficient way. It has been discussed that the CDE bit can improve the ROP and meterage drilled, eliminating the tripping time due to bit changes as it does not have KREV limitation, and has a better trajectory control.\u0000 Usually, 3-5 TCI bits were used to drilled 9.875-in section in one of geothermal well located in Hululais Field, Sumatera, with average meterage of 200 – 250 m per bit. Drilling dynamics FEA modeling was performed prior to the run of CDE bit to check the drill string vibration and provide stable drilling parameter roadmap for this bit. A CDE bit was run to drill this section and the result was excellent by drilling 600 m in a single run. The ROP was improved by around 35% compared to the maximum TCI's ROP. The bit generated less reactive torque fluctuation compared to TCI, allowed the bit to have better directional control. The CDE bit was pulled out of the hole with good dull grading (2-1-WT-A-X-I-CT-TD). By improving the ROP and eliminating the tripping time, the drilling cost can be reduced.\u0000 With the downturn of oil and gas business, geothermal projects in Indonesia is raising. CDE bit is becoming a breakthrough to optimize the drilling operation in by substituting TCI runs with huge amount of potential cost savings.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"54 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123453400","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Rig Time Optimization and Risk Mitigation Utilizing Through Drillpipe Logging Technique with Slim Wireline Logging Suite 利用通过钻杆测井技术和细缆测井套件优化钻机时间和降低风险
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191015-MS
H. Ngo, P. Chommali, Thanawat Charucharana, S. Rattanachan, K. Ung-Aram, P. Tangkaprasert, C. Thiangtham, V. Pinprayong
{"title":"Rig Time Optimization and Risk Mitigation Utilizing Through Drillpipe Logging Technique with Slim Wireline Logging Suite","authors":"H. Ngo, P. Chommali, Thanawat Charucharana, S. Rattanachan, K. Ung-Aram, P. Tangkaprasert, C. Thiangtham, V. Pinprayong","doi":"10.2118/191015-MS","DOIUrl":"https://doi.org/10.2118/191015-MS","url":null,"abstract":"\u0000 The Sirikit field is a mature reservoir located in the Phitsanulok Basin in north-central Thailand. The field produced first oil in late 1981. Typical logging programs include a complete set of openhole (OH) logging suites such as a triple combo, including gamma ray-neutron-density-resistivity, or quad combo including gamma ray-neutron-density-sonic-resistivity. The reservoir production and injection are carried out with commingled completion. Therefore, wireline formation testing, and sampling tools are usually included for acquisition.\u0000 Development wells with highly deviated trajectories pose challenges to conventional wireline logging (WL) operations, especially in deep wells exceeding 3,000m. In sections with high dogleg severity, the tools are prone to sticking, and the cable can become key-seated due to hole conditions, deviation, washouts or caving.\u0000 Log data is a vital component for studying geological complexity, completion and production planning. Therefore, there is a need for an alternative method to convey WL tools to reach the bottom of the hole. In 2015, an alternative conveyance method called \"through drillpipe logging\" (TDL) was proposed to mitigate the risk of WL tools sticking or hanging up in an openhole environment. This method uses a slim-chassis, 2.25 in. outer diameter (OD), WL logging suite that enables the tool to be run through the drillpipe. The first TDL job was trialed in Thailand in May, 2016 as the second run after the WL run hung up. This TDL run hosted a full triple-combo suite and WL formation testing tools, which reached total depth (TD) while overcoming hole-condition issues that had been experienced during the first run. Following this successful log run, the TDL has become the preferred contingency planning option to support WL operations in challenging wells. To date, a total of 64 jobs, including triple combo (TC), quad combo (QC), formation testing & sampling (FTS) and cross-dipole sonic (CDS) have been executed successfully with less operating time than conventional contingency processes involving wiper trips, tool pushing, or pipe conveyed logging. This track record confirms that TDL provides a fit-for-purpose solution for logging in challenging conditions.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"87 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126302523","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Drilling and Acidizing Sandstone Stringers—Sludge Characterization and Acid Interactions with Rock Minerals: Integrated Geochemical and Engneering Techniques 砂岩钻井和酸化-污泥表征和酸与岩石矿物的相互作用:综合地球化学和工程技术
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/190992-MS
Bander I. Ghassal, Abdullah M. Al Moajil, Sami Abdelbaqi, Abdullah Al Rustum
{"title":"Drilling and Acidizing Sandstone Stringers—Sludge Characterization and Acid Interactions with Rock Minerals: Integrated Geochemical and Engneering Techniques","authors":"Bander I. Ghassal, Abdullah M. Al Moajil, Sami Abdelbaqi, Abdullah Al Rustum","doi":"10.2118/190992-MS","DOIUrl":"https://doi.org/10.2118/190992-MS","url":null,"abstract":"\u0000 Understanding the sludge types and causes is essential to prevent various drilling issues especially during drilling of heterogeneous sandstone reservoirs where the permeability is variable. Moreover, acidizing these sandstone reservoir is challenging because of their inconsistent mineralogical types and contents resulting in different reactions behaviors with drilling fluids and acidizing recipes. The current study uses new techniques to assess sludge types.\u0000 The sludge characterization revealed two types that are different in appearance and composition. The first type is solid and characterizes by black to brownish colors, vitreous luster, and conchoidal fracture. This is described as bituminous sediments. The pyrolysis results elucidated that the sludge samples are composed of mixture of diesel and sloid bitumen/coal fragments. Therefore, the samples were investigated with organic microscopy techniques. The coal particles contain vitrinite, tellovitrinite and resinite and solid bitumen. Part of the samples were treated with Xylene to extract the hydrocarbon proportion. The result revealed that the sludge sample is composed of 70 wt% organic matter and remaining is inorganic. Calcite constitutes 82 wt% of the inorganic components leaving 18 wt% for silicate minerals. Since the majority of this sludge type 1 was dissolved by Xylene, this indicate that they represent solid bitumen which absorb oil based mud. This results in destabilizing the substrate which cause the bit to abort drilling. Therefore, water-based drilling is recommended in this case. On the other hand, the second sludge type is composed of fine grained sediments saturated with liquid hydrocarbon (mostly oil). A total of five sludge samples were characterized by high resolution pyrolysis and revealed variable Saturates, aromatic, resin and asphaltene percentages corresponding to different degree of oil and drilling fluid incompatibilities.\u0000 Sludge samples type 2 showed slight solubility in mutual solvents and xylene (i.e., 5-19 wt%) at 160°F. The dissolution of sludge samples type 2 in formic acid was higher than acetic acid when mixed with either ether-based mutual solvent or microemulsion solvent. The highest solubility values were obtained with mixtures of 5 wt% HCl mixed with solvents, showing solubilities between 79-88 wt%.\u0000 Coreflood experiments utilizing HCl/formic acid mixtures showed slight reduction in permeability (i.e. 20%) using highly permeable sandstone core plugs. Injection of HCl/Formic acid mixtures or 10 wt% formic acid in the presence of 0.4 vol% clay stabilizer showed reduction in perbeability by 5-13%. Althgouh, the coreflood experiments showed slight reduction in permeability, the CT scan results obtained showed significant increase in rock density along the core length for core plug No. 2 and 3, indicating occurance of chemical reactions with rock minerals that had insignificant impact on the core permeability.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"86 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115819575","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Assessing the Impacts of Groundwater Intrusion to Production Efficiency and Proposing Solutions to Enhance Oil Recovery from Fractured Basement Reservoir in SuTuDen Field, Offshore Vietnam 越南海上SuTuDen油田地下水入侵对生产效率的影响评估及提高裂缝性基底油藏采收率的解决方案
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191078-ms
X. Tran, T. Nguyen, T. Nguyen, K. Nguyen, N. Thai, Thanh Quoc Truong
{"title":"Assessing the Impacts of Groundwater Intrusion to Production Efficiency and Proposing Solutions to Enhance Oil Recovery from Fractured Basement Reservoir in SuTuDen Field, Offshore Vietnam","authors":"X. Tran, T. Nguyen, T. Nguyen, K. Nguyen, N. Thai, Thanh Quoc Truong","doi":"10.2118/191078-ms","DOIUrl":"https://doi.org/10.2118/191078-ms","url":null,"abstract":"\u0000 Based on the observed phenomenon of formation water intrusion in SuTuDen oilfield, i.e., high reservoir pressure, high constituent percentage of formation water in produced water, stable isotopes tracing, as well as strong-water drive mechanism confirmed by matching & calibrating the production parameters, the authors assessed the impacts of water drive to the production and proposed methods to enhance recovery.\u0000 The results of water analysis with low TDS (12g/l) indicate the formation water accounts for a significant ratio of the produced water.\u0000 Among factors affecting production efficiency, the critical ones are fault-fracture characteristics, origins of water, range of hydrodynamic relationship, design plans and well completion. In order to mitigate the negative impacts and increase the positive impacts of these factors, a series of intervention solutions must be considered including combined ESP-Gaslift installation, gas assisted gravity drainage, water or gas injection in selective zones, infill drilling in poorly connected areas.\u0000 The basement reservoir SuTuDen oilfield is affected by natural water aquifer hence it is necessary to implement recovery solutions such as adjusting the design, maintaining the reservoir pressure, in-fill drilling, artificial lift, stimulating the near-wellbore zone, optimizing the production-injecting regime.\u0000 When the wells have already been invaded by water, it is very difficult and costly to maintain the cumulative production. Therefore, the mitigation measures should be applied early from the design stage, especially the compatible operating regime, help reducing the water invasion and achieving optimal production.\u0000 The result of the methods should allow an increase in the overall recovery factor from 36.1% to 39.8%, equivalent to 18.52 MMbbl.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134065142","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Study to Evaluate the Effect of Using Expansion Materials with Cement Slurry for High-Pressure/High-Temperature Wells 高压高温井水泥浆中膨胀材料的效果评价研究
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191062-MS
A. Shafqat, S. Taoutaou, R. Abdurrahman, A. A. Maksoud, L. Otaremwa
{"title":"Study to Evaluate the Effect of Using Expansion Materials with Cement Slurry for High-Pressure/High-Temperature Wells","authors":"A. Shafqat, S. Taoutaou, R. Abdurrahman, A. A. Maksoud, L. Otaremwa","doi":"10.2118/191062-MS","DOIUrl":"https://doi.org/10.2118/191062-MS","url":null,"abstract":"\u0000 Oil and gas operators are facing more challenges than ever before to sustain production and to effectively minimize workover cost associated with remedial cementing. Previously, achieving the initial hydraulic seal with a good cement bond log was considered the only indicator of complete and durable zonal isolation throughout the lifetime of the well.\u0000 However, in a well drilled in a stressful environment, the initial zonal isolation can be jeopardized because of the changes in downhole conditions, primarily temperatures and pressures. Such cyclic changes in downhole pressures and temperatures generate radial cracks in cement and can cause the development of microannulus at casing/cement and cement/formation interfaces.\u0000 Extensive studies have been conducted in the past to understand the technical challenges to designing cement slurries with enhanced mechanical properties regulating the flexibility of set cement to withstand the stressful environment at downhole conditions. However, limited work has been done to evaluate the structural changes and impact on the set cement durability due to the requirement of expansion in set cement to eliminate the risk of microannulus.\u0000 A new methodology called industrial computed tomography is introduced to investigate the structural changes or cracks in set cement cured with various concentration of expansive additives. The novelty of this new methodology is that it represents a step change in defining the linear expansion requirement for given well conditions without jeopardizing the wellbore integrity.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"63 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131042710","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Experimental Study of Frictional Pressure Loss for Eccentric Drillpipe in Horizontal Wells 水平井偏心钻杆摩擦压力损失试验研究
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191046-MS
Milad Khatibi, E. Wiktorski, D. Sui, R. W. Time
{"title":"Experimental Study of Frictional Pressure Loss for Eccentric Drillpipe in Horizontal Wells","authors":"Milad Khatibi, E. Wiktorski, D. Sui, R. W. Time","doi":"10.2118/191046-MS","DOIUrl":"https://doi.org/10.2118/191046-MS","url":null,"abstract":"\u0000 The downhole friction is a response to mechanical and hydraulic forces. The mechanical friction takes place when the drillpipe is moving in the wellbore, either in translational or rotational mode. The hydraulic friction occurs due to the circulation of fluids flowing downwards in the pipe, and upwards in the annulus. The additional factors that affect the hydraulic friction are drillpipe rotation, surface roughness, wellbore geometry, etc.\u0000 This paper experimentally examines hydraulic friction and studies its variations with adjustable operational parameters (flow rate and rotational speed). The experiments were performed using two pipes, where one was located inside the other. The outside pipe with an inner diameter of 0.04 m simulated the wellbore walls, and the inside one simulated the drillpipe with an outer diameter of 0.025 m. The pipes’ inclination was 5° from the horizontal axis. The drillpipe could be rotated by an electric motor with speeds up to 1000 RPM (revolutions per minute). Spherical glass beads were used to simulate the cuttings behaviour in the wellbore. The pressure gradient variations associated with fluid flow, pipe rotation as well as particles movement was measured over the test section (length of 1.52 m), using a pressure transducer. In addition, a high-speed camera, installed outside the outer pipe, was used to take images of the particles distribution and pipe dynamic oscillations.\u0000 The combined effect of fluid flow rate, drillpipe rotation and presence of particles on the hydraulic friction between the outer and inner pipes is investigated in this study. The data analysis for the single-phase liquid flow showed that the pressure loss increased with RPM. It was seen that the secondary flow, created by the drillpipe rotation, was not the only reason to affect the pressure loss, but the drillpipe's eccentricity variations with RPM and flow rate also had a considerable effect. A higher drillpipe eccentricity provided lower friction factor, in the case single-phase liquid flow. Finally, empirical relations to describe the drillpipe eccentricity and hydraulic friction factor as functions of RPM and flow rate were proposed. When the particles were present, the friction factor decreased with RPM.\u0000 The above-mentioned conclusions and relations are valid for a Newtonian fluid in the turbulent regime.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115342351","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Unique Backup Cutter Layout Method Leads to Step Change in Bit Durability and Performance when Transition Drilling Through Hard Limestone Formations at High Inclinations 独特的备用切削齿布局方法,在高斜度硬石灰岩地层过渡钻进时,钻头耐久性和性能发生了阶梯式变化
Day 2 Tue, August 28, 2018 Pub Date : 2018-08-24 DOI: 10.2118/191059-MS
Kyle Vrnak, F. Boutot, S. Anderle
{"title":"Unique Backup Cutter Layout Method Leads to Step Change in Bit Durability and Performance when Transition Drilling Through Hard Limestone Formations at High Inclinations","authors":"Kyle Vrnak, F. Boutot, S. Anderle","doi":"10.2118/191059-MS","DOIUrl":"https://doi.org/10.2118/191059-MS","url":null,"abstract":"\u0000 In the mature fields in Norway's North Sea, extended-reach drilling (ERD) well designs were implemented to reach distant reservoir target zones. Resulting from this change, the 12.25-in. overburden section, which drills through mostly shale with various hard and thin dolomitic limestone sections, had to be modified from a 5,000- to 7,000-ft vertical section to a 10,000- to 12,000-ft section at a tangent inclination anywhere from 35 to 70°. Drill-bit designs that used to drill the vertical overburden section consistently in one run currently require up to three bits to complete the modified tangent sections caused by excessive damage to the diamond cutting structure.\u0000 An extensive study into the offset ERD wells and corresponding bit dull conditions helped identify that the cutting structure damage originated from high-point load impacts to the shoulder of the bit while transitioning through the thin, hard dolomitic limestone formations; the damaged cutters were being tangentially overloaded. Through further bit modifications, it was determined that this type of damage could not be addressed using typical bit design modifications (e.g., increased cutter density, increased blade count, etc.); therefore, a unique design solution was developed and implemented.\u0000 This solution involved combining analytical simulations and a dull condition analysis to develop an improved method for using the backup cutting structure to support the high tangential loading on the primary cutting structure during hard, high-inclination transitions. In most dual-row cutting structure designs, the backup cutters are on the same radial position as their parent primary cutters and are underexposed, engaging the formation only at a specific depth of cut or after the primary cutters are worn down a certain amount. When positioned as such, the backup cutters do nothing to support the tangential loading on the primary cutters. By moving the backup cutters actively on profile with the primary cutters and offsetting them to their own radial positions, the backups could now actively support the high tangential loads occurring on the primary cutters when engaging the hard dolomitic limestone.\u0000 This simple but unique modification enabled the bit to handle the transitions and drill the entire next 11,000-ft+ ERD section in one run while also providing the fastest rate of penetration (ROP) to date, with an increase ranging from 30 to 40% compared to previous runs. The success has been repeated a dozen more times since, each time providing a new record ROP for an ERD section. The improved dull condition could also allow for more efficient designs in the future for further improvements to drilling performance. The successful reduction of tangential impact damage could have implications for various bit designs globally that incur a similar dull condition.","PeriodicalId":326795,"journal":{"name":"Day 2 Tue, August 28, 2018","volume":"86 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115734203","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书