Risks Identification In Construction Of Jetty Projects: Literature Review 码头工程建设中的风险识别:文献综述
Rekayasa Sipil Pub Date : 2022-11-30 DOI: 10.22441/jrs.2022.v11.i2.02
Kiki Patricia Dewi, Jatmiko Kurniawan, Herman Irawan, H. Purba
{"title":"Risks Identification In Construction Of Jetty Projects: Literature Review","authors":"Kiki Patricia Dewi, Jatmiko Kurniawan, Herman Irawan, H. Purba","doi":"10.22441/jrs.2022.v11.i2.02","DOIUrl":"https://doi.org/10.22441/jrs.2022.v11.i2.02","url":null,"abstract":"Delays in project development often occur due to various risk factors that have not been identified during project implementation, resulting in increased project delays and unexpected costs. However, each construction project has different risks depending on the type of project and project environmental conditions, so it requires handling different project implementation methods.In a jetty project, risk assessment is carried out from both technical and non-technical perspectives. From a technical point of view, risks are assessed starting from soil conditions, water level, weather, installation methods, design changes, etc. Meanwhile, from a non-technical perspective, the risks arising from the environment, social and social aspects are assessed. economic, legal, and institutional aspects as well as finance and investment.This summary literature review shows that Technical Risk has the greatest impact on jetty projects in the internal and external project category.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"21 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74911324","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Pengembangan Manajemen Sumber Daya Manusia Berbasis PMBOK Untuk Meningkatkan Produktivitas Pada PT. AB 以PMBOK为基础的人力资源管理开发,以提高PT. AB的生产力
Rekayasa Sipil Pub Date : 2022-11-30 DOI: 10.22441/jrs.2022.v11.i2.01
Novika Candra Fertilia, Raden Yudityo Afri Adji
{"title":"Pengembangan Manajemen Sumber Daya Manusia Berbasis PMBOK Untuk Meningkatkan Produktivitas Pada PT. AB","authors":"Novika Candra Fertilia, Raden Yudityo Afri Adji","doi":"10.22441/jrs.2022.v11.i2.01","DOIUrl":"https://doi.org/10.22441/jrs.2022.v11.i2.01","url":null,"abstract":"Manajemen sumber daya manusia sangat mempengaruhi produktivitas (Bloom, N., & Van Reenen, J., 2011). Pengaruh tersebut dapat bersumber dari skill pekerja, attitudes, dan behavior (Katou, A.A., & Budhwar, P., 2015). Penerapan manajemen sumber daya manusia merupakan satu kesatuan dalam menentukan strategi yang kompetitiv (Neal, A., West, M.A., & Patterson, M.G., 2005). Penerapan manajemen sumber daya manusia secara sistematis dapat meningkatkan produktivitas sebesar 3.27% dari total produksi (Katou, A.A., & Budhwar, P., 2015). Sehingga, manajemen sumber daya manusia merupakan aspek yang sangat penting dalam banyak sector (Eze, M.O., 2018). PT. AB merupakan perusahaan yang bergerak pada sector fabrikasi precast yang cukup terkemuka di Indonesia. Namun, dalam rangka memenuhi pasokan kebutuhan precast, produktivitas di PT. AB tidak sesuai dengan jumlah yang telah ditargetkan, terutama pada produksi precast spun pile. Oleh karena itu, penelitian ini bertujuan untuk megetahui risiko yang berpengaruh tinggi terhadap perencanaan manajemen sumber daya manusia dan mengembangkan strategi di PT. AB. Pada penelitian ini, penilaian risiko dan pengembangan perencanaan manajemen manajemen sumber daya manusia dilakukan dengan berbasis PMBOK.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"35 36 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77614335","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Experimental and Numerical Analysis of Spun Pile-to-Pile Cap Connection with Reinforced Concrete infill Under Cyclic Loading 循环荷载作用下钢筋混凝土桩承台旋转连接的试验与数值分析
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.8
Alfetra Henoch Tandita, Y. Lase, A. Prakoso, M. Orientilize
{"title":"Experimental and Numerical Analysis of Spun Pile-to-Pile Cap Connection with Reinforced Concrete infill Under Cyclic Loading","authors":"Alfetra Henoch Tandita, Y. Lase, A. Prakoso, M. Orientilize","doi":"10.21776/ub.rekayasasipil.2022.016.03.8","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.8","url":null,"abstract":"Numerical study was conducted by using ABAQUS software to investigate two issues on spun pile connections. The issues are usage of non-shrinkage concrete infill cast inside hollow of pile and ductility. An experimental test was carried out to investigate the effect of two different concrete infill types which were common concrete fc’ 35 MPa and non-shrinkage concrete fc’ 54 MPa. A finite element model was validated against experimental test. The results were compared in terms of hysteresis curve, ductility, and performance level. Ductility is one of the important parameters to describe performance of spun pile connections under seismic load. There are different approaches to calculate ductility and this leads to four different ductility values. Hence, ductility of spun pile with concrete infill is in the range of 3.2 to 4.8. Behavior of spun pile with non-shrinkage concrete infill is slightly improved although the results were almost similar.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"55 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86485530","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Estimasi Dimensi Optimum dan Rasio Tulangan Gedung Hotel Yogyakarta dengan Artificial Neural Network
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.5
Kinanti Faradiba Harahap, Akhmad Aminullah, Henricus Priyosulistyo
{"title":"Estimasi Dimensi Optimum dan Rasio Tulangan Gedung Hotel Yogyakarta dengan Artificial Neural Network","authors":"Kinanti Faradiba Harahap, Akhmad Aminullah, Henricus Priyosulistyo","doi":"10.21776/ub.rekayasasipil.2022.016.03.5","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.5","url":null,"abstract":"Cost estimation at the conceptual design stage of a building is necessary because it is considered as a fundamental input in further decision making. This paper presented a neural network method in approximating the optimum dimension and the minimum reinforcement ratio of beams and columns at the conceptual design stage of hotel buildings in Yogyakarta. A group of 27 building variations were prepared as the training data for the set up neural network model. Fourteen empirical formulas were obtained which could be used to estimate the optimum dimension and minimum reinforcement ratio of beams and columns with 5 parameters which consist of soil sites class, beam spans, number of floors, concrete strengths and diameters of the reinforcing bar.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89281543","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Prediksi Umur Waduk Gunungrowo Setelah Pengerukan 预测落基山水库除皱后的年龄
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.3
Dyah ari Wulandari
{"title":"Prediksi Umur Waduk Gunungrowo Setelah Pengerukan","authors":"Dyah ari Wulandari","doi":"10.21776/ub.rekayasasipil.2022.016.03.3","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.3","url":null,"abstract":"In 2015 the Gunungrowo Reservoir was dredged to reduce sedimentation. After dredging, it is necessary to carry out sedimentation analysis to determine the reservoir life to be achieved. This analysis is intended to evaluate sediment deposition patterns that have occurred up to 2015 and calculate reservoir life that can be achieved after dredging in 2015. The reservoir life is analyzed based on how long the dead storage has been filled with sediment. Sediment entering the reservoir is calculated based on reservoir bathymetry and the suspended sediment entering reservoir. The result shows most of the sediment settles in the effective storage and the reservoir life can reach up to 243 years after dredging.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"18 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87349881","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Evaluation of Flexible Pavement Damage Using The PCI (Pavement Condition Index) Method Based on Core Drill Data, Case Study: on The Mandarin Road to The President Nicolao Lobato Roundabout and The Bebonuk Road in Dili City, Timor-Leste 基于岩心钻孔数据的PCI(路面状况指数)法评价柔性路面损伤,以东帝汶帝力文华路至总统Nicolao Lobato环形交叉路口和Bebonuk路为例
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.10
Brigida Freitas de Almeida, Krisnamurti Krisnamurti, A. Ratnaningsih, Akhmad Hasanuddin
{"title":"Evaluation of Flexible Pavement Damage Using The PCI (Pavement Condition Index) Method Based on Core Drill Data, Case Study: on The Mandarin Road to The President Nicolao Lobato Roundabout and The Bebonuk Road in Dili City, Timor-Leste","authors":"Brigida Freitas de Almeida, Krisnamurti Krisnamurti, A. Ratnaningsih, Akhmad Hasanuddin","doi":"10.21776/ub.rekayasasipil.2022.016.03.10","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.10","url":null,"abstract":"Localization and characterization of road damage are used in an effort to accelerate road repairs. The evaluation results were compared with field data and laboratory data. The results of the analysis show that the average PCI on the right side of the road reaches a value of 68 with a good rating good, on the left side it is worth 62 with a good rating good, and for the Bebonuk road section it is worth 39 with a bad rating poor. The average value of core drill is 86.85% and 99.92%, while the average PCI value is 35.36%. Asphalt content extracted with specifications 0.3, JMF 5.4% and penetration of 5.1%.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87439031","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Quality in Housing Project: Examining The Relationship Towards Labor Productivity, Rework and Customer Satisfaction Using PLS-SEM Approach 住宅工程品质:运用PLS-SEM方法检视劳动生产率、返工与顾客满意度的关系
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.2
Tanzil Budinata, B. Susetyo
{"title":"Quality in Housing Project: Examining The Relationship Towards Labor Productivity, Rework and Customer Satisfaction Using PLS-SEM Approach","authors":"Tanzil Budinata, B. Susetyo","doi":"10.21776/ub.rekayasasipil.2022.016.03.2","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.2","url":null,"abstract":"Housing market shows positive growth in Indonesia due to high demand for occupancy over the last few years. However, it has been well known that housing projects are prone facing various quality problems that bring adverse consequences for project performances, i.e., cost, schedule, productivity, and satisfaction of housing customers. The objective of this study is to investigate further relationship of quality performance against labor productivity, rework, and customer satisfaction. The hypothetical model was analyzed by using Structural Equation Model approach based on collected data through survey questionnaires of 45 respondents derived from site personnel of PT. Bumi Parama Wisesa which consist of several working divisions. The final model consists of 20 indicators in total reflecting all tested variables. From the results of the data analysis using PLS-SEM, it was revealed that quality performance has a strong relationship among the tested variables. Especially on customer satisfaction and rework variables. Customer satisfaction and rework have path coefficient value (β)0.325 and -0.558 respectively. With this result, it can be concluded that better-quality performance will improve customer satisfaction and rework reduction. The findings of this study provided important contribution for construction practitioners especially those who involved in the development of housing project to pay more attention in the implementation of quality management by developing effective and efficient project quality program. thus, labor productivity, reduction of rework and customer satisfaction can be significantly improved. Considering, housing projects vulnerable facing quality failure due to low-quality management on site were performed by mostly housing contractors in Indonesia.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"40 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90515602","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Evaluation of Penataran Train Fares During The Covid-19 Pandemic Using ATP-WTP Methods 基于ATP-WTP方法的Covid-19大流行期间Penataran火车票价评估
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.7
Nurhuda Firmansyah, A. Wicaksono, M. Anwar
{"title":"Evaluation of Penataran Train Fares During The Covid-19 Pandemic Using ATP-WTP Methods","authors":"Nurhuda Firmansyah, A. Wicaksono, M. Anwar","doi":"10.21776/ub.rekayasasipil.2022.016.03.7","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.7","url":null,"abstract":"Indonesian Railways Company must increase the fare for the Penataran Train due to additional operational costs in providing the COVID-19 health protocol. On the other hand, people experience a reduction in monthly income due to the lack of activities outside the home. Ticket prices must be adjusted to determine the number of subsidies borne by the government. This study aims to evaluate the fare of the Penataran Train using the Ability To Pay (ATP) and Willingness To Pay (WTP) methods. Questionnaires have been distributed to 417 respondents using the Google Form application. The results showed that the ATP was higher than the WTP 1 without passenger expectations, and the ATP was lower than the WTP 2 with passenger expectations. Restriction of seating capacity is the most expected service by respondents. The recommended fare is IDR 33,478.00/trip, and the public service obligation is IDR 54,816.00/trip.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"3 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72540285","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Selection of Floor Covering Materials Using Life Cycle Cost Analysis on The Apartment Development Project South Tangerang 基于全生命周期成本分析的南橘子公寓开发项目地板覆盖材料选择
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.9
Muhammad Mahesa Ramadhan, Indradi Wijatmiko, Y. P. Devia
{"title":"Selection of Floor Covering Materials Using Life Cycle Cost Analysis on The Apartment Development Project South Tangerang","authors":"Muhammad Mahesa Ramadhan, Indradi Wijatmiko, Y. P. Devia","doi":"10.21776/ub.rekayasasipil.2022.016.03.9","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.9","url":null,"abstract":"Developing an area can be started with infrastructure development. One example of such infrastructure is an apartment with a function as a means of residence and economic development in the area around the apartment. The South Tangerang X Apartment development project is one of the objects studied in this research. This study aims to select alternative materials for floor work based on the building cycle using life cycle cost (LCC) analysis with such a large project value. The research method used is Pareto diagram analysis to select the work to be analyzed. The LCC analysis uses a present worth analysis method with a gate-to-gate phase. This study indicates that the LCC analysis on Apartment Project X South Tangerang found the results on alternative KR1B HT floor work, namely alternative 2 of IDR. 1,437,912,015 on the KR1A HT flooring; the chosen alternative is alternative 2 of IDR. 989,177,787 on the chosen alternative KR4 HT floor work, namely alternative 2 of IDR. 1,510,914,248, and for the KR5A marble floor, the chosen alternative is alternative 2 of IDR. 617,202,771. The result of the LCC generated savings of IDR. 2,364,054,553.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"517 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77145141","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analisis Prioritas Penanganan Banjir Kali Konto, Provinsi Jawa Timur 东爪哇省Konto洪水处理的优先权分析
Rekayasa Sipil Pub Date : 2022-10-11 DOI: 10.21776/ub.rekayasasipil.2022.016.03.4
Dian Indrawati, M. B. Adityawan, Diki Maulana Ichsan, Dhemi Harlan, Joko Nugroho
{"title":"Analisis Prioritas Penanganan Banjir Kali Konto, Provinsi Jawa Timur","authors":"Dian Indrawati, M. B. Adityawan, Diki Maulana Ichsan, Dhemi Harlan, Joko Nugroho","doi":"10.21776/ub.rekayasasipil.2022.016.03.4","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.03.4","url":null,"abstract":"Flood in Kali Konto is a disastrous hazard which strikes a lot of housing, infrastructures and paddy fields along its river banks almost every year. In 2021, along with destroyed revertment at roolagh 70 area, flood inundated more than 10 villages in Kabupaten Jombang and several more in Malang and Kediri. However, flood management at Kali Konto needs special consideration because several conditions, include watershed area pattern, extremely slope condition changing, numerous materials from Kelud mountain eruption in several part of Konto river, and a lot of infrastructures which laid in Konto river. This paper discussed about appropriate infrastructures which derived from hydrology and hydraulics modeling for Q2 and Q50 flood return periods. Since the model resulted 49 locations, Analytical Hierarchy Process (AHP) model used for determining priority for scaling down flood hazard in Kali Konto. The most priority comes to Karang Tengah, Blaru and Bugasur Kedaleman area based on the most losses occurred.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"60 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77232622","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书